Supplier profile
EA ENGINEERING, SCIENCE, AND TECHNOLOGY, INC., PBC
Every public-sector award we hold for this supplier, across the United States, from 8 Aug 2006 to 22 Jul 2026.
Awards won
603
all time
Attributed value
$1.4bn
as published
Buyers
15
public bodies
Active
2006–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Environmental Protection Agency | 241 | $832.1m |
| Department of the Navy | 135 | $32.3m |
| Department of the Army | 132 | $489.3m |
| National Park Service | 44 | $6.3m |
| Department of the Air Force | 29 | $76.6m |
| Public Buildings Service | 6 | $2.5m |
| Department of Veterans Affairs | 4 | $1.4m |
| National Oceanic and Atmospheric Administration | 3 | $1.1m |
| Federal Bureau of Investigation | 2 | $303k |
| Immediate Office of the Secretary of Transportation | 2 | $157k |
What they win
Awards
Showing 251–275 of 603 awards we hold
- X004 23 Jphc (101 & 110) Ltm/Om Ph 4-6 ↗Department of the Navy£45kawarded 24 Feb 2023
- Conduct Preliminary Assessments ↗Department of the Army£2.0mawarded 16 Feb 2023
- Georgetown North Groundwater Superfund Site, Remedial Action Framework (Raf) Design And Engineering Services (Des) Task Order (To). The Purpose Of This To Is To Complete The Remedial Investigation And Feasibility Study (Ri/Fs) At The Georgetown Nort ↗Environmental Protection Agency£3.4mawarded 14 Feb 2023
- X003 23 Bangor (200, 204) Non-Routine Repairs Ph. 6 ↗Department of the Navy£216kawarded 14 Feb 2023
- 23 Bangor (200, 204) Operations & Maintenance Ph 6 ↗Department of the Navy£513kawarded 7 Feb 2023
- Des R6 Colonial Creosote Superfund Site Remedial Investigation/Feasibility Study (Ri/Fs) And Remedial Design (Rd) Activities ↗Environmental Protection Agency£2.4mawarded 20 Jan 2023
- Pfas Remedial Investigations ↗Department of the Army£9.9mawarded 19 Jan 2023
- Removal Of The Underground Storage Tank And Installation Of The Above Ground Storage Tank ↗Department of the Army£508kawarded 11 Jan 2023
- Technical And Project Support At W. R. Grace Bay. ↗Department of the Army£8.7mawarded 6 Jan 2023
- Obligation Of Guaranteed Minimum ↗Department of the Army£3kawarded 5 Jan 2023
- Rouge River Main Stem (Rrms) Feasibility Study Oversight: This Action Initiates The Rouge River Main Stem (Rrms) Feasibility Study Oversight Support Task Order ↗Environmental Protection Agency£201kawarded 28 Dec 2022
- Ten Mile Drain Base Award ↗Environmental Protection Agency£8.2mawarded 15 Dec 2022
- Munitions And Explosives Of Concern Removal And Closure Of Mrs 16, Artillery Range Southeast, Mrs 19, Artillery Range Northeast, And Mrs 20, Rocket And Rifle Grenade Ranges Former Camp Howze, Cooke County, Texas - Task Order ↗Department of the Army£8.9mawarded 9 Dec 2022
- Raf Des Task Order Title: Region 6 Raf Des Midessa Ground Water Plume Superfund Site For Feasibility Study (Fs), Remedial Design (Rd) And Remedial Action (Ra) Oversight (Raos) Located In Midland County, Southwest To City Of Midland, Texas ↗Environmental Protection Agency£4.8mawarded 10 Nov 2022
- Emeregency Remove Diesel 2 Heating Oil, 1200 Gallons Of Diesel Fuel, And Install A Temporary Code Compliant Above Ground Storage Tank ↗Public Buildings Service£87kawarded 3 Nov 2022
- Task Order Title: Remediation Acquisition Framework (Raf) Design And Engineering Services (Des) For The Northeast 2nd Street Superfund Site. The Purpose Of This Task Order Is To Complete A Remedial Design (Rd) Associated With The North East 2nd S ↗Environmental Protection Agency£1.6mawarded 28 Oct 2022
- Atlantic Wood Industries, Inc. Superfund Site Remedial Acquisition Framework (Raf) Design And Engineering Services (Des) The Purpose Of This Task Order (To) Is To Conduct All Remaining Remedial Design (Rd) Activities, Provide Rd Implementation A ↗Environmental Protection Agency£2.6mawarded 30 Sept 2022
- Rac 3. Sulphur Bank Mercury Mine Remedial Investigation Feasibility Study, New Task Order For Remedial Investigation Activities, Production Of Operable Unit 4 Remedial Investigation Report With An Option For Producing A Remedial Alternative Screening ↗Environmental Protection Agency£863kawarded 30 Sept 2022
- Phase I Remedial Investigation Of Per- And Polyfluoroalkyl Substances (Pfas) At Joint Base Andrews, Maryland ↗Department of the Army£1.5mawarded 30 Sept 2022
- Task Order No. 68he0922f0060 (054) Is For The Remedial Investigation/Feasibility Study Sulphur Bank Mercury Mine Superfund Site Clearlake Oaks, California. ↗Environmental Protection Agency£3.7mawarded 29 Sept 2022
- Crossley Farm Superfund Site Remediation Environmental Services (Res) ↗Environmental Protection Agency£12.5mawarded 27 Sept 2022
- Munitions And Explosives Of Concern Remedial Design Of Southwest Mrs, Multiple/Combined Use Impact Area Range, West Central Mrs, Multiple/Combined Use Impact Area Range, Former Camp Robinson/Camp Pike, Faulkner County, Arkansas ↗Department of the Army£4.7mawarded 25 Sept 2022
- Long Term Monitoring/Land Use Control Management And Optimization ↗Department of the Army£5.0mawarded 25 Sept 2022
- Abc 1-Hour Cleaners Superfund Site Ou3, Remedial Action For Soil ↗Environmental Protection Agency£8.1mawarded 22 Sept 2022
- Award Of Des Task Order Donnelsvile Contaminated Aquifer Superfund Site ↗Environmental Protection Agency£5.5mawarded 21 Sept 2022
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.