Supplier profile
DJ&A, P.C.
Every public-sector award we hold for this supplier, across the United States, from 27 Sept 2017 to 25 Sept 2026.
Awards won
475
all time
Attributed value
$114.7m
as published
Buyers
13
public bodies
Active
2017–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Forest Service | 159 | $28.7m |
| National Park Service | 148 | $35.7m |
| Federal Highway Administration | 114 | $33.5m |
| Bureau of Land Management | 16 | $5.7m |
| Department of the Army | 12 | $1.2m |
| Bureau of Reclamation | 8 | $1.1m |
| U.S. Fish and Wildlife Service | 7 | $1.3m |
| Under Secretary for Farm and Foreign Agricultural Services | 5 | $1.0m |
| DSC CONTRACTING SERVICES DIVISION | 2 | $321k |
| Bureau of Indian Affairs and Bureau of Indian Education | 1 | $46k |
What they win
Awards
Showing 176–200 of 475 awards we hold
- The Primary Task Is The Writing Of A Biological Assessment That Analyzes The Effects Of The Proposed Action On Endangered Species Act Listed Threatened, Endangered, Proposed, And Candidate Species Including Terrestrial, Aquatic, And Botanical For The ↗Forest Service£89kawarded 28 Sept 2023
- Aop Survey And Design Of 3 Stream Crossings On The Ninemile Rd. Stark Creek, Lower Cromwell Creek, Upper Cromwell Creek ↗Forest Service£92kawarded 28 Sept 2023
- Blue Mountain Paving And Parking Area Final Design ↗Forest Service£60kawarded 27 Sept 2023
- Land Survey, Corner Control And Posting Of The Beaverhead-Deerlodge National Forest Boundaries In Support Of The South Tobacco Roots Vegetation Project. ↗Forest Service£80kawarded 27 Sept 2023
- To Procure Professional Land Surveying Services To Survey, Mark And Post National Forest Boundary Line And To Recover And Maintain Public Land Survey Corners In Support Of The South Otter Vegetative Management Project On The Ashland Ranger District. ↗Forest Service£233kawarded 27 Sept 2023
- Ae Services For Project Scoping Trip For The Yuga (248395/248936)-Replace Eagle, Coal Creek & Bettles Water Treatment Systems Projects At Yukon-Charley Rivers National Preserve & Gates Of The Arctic National Park & Preserve, Alaska ↗National Park Service£252kawarded 26 Sept 2023
- Ae Title I Services - Preliminary And Schematic Design Services For Rehabilitate Climbing Facilities At Camp Muir - Pmis Number 307228 - Mount Rainier National Park - Ashford, Wa ↗National Park Service£133kawarded 25 Sept 2023
- Water System Design A/E Service - Glba ↗National Park Service£321kawarded 25 Sept 2023
- Range Monitoring Idiq Task Order 3 ↗Bureau of Land Management£1.0mawarded 22 Sept 2023
- Title I Condition Assessment, Perform An Investigative Study Of The Cause And Location Of Water Intrusion At The Rooms Below The South End Of The Barbette Tier, Fort Point National Historic Site, California. ↗National Park Service£56kawarded 21 Sept 2023
- Architect-Engineer Design Services For South Fork Footbridge In Upper Paradise ↗National Park Service£55kawarded 21 Sept 2023
- Service, Replace Waterline Title Iii Services At Castillo De San Marcos National Monument ↗National Park Serviceawarded 20 Sept 2023
- Gaoa - Construction Scheduling, Phasing, And Bridge Design Associated With Repairs To Existing Trestle Structures On The Route Of The Hiawatha Trail. ↗Forest Service£147kawarded 18 Sept 2023
- Twentymile Leonia, Fsr 408 Mp 16.7 Gabion Basket Fill Failure A & E Task Order Design ↗Forest Service£66kawarded 15 Sept 2023
- The Intent Of This Project Is To Evaluate The Existing System And Redesign To Expand IT Accommodating Proposed Future Personnel Staffing Levels At Slate Creek And Provide Final Ps&e Package For This Design. Wp#663139 ↗Forest Service£40kawarded 15 Sept 2023
- Range Site & Range Condition Surveying Services For The Bureau Of Indian Affairs (Bia), Crow Creek Agency In Fort Thompson, Sd. ↗Bureau of Indian Affairs and Bureau of Indian Education£46kawarded 14 Sept 2023
- Gaoa - West Fork Of Fish Creek Trail Bridge Design (Trail 101 -Mp 3.1) - Lolo Nf. The Objective Of This Project Is To Replace The Existing Bridge With A Structure That Provides Minimum Impact To The Stream And Allows Stock And Hikers To Safely Pass ↗Forest Service£43kawarded 13 Sept 2023
- Gaoa Fy21 Yellowstone Shortline Rr Trail #611 Technical Reviews And Quality Assurance Task Order 628 168 ↗Forest Service£19kawarded 13 Sept 2023
- Title I Condition Assessment Services, Post Knp Fire Rehabilitation Of Clover Creek Wastewater Disposal Fields, Sequoia National Park, California ↗National Park Service£146kawarded 13 Sept 2023
- Little Rock Creek Trail Bridge Design In Accordance With The Pricing And Sow Below. ↗Forest Service£29kawarded 13 Sept 2023
- Wpap 661534 - Timber Road Construction Lidar (Northern Region) ↗Forest Service£177kawarded 12 Sept 2023
- Survey And Design Of Chief Joseph Trailhead In Accordance With The Soi And Sow Below. ↗Forest Service£29kawarded 12 Sept 2023
- Erfo Fsr 1205 Mp 7.4 Site Investigation Ae ↗Forest Service£45kawarded 8 Sept 2023
- Nv Bl Sonv 500(3) Red Rock Trail Phase 2a 30% Design ↗Federal Highway Administration£1.2mawarded 7 Sept 2023
- Topographic Survey For The Restoration Of The Historic Irrigation System, Grant-Kohrs Ranch National Historic Site Park ↗National Park Service£14kawarded 7 Sept 2023
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.