Supplier profile
ENTECH SE
Every public-sector award we hold for this supplier, across France, from 6 Jan 2020 to 3 Jul 2026.
Awards won
17
all time
Attributed value
€27.6m
14 shared, unvalued
Buyers
14
public bodies
Active
2020–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| SEMBREIZH | 2 | not attributable |
| Sembreizh | 2 | not attributable |
| Ville de Saint Sébastien sur Loire | 2 | not attributable |
| COM D AGGLO REG NAZAIRIENNE ESTUAIRE | 1 | not attributable |
| COMMUNE DE SAINT NAZAIRE | 1 | not attributable |
| GAZ ELECTRICITE DE GRENOBLE | 1 | €27.6m |
| GIP CAMPUS ESPRIT INDUSTRIES | 1 | not attributable |
| GIP Campus Esprit Industries | 1 | not attributable |
| Mairie de Bouguenais | 1 | €75k |
| Morbihan Energies | 1 | not attributable |
What they win
Awards
All 17 awards we hold
- TRAVAUX DE CONSTRUCTION DU NOUVEL EQUIPEMENT SPORTIF DES SAVARIERES ↗Ville de Saint Sébastien sur Loireshared awardawarded 3 Jul 2026
- France – Construction work for sports facilities – TRAVAUX DE CONSTRUCTION DU NOUVEL EQUIPEMENT SPORTIF DES SAVARIERES ↗Ville de Saint Sébastien sur Loireshared awardawarded 25 Jun 2026
- France-Grenoble: Accumulators, primary cells and primary batteries ↗GAZ ELECTRICITE DE GRENOBLE€27.6mawarded 26 May 2023
- France-Saint-Nazaire: Solar panel roof-covering work ↗com d agglo reg nazairienne estuaireshared awardawarded 22 Nov 2022
- 2022061515mv - Accord-cadre relatif à la réalisation de travaux photovoltaïques ou aérovoltaïques ↗COM D AGGLO REG NAZAIRIENNE ESTUAIREshared awardawarded 19 Nov 2022
- Installation d'une centrale photovoltaïque sur la plateforme logistique de Coulvé à Saint-Nazaire ↗COMMUNE DE SAINT NAZAIREshared awardawarded 6 Jan 2022
- France-La Roche-sur-Yon: Construction work ↗SAEML Vendée énergieshared awardawarded 31 Mar 2021
- France-Redon: Industrial machinery ↗GIP Campus Esprit Industriesshared awardawarded 16 Dec 2020
- acquisition de materiel energetique ↗GIP CAMPUS ESPRIT INDUSTRIESshared awardawarded 13 Dec 2020
- France-Vannes: Construction work ↗Morbihan Énergiesshared awardawarded 13 Nov 2020
- Travaux d'installation de centrales photovoltaïques avec fournitures en Morbihan ↗Morbihan Energiesshared awardawarded 12 Nov 2020
- France-Lorient: Construction work ↗Sembreizhshared awardawarded 20 May 2020
- PR15UF5H - OP F15NQ1A CONSTRUCTION D'UN INTERNAT MUTUALISE ET LOGEMENTS DE FONCTION ↗SEMBREIZHshared awardawarded 20 May 2020
- France-Lorient: Construction work ↗Sembreizhshared awardawarded 24 Mar 2020
- PR1515VLP - OP F1971MN - LYCEE PLOERMEL (56) Construction du lycée public de ploërmel ↗SEMBREIZHshared awardawarded 22 Mar 2020
- France-Bouguenais: Solar photovoltaic modules ↗Mairie de Bouguenais€75kawarded 8 Jan 2020
- Réalisation d'une centrale photovoltaïque en autoconsommation en couverture de la salle de la Gagnerie à Bouguenais ↗Ville de Bouguenaisawarded 6 Jan 2020
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.