Supplier profile
ENSCO INC
Every public-sector award we hold for this supplier, across UK and the United States, from 15 Aug 1999 to 19 Aug 2026.
Awards won
282
all time
Attributed value
$855.1m
as published
Buyers
14
public bodies
Active
1999–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Federal Railroad Administration | 202 | $246.9m |
| Department of the Air Force | 60 | $482.4m |
| Transportation Security Administration | 7 | $9.1m |
| Immediate Office of the Secretary of Transportation | 2 | $38k |
| Washington Headquarters Services | 2 | $17.3m |
| Defense Advanced Research Projects Agency | 1 | $222k |
| Defense Threat Reduction Agency | 1 | $84.0m |
| Department of Energy | 1 | $4.7m |
| Federal Transit Administration | 1 | $2.0m |
| Missile Defense Agency | 1 | $500 |
What they win
Awards
Showing 226–250 of 282 awards we hold
- Igf::ot::igf The Following Are Requirements For This Test: The V/Ti Monitor Shall Employee The Default Measurements Which Include Carbody Vertical Acceleration, Carbody Lateral Acceleration, Truck Lateral Acceleration, And Axle Vertical Impact Acceleration Near Both Wheels Of One Axle. The V/Ti Monitor Shall Detect Exceptions Which Exceed Threshold And Transmit Them Wirelessly To A Remote Server. ↗Federal Railroad Administration£101kawarded 5 Sept 2012
- Igf::ot::igf Operations, Maintenance, Instrumentation And Analysis Support For The Fra Office Of Research Policy And Development. ↗Federal Railroad Administration£104kawarded 23 Aug 2012
- Igf::ot::igf Operations, Maintenance, Instrumentation And Analysis Support For The Fra Office Of Research Policy And Development. ↗Federal Railroad Administration£83kawarded 15 Aug 2012
- Ms3 Enhancements ↗Department of the Air Force£199kawarded 15 Aug 2012
- Igf::ot::igf Operations, Maintenance, Instrumentation And Analysis Support For The Fra Office Of Research Policy And Development. ↗Federal Railroad Administration£438kawarded 15 Aug 2012
- Igf::ot::igf Vibration-Based Onboard Broken Rail Detection ↗Federal Railroad Administration£149kawarded 18 May 2012
- Igf::ot::igf Research And Development - Lidar Upgrade And Automated Extraction Of Grade Parameters ↗Federal Railroad Administration£558kawarded 19 Apr 2012
- Bsa Blue Team Support ↗Defense Threat Reduction Agency£84.0mawarded 12 Dec 2011
- ::other Function:: Inspection Of Joint Bars. ↗Federal Railroad Administration£383kawarded 15 Sept 2011
- ::other Function:: The Purpose Of This New Task Order Under Dtfr53-10-D-00002 Is To Provide Enhancements To The Dotx218, So As To Improve Measurement Systems And Technological Capabilities Of The Dotx218. ↗Federal Railroad Administration£208kawarded 8 Sept 2011
- ::other Function:: Under The Previous Omi&a Contract (Dtfr53-05-D-00205, Task 9), Fra Funded The Development Of A Rail Temperature Prediction Model As Well As An Online Application For Viewing The Model Outputs. The Online Application Needs Improvement To Make IT More Useful To The Railroads. IT Is Also Essential To Do A Study Looking At How Effective The System Is As A Whole With The Available Weather Forecast Data. In This Effort The Server Application Will Be Improved To Generate Automatic Reports And Allow The Users To Access Up To At Least 3 Months Historical Data For Any Selected Grid ↗Federal Railroad Administration£339kawarded 2 Sept 2011
- This Task Order Under Dtfr53-10-D-00002 Is To Determine Whether The Required Intervals Of Track Inspection For Each Class Of Track Should Be Amended; Whether Track Remedial Action Requirements Should Be Amended; Whether Different Track Inspection And Repair Priorities Or Methods Should Be Required; And Whether The Speed At Which Railroad Track Inspection Vehicles Operate And The Scope Of The Territory They Generally Cover Allow For Proper Inspection Of The Track; And Whether Such Speed And Appropriate Scope Should Be Regulated By The Secretary. Period Of Performance: 29 August 2011 Through 28 ↗Federal Railroad Administration£102kawarded 26 Aug 2011
- The Purpose Of This New Task Order Under Dtfr53-10-D-00002 Is For Activities And Repairs Associated With The Derailment Of Dotx218, Which Occurred On June 9, 2011. Period Of Performance: June 9, 2011 To June 8, 2012. ↗Federal Railroad Administration£27kawarded 10 Aug 2011
- ::other Function:: Vehicle Track Interaction Testing, Modeling, And Analyses ↗Federal Railroad Administration£995kawarded 29 Jul 2011
- ::other Function:: Fra Atgms Research And Development. System Design, Fabrication, Installation, Commissing, Data Analysis And Maintenance For An Atgms For Use On Amtrak Corridors. ↗Federal Railroad Administration£806kawarded 12 Jul 2011
- The Purpose Of This Requisition Is To Create A New Task Order "redesigned Portable Track Loading Fixture (Ptlf) Prototype Production And Field Testing" Under Contract Dtfr53-10-D-00002: Operation, Maintenance, Instrumentation, And Analysis Support For Railroad Safety Research. The Period Of Performance Shall Be From June 28, 2011 To November 28, 2012. ↗Federal Railroad Administration£168kawarded 28 Jun 2011
- ::other Function:: The Purpose Of This Requisition Is The Creation Of A New Task (016) Under Dtfr53 10-D-00002: Operation, Maintenance, Instrumentation, And Analysis Support For Railroad Safety Research, For "track Strength And Gage Widening Studies". Period Of Performance: 6/28/2011 To 6/27/2012. ↗Federal Railroad Administration£231kawarded 28 Jun 2011
- ::other Function:: Task Order #001 For The Overall Management And Administration Of The Omia Contract. This Task Order Is Firm-Fixed-Price For A Period Of One-Year. Contract Will Be Allowed Equal Monthly Fixed Payments During The Performance Period. ↗Federal Railroad Administration£3.1mawarded 2 Aug 2010
- ::other Function:: Task Order 2 Hereby Issued For The Overall Storage Of Equipment Under This Omia Contract For The Period Of Performance Specificed Under This Contract. This Task Order Is Firm-Fixed-Price, The Contractor Will Be Given Equal Montly Payments. ↗Federal Railroad Administration£1.4mawarded 2 Aug 2010
- The Purpose Of This Research Effort Is To Evaluate The Current State Of Safety Coatings Used In The U.s. Railroad Industry. ↗Federal Railroad Administration£154kawarded 14 May 2010
- Technical Support For Arra High Speed Rail Initiatives. ↗Federal Railroad Administration£50kawarded 14 Sept 2009
- New Task Order 31 Fra Atgms Second Deployment And Service On The Amtrak North East Corridor (Nec). Deploy And Monitor A Second Atgms Capable Of Providing Real-Time Geometry Exception Information. ↗Federal Railroad Administration£435kawarded 9 Sept 2009
- New Task Order 30-Development Of Improved Handheld Rail Flaw Detection Unit. ↗Federal Railroad Administration£315kawarded 13 Jul 2009
- Security, fire-fighting, police & defence equipment — Scottish Prison Service ↗Scottish Prison Serviceawarded 23 Jan 2009
- Machine Vision Based Track Inspection System ↗Federal Railroad Administration£182kawarded 13 Sept 2008
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.