Supplier profile
BURNS & MCDONNELL ENGINEERING COMPANY, INC.
Every public-sector award we hold for this supplier, across the UK and the United States, from 12 Jul 2012 to 12 Aug 2026.
Awards won
548
all time
Attributed value
$955.4m
3 shared, unvalued
Buyers
12
public bodies
Active
2012–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Department of the Army | 358 | $722.5m |
| Department of the Navy | 76 | $190.6m |
| Department of Energy | 42 | $8.5m |
| Public Buildings Service | 34 | $4.9m |
| Department of State | 11 | $15.6m |
| Department of the Air Force | 11 | $8.6m |
| Federal Aviation Administration | 5 | $3.1m |
| National Aeronautics and Space Administration | 3 | $1.2m |
| Ofgem | 3 | not attributable |
| Smithsonian Institution | 3 | $275k |
What they win
Awards
Showing 26–50 of 548 awards we hold
- Fort Bragg Lots 5 And 6 Ae Services ↗Department of the Army$542kawarded 10 Nov 2025
- Design For The Repair And New Layout Of Kc-46a Building 429 Aircraft Maintenance Squadron (Amxs) And Designed Aircraft Support Hardware (Dash-21) Storage At March Air Force Reserve Base, Ca ↗Department of the Army$746kawarded 10 Oct 2025
- Jbdml (Ft Dix) Amsa 21 Repair ↗Department of the Army$713kawarded 30 Sept 2025
- Puerto Rico/Virgin Islands Architect-Engineer Matoc (Unrestricted) ↗Department of the Army$3kawarded 29 Sept 2025
- Fy29 B-21 Aircraft Ground Equipment Shop, Dyess Air Force Base, Abilene, Texas, Planning Charrette Reports ↗Department of the Army$399kawarded 27 Sept 2025
- The A-E Is Responsible For Preparation Of Installation Development Plan (Idp) For Erdc Waterways Experiment Station (Wes) Located In Vicksburg, Ms. ↗Department of the Army$425kawarded 27 Sept 2025
- The Government Will Utilize The Deliverables From This Task Order To Develop A Dbb (Site Adapt) Of The Military Working Dog (Mwd) Kennels In San Antonio, Tx Three Kennel Facilities, Providing A Total Of 400 Dog-Runs, And One Kennel Support Facility. ↗Department of the Army$4.9mawarded 27 Sept 2025
- Norfolk Coastal Storm Risk Management Phase 3- Ae Services To Further Develop The Design Maturity From Pre-Engineering Phase To 30% Design With Focus On Refining Alignment And Structural Analysis For Lafayette Outer Surge Barrier. ↗Department of the Army$9.5mawarded 26 Sept 2025
- Work To Be Accomplished Is Design And Construction Oversight Of The Fy28 B-21 Environmental Protection Shelters 1-11, To Meet B-21 Mission Requirements. ↗Department of the Army$4.1mawarded 26 Sept 2025
- A-E Title I, Ii, And Iii Engineering Services - Bristol-Summit 115kv Rebuild Design ↗Department of Energy$850kawarded 24 Sept 2025
- Ae: Pcas For Drainage Improvements Tank Containment B2910 T-1 ↗Department of the Navy$82kawarded 24 Sept 2025
- Enhanced Pcas ↗Department of the Navy$3.6mawarded 23 Sept 2025
- A-E Title I, Ii, And Iii Engineering Services - Quinn Creek Substation & Transmission Line Project Appraisal Services ↗Department of Energy$74kawarded 22 Sept 2025
- A-E Title I, Ii, And Iii Engineering Services - Edgeley - Groton 115-Kv Transmission Line Geotech ↗Department of Energy$251kawarded 22 Sept 2025
- A/E Services In Support Of Replacing An Air Handling Unit In Naval Research Laboratories Building 210. ↗Department of the Army$452kawarded 19 Sept 2025
- A-E Title I, Ii, And Iii Engineering Services - Oregon Mountain Design ↗Department of Energy$210kawarded 19 Sept 2025
- Renovate Barracks 1012/1013 - Title 2 Commissioning Provide Whole Building Commissioning Per Ufc 01-200-02, And Specification 01 91 00. 15 Total Building Commissioning Services In Accordance With Usgbc Guiding Principles Verification Process. ↗Department of the Army$205kawarded 16 Sept 2025
- Iaw Scope Of Architect Engineer Services Dated 26 June 2025. ↗Department of the Army$4.0mawarded 16 Sept 2025
- Full Design Services For Construction Of The Advanced Research Center (Arc) A.k.a. Ammunition, Explosives, Toxics Center (Aec) At Picatinny Arsenal, Nj ↗Department of the Army$3.4mawarded 5 Sept 2025
- Ae - Horizontal Region 01 Idiq - Minimum Guarantee - Burns And Mcdonnell ↗Department of the Army$3kawarded 4 Sept 2025
- For Funding Purposes 3 ↗Department of the Army$202kawarded 28 Aug 2025
- Minnesota National Guard Architectural And Engineering Idiq Satoc In Support Of The 133rd Air Wing. ↗Department of the Army$337kawarded 20 Aug 2025
- Ae Services For The Design Of A Bomb Assembly Facility At Homestead Afb, Fl. ↗Department of the Army$1.1mawarded 19 Aug 2025
- 133rd - Ae - Repair Sq Ops B641 - Qjkl232641. Renovate B641 To Support Current Tenant Functions And Consolidations Of Afe Functions, Correct Functional Inadequacies, Maximize Space Utilization, Bring Up To Current Standards And Codes. ↗Department of the Army$1.4mawarded 14 Aug 2025
- Minimum Guarantee For Multidiscipline Architect-Engineer Services Indefinite Delivery Indefinite Quantity (Idiq) In Support Of Norfolk District Army Ammunition (Ammo) Program For Multiple Locations ↗Department of the Army$5kawarded 13 Aug 2025
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative. Profiles may take up to an hour to reflect newly collected records.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.