Supplier profile
B3 ENTERPRISES LLC
Every public-sector award we hold for this supplier, across the United States, from 7 Apr 2017 to 21 Aug 2026.
Awards won
222
all time
Attributed value
$120.7m
as published
Buyers
10
public bodies
Active
2017–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Office of the Chief Financial Officer | 144 | $5.0m |
| Smithsonian Institution | 42 | $11.0m |
| Public Buildings Service | 10 | $9.1m |
| National Park Service | 8 | $2.5m |
| U.S. Coast Guard | 8 | $10.0m |
| Agricultural Research Service | 4 | $823k |
| Department of Veterans Affairs | 2 | $730k |
| Office of Procurement Operations | 2 | $666k |
| Department of the Army | 1 | $79.0m |
| Department of the Navy | 1 | $1.9m |
What they win
Awards
Showing 1–25 of 222 awards we hold
- Demolish Multiple Buildings, Cape May, Nj. Pn 31602068 ↗U.S. Coast Guard£206kawarded 21 Aug 2026
- Indefinite Delivery Indefinite Quantity (Idiq) For Construction, Design, And/Or Design Build In Projects ↗Office of the Chief Financial Officer£108kawarded 29 Jun 2026
- Demolish Various Daybeacon, Crisfield, Crisfield, Md In Accordance With Paragraph 2(D) Implementing The President's "department Of Government Efficiency" Cost Efficiency Initative Feb 26, 2025. ↗U.S. Coast Guard£253kawarded 2 Jun 2026
- The Purpose Of This Task Order Is To Provide Usda With Facility Alteration Services Within The Sidney R. Yates Federal Building In Washington, Dc. ↗Office of the Chief Financial Officer£295kawarded 3 Feb 2026
- Replace Timber Pier At Sta St Inigoes ↗U.S. Coast Guard£912kawarded 18 Sept 2025
- 1700046188 Ohrm/Fmd48 Room 2w, 4w, 6w, 7w, 9w Patch Plaster And Gypsum Walls, Paint Walls One Coat Primer And Two Finish Coats To Building Standard Bone White Egg Shell. All Trim Will Be Painted Building Standard Bone White Semi-Gloss. Replace And In ↗Office of the Chief Financial Officer£55kawarded 28 Mar 2025
- 1700046164 Ohrm/Fmd48 Room 23w 24w 28w 29w 30w & 32w: Remove Empty Surface Mounted Conduits / Raceways. Repair Gypsum Board And Plaster Walls Cracks And Joints. Paint Walls One Coat Primer And Two Coats Finish With Sherwin Williams: Walls: Bone W ↗Office of the Chief Financial Officer£36kawarded 11 Feb 2025
- 1700044819 Ohrm/Fmd48 Rooms 12w - 15w Patch Plaster Walls, Paint Walls One Coat Primer And Two Finish Coats To Building Standard Bone White Egg Shell. All Trim Will Be Painted Building Standard Bone White Semi-Gloss. Replace And Install New Blinds. R ↗Office of the Chief Financial Officer£25kawarded 11 Feb 2025
- 1700046536 Oo/Mrmd/Mail/Fmd41 The Mail Room B 0400 Is Installing A New Sorting/Scanning Device That Requires Installing New Electrical. Dedicated Breaker 50a-3p 240v To Be Installed In Electrical Room 0058, Dedicated Line #4 Wire Will Be Run Into Mai ↗Office of the Chief Financial Officer£44kawarded 5 Feb 2025
- 1700045486 Fas/Fmd4 Room 5088 Patch & Paint Honey Wind Egg-Shell For Walls And Meadow Lark For Trim Semi-Gloss. Install Walls With Door Separating 5090 From 5092 And 5092 From 5094. The Wall Will Be Built Where IT Is Flush On The 5090 Side Of Th ↗Office of the Chief Financial Officer£67kawarded 19 Dec 2024
- Bonified Fy24 Requirement 1700041797 Ams/Fmd27 Room 2913, 2915, 2917 & 2919: Patch Plaster And Drywall Partitions. Paint Walls One Coat Primer And Two Coat Finish With Sherwin Williams: Walls: Honey-Wind (Eggshell Finish) And Trim: Meadowlark (S ↗Office of the Chief Financial Officer£36kawarded 19 Dec 2024
- 1700045445 Ohsec/Ec/Fmd60 Rooms S310a, S310b, S310c, S310e Patch Plaster And Gypsum Walls, Paint Walls One Coat Primer And Two Finish Coats To Building Standard Honey Wind (Eggshell Finish). All Trim Will Be Painted Building Standard Meadow Lark Semi ↗Office of the Chief Financial Officer£18kawarded 19 Nov 2024
