Supplier profile
ESTES BROS. CONST. INC.
Every public-sector award we hold for this supplier, across the United States, from 27 Jun 2019 to 15 Jul 2026.
Awards won
35
all time
Attributed value
$281.0m
as published
Buyers
3
public bodies
Active
2019–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Federal Highway Administration | 32 | $273.9m |
| National Park Service | 2 | $1.3m |
| 693C73 EASTERN FED LANDS DIVISION | 1 | $5.7m |
What they win
Awards
Showing 1–25 of 35 awards we hold
- Project Tn Erfo Fs Chrke804 2021-1(2): The Project Consists Of Design Services, Slope Stabilization, Roadway Reconstruction, Asphalt Concrete Pavement, And Other Miscellaneous Work. ↗Federal Highway Administration£2.8mawarded 15 Jul 2026
- VA NP BLRI 1K1 - Blue Ridge Parkway ↗693C73 EASTERN FED LANDS DIVISION£5.7mawarded 3 Feb 2026
- Project VA Np Blri 1k1: The Project Consists Of Pavement Rehabilitation From Mp 86 To Mp 89 On The Blue Ridge Parkway. The Work Includes Full Depth Reclamation, Drainage Improvement, Signage, And Other Miscellaneous Work. ↗Federal Highway Administration£6.0mawarded 3 Feb 2026
- Project Nc Np Blri 2m30: The Project Consists Of Hurricane Damage Repairs At Mp 342.7, 343.7 And 343.8. The Work Includes Slide Repairs, Culvert Replacement And Cleaning, Stone Masonry Headwall Installation, Riprap Placement, Curb And Guardrail In ↗Federal Highway Administration£13.2mawarded 25 Nov 2025
- Tn Np Grsm 11(6): The Project Consists Of Repairing Pavement Edge Drop-Offs, Removing Or Paving Gravel Pull-Off Areas And Replacing Timber Guardrail. The Work Includes Shoulder Hardening, Which Consists Of Constructing A 2-Foot Wide Asphalt Paved Sh ↗Federal Highway Administration£3.1mawarded 30 Oct 2025
- Np Natr 3n18, 3h27, Etc - Geotechnical, Pavement Rehabilitation, And Structural Repairs Between Mp 121 And Mp 204 (Phase 2), Project Ms Np Natr 3n18 3h27 Etc, Solicitation Number 693c73-25-B-000003, Located In Attala, Choctaw, Leake, Madison, And Web ↗Federal Highway Administration£32.6mawarded 26 Mar 2025
- Project Tn Erfo Fs 2019-1(2): The Project Consists Of Reconstructing Sink Mountain Launch Road And Constructing A New Parking Area. The Work Includes Clearing And Grubbing, Embankment Construction, Asphalt Pavement, Reinforced Concrete Box Culvert I ↗Federal Highway Administration£3.2mawarded 5 Dec 2024
- Project Ms Np Natr 3p27: The Project Consists Of Milling And Overlay Of Multi-Use Trails, Asphalt Concrete Rehabilitation, Aggregate Surfacing, Minor Trail Profile Adjustments, And Other Miscellaneous Work. ↗Federal Highway Administration£2.9mawarded 21 Nov 2024
- Project Np Blri Pvt Pres Fy24(1): The Project Consists Of Pavement Preservation On The Blue Ridge Parkway Mainline From Milepost 121 To Milepost 143. The Work Includes Placement Of Chip Seal And Fog Seal, Patching, Crack Cleaning And Sealing, Paveme ↗Federal Highway Administration£2.4mawarded 5 Sept 2024
- Project VA Np Blri Bms Fy23(1): The Project Consists Of Performing Preventative Bridge Repairs To 18 Bridges Along The Blue Ridge Parkway. The Work Includes Repointing Stone Masonry Joints, Cleaning And Coating Exposed Rebar, Cleaning And Resealing ↗Federal Highway Administration£794kawarded 21 May 2024
- Project Np Natr 3n17, 3h26, Etc. - The Project Consists Of The Drainage Improvements Of The Natchez Trace Parkway (Natr) From Milepost (Mp) 121 To Mp 204 Including Some Parking Areas. The Work Consists Of Design And Installation Of Designated Inlets ↗Federal Highway Administration£23.1mawarded 20 May 2024
