Supplier profile
107 ARCHITECTURE
Every public-sector award we hold for this supplier, across France, from 30 May 2014 to 30 Apr 2026.
Awards won
9
all time
Attributed value
€86k
6 shared, unvalued
Buyers
7
public bodies
Active
2014–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Commissariat à l'énergie atomique et aux énergies alternatives | 2 | €86k |
| EHPAD Maison de la Forêt | 2 | not attributable |
| CHU Lyon | 1 | not attributable |
| Hospices Civils de Lyon | 1 | not attributable |
| Semcoda | 1 | not attributable |
| mairie du Monêtier les Bains | 1 | not attributable |
| Établissement thermal d'Évaux-les-Bains | 1 | not attributable |
What they win
Awards
All 9 awards we hold
- France – Construction work for buildings relating to health – Centre Hospitalier Le Vinatier - Marché global sectoriel portant sur la construction du Centre Ambulatoire de Psychiatrie Enfant et Adolescent à Rillieux-La-Pape ↗Hospices Civils de Lyonshared awardawarded 30 Apr 2026
- Centre Hospitalier Le Vinatier - Marché global sectoriel portant sur la construction du Centre Ambulatoire de Psychiatrie Enfant et Adolescent à Rillieux-La-Pape ↗CHU Lyonshared awardawarded 29 Apr 2026
- France – Architectural, construction, engineering and inspection services – Mission de maîtrise d’œuvre portant sur la réalisation du réaménagement partiel de l’étage R+1 du bâtiment D1 situé sur le site du CEA/Grenoble ↗Commissariat à l'énergie atomique et aux énergies alternatives€86kawarded 26 Sept 2025
- France – Architectural, construction, engineering and inspection services – Concours de maîtrise d'oeuvre pour l'extension de l'EHPAD avec la création d'une unité de vie protégée ↗EHPAD Maison de la Forêtshared awardawarded 24 Jun 2025
- Concours de maîtrise d'oeuvre pour l'extension de l'EHPAD avec la création d'une unité de vie protégée ↗EHPAD Maison de la Forêtshared awardawarded 23 Jun 2025
- France – Architectural, construction, engineering and inspection services – Mission de maîtrise d’œuvre portant sur la réalisation de travaux de rénovation énergétique partielle et le réaménagement de bureaux du bâtiment D1 situé sur le site du CEA/Grenoble ↗Commissariat à l'énergie atomique et aux énergies alternatives€1awarded 29 Nov 2024
- France-Le Monêtier-les-Bains: Engineering services ↗mairie du Monêtier les Bainsshared awardawarded 28 Apr 2023
- France-Évaux-les-Bains: Architectural and related services ↗Établissement thermal d'Évaux-les-Bainsshared awardawarded 31 Oct 2019
- Architectural, construction, engineering & inspection services — Semcoda ↗Semcodaawarded 30 May 2014
Possibly the same organisation
These entries differ from this one only by legal form or a bracketed qualifier, so they may be the same organisation — or a different registered company of the same name. They are kept apart on purpose: the figures on each page are per legal entity and are never combined.
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.