- 1700045586 Osec/Ascr/Fmd25 Remove Existing Blinds And Provide And Install New Building Standard Blinds, Alabaster Color 2 Wide X 0.008 Thick Aluminum Cordless Lift And Wand Tilt. ↗Office of the Chief Financial Officer£3kawarded 8 Nov 2024
- 1700044616 Ohrm/Fmd48 Room 300w, Paint And Patch Walls Bone White (Whitten Building Standard), Trim Semi-Gloss White. Update Existing Electrical Outlets And Light Switch. Remove/Abate All Identified Hazardous Materials (Floors). Replace Carpet Tiles ↗Office of the Chief Financial Officer£20kawarded 31 Oct 2024
- 1700045485 Fas/Fmd4 Partial Renovation Of Rooms: 6092-94 Installation Of 1 Drywall Partition Between 6092/6094, Installation Of Door And Minor Electrical Work. Carpet Will Be Protected. Provide Dust Protection. Patch /Paint Walls And Trim Building ↗Office of the Chief Financial Officer£29kawarded 16 Oct 2024
- 1700041327 Nifa/Fmd32 Removal Of Built-In Wall Cabinetry In Suite 336a: The Contractor Must Demo And Remove The Built-In Wood Cabinets/ Shelving From Suite 336a In The Whitten Building. This Includes The Disconnection Of Any Electrical Lines That Are ↗Office of the Chief Financial Officer£8kawarded 30 Sept 2024
- 1700044826 Ohrm/Fmd48 Fy24 Room 301w Patch Plaster Walls, Paint Walls One Coat Primer And Two Finish Coats To Building Standard Bone White Egg-Shell Finish. All Trim Will Be Painted Building Standard Bone White Semi-Gloss. Replace And Install New Bli ↗Office of the Chief Financial Officer£14kawarded 30 Sept 2024
- 1700041602 Ocio/Fmd7 Rm 422w Paint And Patch Walls Bone White (Whitten Building Standard), And Trim: Semi-Gloss Bone White. Update Existing Electrical Outlets And Light Switch. Remove/Abate All Identified Hazardous Materials (Floors). Replace Carpet ↗Office of the Chief Financial Officer£23kawarded 27 Sept 2024
- Repair Pier 2 At Cg Yard Repair Pier 2 At Cg Yard Curtis Bay Md ↗U.S. Coast Guard£3.2mawarded 27 Sept 2024
- 1700044831 Ohrm/Fmd48 Fy24 Room 302w Patch Plaster Walls, Paint Walls One Coat Primer And Two Finish Coats To Building Standard Bone White Egg-Shell. All Trim Will Be Painted Building Standard Bone White Semi-Gloss. Replace And Install New Blinds. Re ↗Office of the Chief Financial Officer£14kawarded 27 Sept 2024
- 1100000735 Fsis Fmd2 ;using Te Wiring Systems, Install Under Carpet Electrical System(S). Each Quad Electrical Floor Outlet (4) Will Use Power From Two Existing Electrical Receptacles. Two (2) Quad Outlets Will Be Fed From One Existing Receptacle Ea ↗Office of the Chief Financial Officer£27kawarded 25 Sept 2024
- 1700044654 Ogc/Fmd35 Room 2009 Patch And Paint Walls. Remove Carpet And Install New Carpet Tile. This Work Order Includes But Is Not Limited To The Following: Patching And Paint Walls And Trim (Selected From Building Standard) In Rooms 2009. Removin ↗Office of the Chief Financial Officer£5kawarded 24 Sept 2024
- 1700042018 Ocio/Fmd7 Room 405w Remove Carpet, Abate 9x9 Floor Tile And Mastic, Furnish And Install 1/2 Plywood, And Carpet Tile (Gfci). 406w/407w: Remove Existing Partition That Covers The Entry Door 406w. Build Metal Stud Drywall Partition, Install ↗Office of the Chief Financial Officer£25kawarded 24 Sept 2024
- 1700041556 Rd/Fmd3 4107 Patch And Paint Suite With Mushroom Basket And Trim To Remain White. Patch Walls And Cove Base Where Needed, Electrical Cover Plates Where Needed. Remove Existing Window Blinds And Furnish And Install New. Clean All Construct ↗Office of the Chief Financial Officer£8kawarded 23 Sept 2024
- 1700043960 Fsis/Fmd2 Room 3137/3139 Patch And Paint Walls, Update Electrical Outlets And Switches. This Work Order Includes But Is Not Limited To The Following: Patching And Paint Walls And Trim (Selected From Building Standard) In Rooms 3137/3139 Re ↗Office of the Chief Financial Officer£8kawarded 16 Sept 2024
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.