Supplier profile
FRIEDRICH VORWERK SE & Co. KG
Every public-sector award we hold for this supplier, across Germany, from 31 Jan 2022 to 22 Sept 2026.
Awards won
33
all time
Attributed value
€15.0m
20 shared, unvalued
Buyers
9
public bodies
Active
2022–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Hamburger Energienetze GmbH | 8 | not attributable |
| ONTRAS Gastransport GmbH | 8 | not attributable |
| Hamburger Wasserwerke GmbH, Vergabemanagement | 5 | not attributable |
| Hamburger Energiewerke GmbH | 3 | not attributable |
| Berliner Wasserbetriebe | 2 | €12.8m |
| Hamburger Stadtentwässerung AöR | 2 | not attributable |
| Stromnetz Hamburg GmbH | 2 | not attributable |
| Stromnetz Hamburg GmbH - Einkauf | 2 | not attributable |
| Stadtreinigung Hamburg AöR | 1 | €2.2m |
What they win
Awards
Showing 1–25 of 33 awards we hold
- Germany – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Tief- und Rohrbauleistungen für den Bau der FGL 201.33 und 203.09 ↗ONTRAS Gastransport GmbHawarded 22 Sept 2026
- Tief- und Rohrbauleistungen für den Bau der FGL 201.33 und 203.09 ↗ONTRAS Gastransport GmbHawarded 21 Sept 2026
- Germany – General construction work for pipelines – Rahmenvertrag für Rohrlegungs- und Unterhaltungsmaßnahmen im Rohrnetz der Hamburger Wasserwerke GmbH (HWW) für den Zeitraum 01.07.2026 - 30.06.2028 ↗Hamburger Wasserwerke GmbH, Vergabemanagementshared awardawarded 14 Jul 2026
- Ellernweg ↗Hamburger Energienetze GmbHshared awardawarded 23 Mar 2026
- Germany – Gas supply mains construction work – Leitungsbauarbeiten für das Hamburger-Wasserstoff-Industrienetz (HH-WIN) - Abschnitt D.1 Los 3.1, Los 4.1, Los 7 sowie Abschnitt E.1 Los 3 und Los 4 ↗Hamburger Energienetze GmbHshared awardawarded 11 Mar 2026
- Germany – Construction work – Generalunternehmerleistungen zum Ersatzneubau der GDRMA Groß Köris I ↗ONTRAS Gastransport GmbHawarded 27 Feb 2026
- Generalunternehmerleistungen zum Ersatzneubau der GDRMA Groß Köris I ↗ONTRAS Gastransport GmbHawarded 27 Feb 2026
- Borstelbeker Hauptdeich ↗Hamburger Energienetze GmbHawarded 11 Dec 2025
- Germany – Gas supply mains construction work – Leitungsbauarbeiten für das Hamburger-Wasserstoff-Industrienetz (HH-WIN) - Abschnitt C Los 3, 4 und 5 ↗Hamburger Energienetze GmbHawarded 26 Nov 2025
- Germany – Works for complete or part construction and civil engineering work – EPC-Vertrag über Planungs- und Realisierungsleistungen für das Projekt Neubau einer Wasserstoff Gasdruckregel- und Messanlage (GDRMA H2) am Standort Bobbau ↗ONTRAS Gastransport GmbHawarded 28 Aug 2025
- EPC-Vertrag über Planungs- und Realisierungsleistungen für das Projekt Neubau einer Wasserstoff Gasdruckregel- und Messanlage (GDRMA H2) am Standort Bobbau ↗ONTRAS Gastransport GmbHawarded 27 Aug 2025
- Waltershofer Str., A26 ↗Hamburger Energienetze GmbHshared awardawarded 19 Aug 2025
- Germany – Gas supply mains construction work – Leitungsbauarbeiten für das Hamburger-Wasserstoff-Industrienetz (HH-WIN) - Abschnitt A.1A Los 2 und 3, Abschnitt B Los 3, Abschnitt C Los 2 und 8 ↗Hamburger Energienetze GmbHshared awardawarded 7 Aug 2025
- Germany – District-heating mains construction work – BV Spange Haferweg-Grindel Los 4 ↗Hamburger Energiewerke GmbHawarded 24 Jul 2025
- BV Spange Haferweg-Grindel Los 4 ↗Hamburger Energiewerke GmbHawarded 23 Jul 2025
- Germany – General construction work for pipelines – 19/Brbg-0226 Schenkendorfer Weg / Bereich Teltow ↗Berliner Wasserbetriebe€6.4mawarded 19 Jun 2025
- Teil 1: IE32010342 ↗Berliner Wasserbetriebe€6.4mawarded 18 Jun 2025
- FGL 102 ↗ONTRAS Gastransport GmbHshared awardawarded 6 Jun 2025
- Germany – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Tief- und Rohrbauleistungen für den Bau der Gashochdruckleitungen FGL 102 und FGL 211 ↗ONTRAS Gastransport GmbHshared awardawarded 28 May 2025
- Vollhöfner Weiden, Finkenwerder Str. ↗Hamburger Energienetze GmbHshared awardawarded 15 Apr 2025
- Germany – Sewer construction work – Kleinvertrag Sielbauarbeiten (KSV) 2025- 2027, (P-24/501) ↗Hamburger Stadtentwässerung AöRshared awardawarded 27 Mar 2025
- Kleinvertrag Sielbauarbeiten (KSV) 2025- 2027, (P-24/501) ↗Hamburger Stadtentwässerung AöRshared awardawarded 27 Mar 2025
- Germany – Gas supply mains construction work – Leitungsbauarbeiten für das Hamburger-Wasserstoff-Industrienetz (HH-WIN) - Abschnitt A.1 Los 1, Abschnitt A.1A Los 3, Abschnitt B Los 2, Abschnitt D.1 Los 2 ↗Hamburger Energienetze GmbHshared awardawarded 5 Mar 2025
- Gemeinsamer Rahmenvertrag für Tiefbauprojekte bei Kooperationen ↗Stromnetz Hamburg GmbH - Einkaufshared awardawarded 7 Aug 2024
- Germany – Underground work other than tunnels, shafts and subways – Gemeinsamer Rahmenvertrag für Tiefbauprojekte bei Kooperationen ↗Stromnetz Hamburg GmbHshared awardawarded 2 Aug 2024
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.