Supplier profile
B3 ENTERPRISES LLC
Every public-sector award we hold for this supplier, across the United States, from 7 Apr 2017 to 21 Aug 2026.
Awards won
222
all time
Attributed value
$120.7m
as published
Buyers
10
public bodies
Active
2017–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Office of the Chief Financial Officer | 144 | $5.0m |
| Smithsonian Institution | 42 | $11.0m |
| Public Buildings Service | 10 | $9.1m |
| National Park Service | 8 | $2.5m |
| U.S. Coast Guard | 8 | $10.0m |
| Agricultural Research Service | 4 | $823k |
| Department of Veterans Affairs | 2 | $730k |
| Office of Procurement Operations | 2 | $666k |
| Department of the Army | 1 | $79.0m |
| Department of the Navy | 1 | $1.9m |
What they win
Awards
Showing 126–150 of 222 awards we hold
- Service, Joc#22504 B, Floor Drain Repair. F18cc10054 ↗Smithsonian Institution£5kawarded 21 Sept 2022
- Wo166389 Ams/Fmd27 Agreement Number 22128140r02 Create Door Opening Between Rooms 2514 & 2522 (Swing Door In 2514) And Rooms 2522 & 2524 (Swing Door In 2522) (See Floor Plan Attached); Install Door Handle & Lock. ↗Office of the Chief Financial Officer£4kawarded 19 Sept 2022
- Wo166624 Fas/Fmd4 Remove Existing Drapes, Blast Curtains And Blinds. Re-Install Blast Curtains And Blinds After Completion Of Work. Repair Gypsum Board, Plaster Cracks And Joints. Furnish And Install New Covers For Electrical Outlets, And Switches. P ↗Office of the Chief Financial Officer£19kawarded 13 Sept 2022
- Nps-Nca Region 1 - Guardrails Repair For George Washington Memorial Parkway. ↗National Park Service£1.2mawarded 13 Sept 2022
- Wo165371 Ams/Fmd27 Agreement Number 22128140r02 Paint & Patch Room 2094 Paint Walls One Coat Primer And Two Coat Finish With Sherwin Williams Honeywind (Eggshell Finish) And Trim Meadowlark (Semi-Gloss Finish). Missing And Or Damaged Electrical ↗Office of the Chief Financial Officerawarded 13 Sept 2022
- Fas/Fmd4 Full Renovation: Remove Existing Suspension Ceiling System And Accessories. Remove Existing Lighting Fixtures, Wires, Raceway And Cables To The Nearest Junction Box. Remove Interior Metal Stud Drywall Partitions And Furred Walls. Chemically ↗Office of the Chief Financial Officer£136kawarded 2 Sept 2022
- Wo159284 Oc/Fmd31 Remove And Dispose Of Existing Carpet. Prep Space For The Removal Of Acm From Floor Surfaces. Clean Existing Marble Baseboard, Replace All Existing Vinyl Cove Base With New Wood Base. Remove Existing Surface Mounted Conduit And Aba ↗Office of the Chief Financial Officer£17kawarded 1 Sept 2022
- Replace Liebert Unit In Room 2115, 1001 - Victor Building. ↗Smithsonian Institution£529kawarded 1 Sept 2022
- Re: Work Order 165406 Oo/Mrmd/Mail/Fmd41: Room 1-L106 Install Dutch Doors For Print Shop ↗Office of the Chief Financial Officer£6kawarded 1 Sept 2022
- Wo166899 Remove Existing Carpet Tile And Install New Metal Guru. Provide Furniture Move And Lift. Remove Existing Cove Base And Install New Black Cove Base. ↗Office of the Chief Financial Officer£5kawarded 31 Aug 2022
- Service Joc#22503, Survey & Repair Steam Traps Various Locations Contract#f18cc10054. ↗Smithsonian Institution£923kawarded 29 Aug 2022
