Skip to content
← Buyer search

Buyer profile

SHEMA

Every award we hold where this buyer named a supplier, in FRD13, France, from 12 Sept 2008 to 21 Sept 2026— with what is open now and what ends soon.

Awards

106

naming a supplier

Attributed value

€54.0m

59 shared, unvalued

Suppliers

359

awarded to

Active

2008–2026

first to latest award

Open right now

Notices from this buyer still open for bids, soonest deadline first. Each links to the buyer's own notice; deadlines are as published.

Accord-cadre de prestations topographiques et foncières de géomètre-expert - ZAC multisites du quartier de la gare à Gisors

open

Read it at boamp-fr ↗

SHEMA
boamp-frArchitectural, construction, engineering & inspection servicesdeadline 23 Nov 2026 · 7d left · as published

Consultation d'opérateurs pour la construction d'un programme de logements collectifs privés en accession sur l'ilot dit C3 - ZAC des Bassins, à CHERBOURG EN COTENTIN

open

Read it at boamp-fr ↗

SHEMA
boamp-frReal estate servicesdeadline 23 Nov 2026 · 8d left · as published

Remplacement de la centrale photovoltaïque en toiture des bâtiments D et E du site IMV Technologies à Saint-Ouen-sur-Iton (61)

open

Read it at boamp-fr ↗

SHEMA
boamp-frConstruction workdeadline 25 Nov 2026 · 9d left · as published

Construction d'un local à usage d'atelier/stockage et réaménagement partiel du rez-de-chaussée du bâtiment existant - site SPIE Nucléaire à Beaumont-Hague (50)

open

Read it at boamp-fr ↗

SHEMA
boamp-frConstruction workConstruction structures & materialsdeadline 7 Dec 2026 · 21d left · as published

Accord-cadre de maîtrise d'oeuvre à marchés subséquents pour la réalisation de deux éco-hameaux sur la commune de Dragey-Ronthon

open

Read it at boamp-fr ↗

SHEMA · €150k
boamp-frArchitectural, construction, engineering & inspection servicesdeadline 9 Dec 2026 · 23d left · as published

Mission de préventeur pour le chantier de la nouvelle unité de production industrielle FRAMATOME sur la commune des Pieux (50).

open

Read it at boamp-fr ↗

SHEMA
boamp-frArchitectural, construction, engineering & inspection servicesEducation & training servicesFRD11FRH03deadline 14 Dec 2026 · 28d left · as published

Accord cadre de maîtrise d’œuvre urbaine à marchés subséquents pour la requalification de la friche industrielle La Moutardière pour y créer un quartier d’affaires autour de la gare d’Yvetot.

closed

Read it at boamp-fr ↗

SHEMA
boamp-frArchitectural, construction, engineering & inspection servicesFRD22published 24 Jul 2026

Maîtrise d'oeuvre urbaine pour l'aménagement de la ZAC du quartier de la gare à Gisors

closed

Read it at boamp-fr ↗

SHEMA
boamp-frArchitectural, construction, engineering & inspection servicesFRD11FR101published 22 Apr 2026

Contracts ending soon

Awards whose notice published a contract end date in the next eighteen months, among awards published in the last 5 years. A notice without an end date is not listed — nothing is inferred.

None of this buyer's recent award notices published a contract end date inside the window.

Awards by year

2008not attributable1 award
2009€23.8m5 awards
2010€1.3m2 awards
2011€4.3m5 awards
2012€7.7m3 awards
2013€7.8m4 awards
2014€2.7m2 awards
2015€2.8m3 awards
2017€1.2m4 awards
2018not attributable3 awards
2019€423k9 awards
2020not attributable7 awards
2021€213k18 awards
2022not attributable12 awards
2023€1.2m10 awards
2024€369k4 awards
2025€313k11 awards
2026not attributable3 awards

Selling to them?

Get this buyer's new notices in a daily digest, scored against your own capability — plus the full record behind each award, with the documents and contacts it published.

Start 7-day free trial

How this profile is built

Awards are collected from official public procurement notices and deduplicated so one procurement counts once. The buyer's published spellings are grouped by case, punctuation and spacing only — this profile holds 3 of them; nothing that could mark a different body is removed, so a council and its housing department, or a trust and its charity, stay separate. An award counts here only where its notice named at least one supplier. Value is attributed only where the notice is explicit: a supplier's own itemised amount, or the whole value where one supplier was named. Awards naming several suppliers without a published split are counted and marked shared, never valued; a framework ceiling is never treated as money a supplier won; nothing is estimated. Every currency is reported separately, never summed. Contract end dates are the ones the notice published, looked for among awards published in the last 5 years. The linked source notice is authoritative.