- Project Fl Np Deso 900(1): The Project Consists Of Resurfacing The Visitor Entrance Road And Parking Areas. The Work Includes Milling And Overlay, Full Depth Patch, And Other Miscellaneous Work. ↗Federal Highway Administration£302kawarded 17 Apr 2024
- Great Smoky Mountains Np Rehab Balsam/Heintooga Water Tank Rehab System ↗National Park Service£810kawarded 11 Sept 2023
- Project: Np Np Blri 1l9, 1m22, Etc - The Project Consists Of The Rehabilitation Of Approximately 24 Miles Of The Blue Ridge Parkway (Blri) Between Milepost (Mp) 97 And 121 In Bedford, Botetourt, And Roanoke Counties, Virginia. The Work Consists Of Re ↗Federal Highway Administration£64.3mawarded 6 Sept 2023
- Great Smoky Mountains Np Rehab Balsam/Heintooga Wastewater ↗National Park Service£536kawarded 16 Aug 2023
- Project Al Erfo Fw Bose 2020-1(1): The Project Consists Of The Removal And Reconstruction Of The Boardwalk On Gator Lake Trail And Other Miscellaneous Work. ↗Federal Highway Administration£508kawarded 20 Dec 2022
- Project Tn Erfo Fs 2019-1(4): The Project Consists Of The Repair Of Various Damaged Sites On Round Knob Road (Fs-88), Greystone Spur (Fs-88a), Greene Mountain Road (Fs-98). The Work Includes Roadway Resurfacing, Construction Of Gabion Walls, Replace ↗Federal Highway Administration£1.9mawarded 28 Oct 2022
- Project Nc Np Blri Br 5140-097p: The Project Consists Of Reducing Lake Water Level, Repairing Damage To The Bridge Piers, And Replacing Pre-Compressed Foam-Supported Silicone Material At Abutment Bridge Joints And Asphalt Concrete Wearing Surface ↗Federal Highway Administration£545kawarded 8 Sept 2022
- Project Np-Bisc 10(2): The Project Consists Of Designing And Rehabilitation/Reconstruction Of The Roadway And Parking Areas, Pavement Marking, Development And Implementation Of A Traffic Control Plan, Installation Of Erosion And Sediment Control Mea ↗Federal Highway Administration£3.7mawarded 6 Sept 2022
- Project Np-Foot 8g16, 8h10: The Work Includes Full Depth Reclamation Of Foothills Parkway Sections 8g And 8h Mainline, Parking Areas, And Pull-Offs; Establishing Roadside Ditches And Reconditioning Paved Waterways; Replacing Signs And Pavement Marki ↗Federal Highway Administration£28.6mawarded 26 Jan 2022
- Project Ms Erfo Nps Vick 2020-1(1). The Project Consist Of Reconstructing Roads To Restore To Pre-Disaster Condition. The Work Includes Slide Repairs And Bridge Repairs. The Work Items Will Include Erosion And Sediment Control, Temporary Diversion B ↗Federal Highway Administration£2.1mawarded 4 Jan 2022
- Project Np Natr 3q9, 3p26, 3o23 - Traffic Control For Subsurface Investigation (Pavement Cores And Roadway Borings) ↗Federal Highway Administration£51kawarded 16 Sept 2021
- Project Tn Erfo Fs 2019-1(5) The Project Consists Of Repair Of Various Damaged Sites On Meadow Creek Road, Lower Paint Creek Road, And Watauga Point Road. The Work Includes Construction Of Rock Filled Gabion And Rockery Walls, Aggregate Roadway Res ↗Federal Highway Administration£414kawarded 1 Sept 2021
- Project Np-Chch 500(1), 501(1), Etc. The Project Consists Of The Rehabilitation Of Approximately 2.00 Miles Of Glenn-Kelly Road, 0.82 Miles Of Battleline Road, And 0.33 Miles Of Poe Road, Including Parking Areas And Pull-Offs, All Within The Chickam ↗Federal Highway Administration£4.1mawarded 26 Aug 2021
- Project Nc Erfo Coe 2019-1(1) The Project Consists Of The Construction Of Steel H-Pile Retaining Wall Behind Existing Tier 1 Timber Retaining Wall, Removal Of Tier 2 Timber Retaining Wall Reconstruction Of Portion Of Parking Lot Within Berry Mountai ↗Federal Highway Administration£844kawarded 20 Aug 2021
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.