- Provide Labor, Materials, Equipment And Supervision To Remove Rotted Walkway Between Buildings 23 And 24, Block Entrance To Walkways On Buildings 23,24,25,26. And Repair And Paint Porches, Ramps, Stairs, Steps And Railings. ↗Public Buildings Service£360kawarded 29 Aug 2022
- Wo165002 Ams/Fmd27 Build Wall Partion In Room 2419m, Paint, Install Door Stop On Wall, And Install Light Switch. ↗Office of the Chief Financial Officer£6kawarded 26 Aug 2022
- Paint Walls One Coat Primer And Two Coat Finish With Sherwin Williams Honeywind (Eggshell Finish) And Trim Meadowlark (Semi-Gloss Finish). New Carpet Metal Guru Only. Missing And Or Damaged Electrical Needs To Be Replace Per Electrical Code. Remov ↗Office of the Chief Financial Officer£5kawarded 25 Aug 2022
- Wo163361 Ams/Fmd27 Agreement Number 22128140r02 Patch/Paint/Replace Window Blinds For Room 2099. Paint & Patch 2099 22' X 11' Sqft Paint Walls One Coat Primer And Two Coat Finish With Sherwin Williams Honeywind (Eggshell Finish) And Tr ↗Office of the Chief Financial Officer£3kawarded 24 Aug 2022
- Wo166868 Room 6309 Provide Furniture Move/Lift. Remove Existing Carpet Tile, Install New Metal Guru Carpet Tile. Paint Walls One Coat Primer And Two Coat Finish With Sherwin Williams: Walls: Honey-Wind (Eggshell Finish) Trim: Meadowlark (Semi-Gloss ↗Office of the Chief Financial Officer£9kawarded 23 Aug 2022
- Wo 164435 Ocfo/Fmd28 Paint And Resurface Walls In The Entire 3400 Corridor. ↗Office of the Chief Financial Officer£9kawarded 18 Aug 2022
- Wo167262 Ars/Hq/Fmd37 Replace Door Entering Into Room 2-1117 Per The Scope Of Work. Remove Existing Door And Frame. Remove Existing Combination Lock And Associated Hardware And Return To Usda. Provide Electric Mortise Lock With Lever Handles. Provi ↗Office of the Chief Financial Officer£30kawarded 18 Aug 2022
- Major M&r Of Exteriors Of Multiple Buildings At Uscg C5isc Alexandria, VA. ↗U.S. Coast Guard£710kawarded 18 Aug 2022
- Wo 166935 Oc/Fmd31 Remove And Dispose Of Existing Carpet Floor Tile And Adhesive That Contain Asbestos Material. Provide A Certified Industrial Hygienist. Prepare Floor To A Smooth Surface Prep For New Carpet. Furnish And Install New Metal Guru Carpe ↗Office of the Chief Financial Officer£5kawarded 17 Aug 2022
- Modification To Award 12314421f0804 ↗Office of the Chief Financial Officer£10kawarded 16 Aug 2022
- Service: #22704 Nmah - Replace Vacuum Condensate System For The GSA Condensate Return. ↗Smithsonian Institution£442kawarded 16 Aug 2022
- Wo166173 Ams/Fmd27 Agreement Number 22128140r02 Install 6 Recess Lights In Room 2526 And Add Adjust Existing Light Switch. ↗Office of the Chief Financial Officer£6kawarded 16 Aug 2022
- Project No: 22426 Service, Replace Vav At Anacostia Museum. ↗Smithsonian Institution£242kawarded 15 Aug 2022
- Https://Iasprism.edc.usda.gov/Prism.net/App_themes/Prismclassic/Images/Page_requiredstatus.pngmodification - Award 12314422f0113 Req 1055080 Fas/Fmd4 Remove And Dispose Of Existing Carpet. Prepare Floor To A Smooth Surface Prep For New Carpet. Scrap ↗Office of the Chief Financial Officer£9kawarded 4 Aug 2022
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.