Supplier profile
HARBOR SERVICES, INC
Every public-sector award we hold for this supplier, across the United States, from 13 May 2016 to 16 Jun 2026.
Awards won
87
all time
Attributed value
$104.5m
as published
Buyers
4
public bodies
Active
2016–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Department of the Air Force | 44 | $5.0m |
| Department of Veterans Affairs | 41 | $98.6m |
| Department of State | 1 | $938k |
| Department of the Army | 1 | $3k |
What they win
Awards
Showing 1–25 of 87 awards we hold
- Project 534-24-902 Temporary Compounding Area ↗Department of Veterans Affairs£260kawarded 16 Jun 2026
- REPAIR ROOF ↗Department of Veterans Affairs£5.6mawarded 16 Jun 2026
- To Complete The Renovation Construction Project At The Columbia VA Medical Center For The Ehrm Training And Admin Space In Building B3. The Period Of Performance Is 300 Calendar Days At The Notice To Proceed (Ntp). ↗Department of Veterans Affairs£2.3mawarded 27 May 2026
- Avon Park Building 28 Replace Fire Pumps. Complete All Work Iaw With Applicable Sow Dated April 28, 2026. The Contractor Shall Furnish All Labor, Supervision, Equipment And Materials To Accomplish The Requirement. ↗Department of the Air Force£83kawarded 18 May 2026
- The Purpose Of The Task Order Is To: 1 Demolish The Existing Wash Rack Support Office, B760 Complete All Work Iaw Applicable Sow Dated 30 March 2026 ↗Department of the Air Force£70kawarded 7 May 2026
- The Purpose Of This Task Order Is To: 1. Demolish Hunt Hq Cabin At B600 Avon Park Complete All Work Iaw Applicable Sow Dated 06 April 2026 ↗Department of the Air Force£92kawarded 7 May 2026
- Building 932 - Minor Interior Renovation ↗Department of the Air Force£17kawarded 4 May 2026
- Moody Building 550/553 Dorm Lighting Upgrade ↗Department of the Air Force£241kawarded 1 May 2026
- The Purpose Of This To Is To: A. Add Approximately 150 Feet Of Conduit, New Switch Locations Are Farther From Panel. B. Add Cabling As Required For Power Connections. Contractor Shall Complete Requirement Iaw Applicable Sow Dated 30 January 2026. ↗Department of the Air Force£12kawarded 24 Feb 2026
- Renovate Bldg 15 2nd Floor ↗Department of Veterans Affairs£2.9mawarded 29 Oct 2025
- The Purpose Of This Task Order Is To: Furnish And Install New Safety Switch For Bead Breaker. Furnish And Install New Safety Switch For Wheel Washer. All Work Should Be Accomplished Iaw Sow Dated 25 September 2025 At Moody Afb. ↗Department of the Air Force£26kawarded 30 Sept 2025
- Charleston Regional Center Building D Scanning Facility Renovation ↗Department of State£938kawarded 30 Sept 2025
- The Purpose Of This Task Order Is To: 1. Replace The Existing Drain System 2. Strip And Repaint Pool And Locker Room Floors All Work Should Be Accomplished Iaw Sow At Moody Afb. ↗Department of the Air Force£52kawarded 30 Sept 2025
- Install Wallpaper In B105 ↗Department of the Air Force£29kawarded 29 Sept 2025
- Repair Roof Leaks And Damage, Storm Helene, Building 657 ↗Department of the Air Force£230kawarded 25 Sept 2025
- Sdvosb Db/Dbb Idc Minimum Guarantee $3,000 Will Be Deobligated Upon Award Of The First Task Order. ↗Department of the Army£3kawarded 19 Sept 2025
- The Purpose Of This Task Order Is To: 1. Demo Pavilions One, Two And Three. 2. Replace Pavilion One 3. Install A Quazite Underground Enclosure At Each Pavilion Site For Electrical Cables. ↗Department of the Air Force£80kawarded 15 Sept 2025
- The Purpose Of This Task Order Is To: 1. Replace The Siding And Trim At B20-23 And B20510 All Work Should Be Accomplished At Grassy Pond Iaw Sow Dated 6 August 2025. ↗Department of the Air Force£157kawarded 2 Sept 2025
- The Purpose Of This Task Order Is To: 1. Replace Stairs And Boardwalk At Grassy Ponds All Work Should Be Accomplished At Grassy Pond Iaw Sow Dated 7 August 2025 ↗Department of the Air Force£29kawarded 2 Sept 2025
- The Purpose Of This Task Order Is To: 1. Replace Roofing, Siding, Trim And Doors At Grassy Pond Roundhouse B20507 All Work Should Be Accomplished At Grassy Pond Iaw Sow Dated 6 August 2025 ↗Department of the Air Force£38kawarded 2 Sept 2025
- The Purpose Of This Task Order Is To: 1. Remove And Replace B721 Dx HVAC Unit All Work Should Be Accomplished At Moody Afb Iaw Sow 12 June 2025 ↗Department of the Air Force£243kawarded 21 Aug 2025
- Demo (14), Construct (9) Picnic Shelters, Grassy Pond. The Requirement Shall Be Completed Iaw Sow Dated 22 May 25. Contractor Shall Furnish All Labor, Supervision, Equipment, Material To Accomplish The Requirement Qseu 25-0112, 0119-0125, 0131-0134 ↗Department of the Air Force£400kawarded 12 Aug 2025
- The Purpose Of This Task Order Is To: 1. Replace Chiller And Pipe At B105. All Work Should Be Accomplished At Moody Afb Iaw Sow Dated June 7, 2025. ↗Department of the Air Force£329kawarded 7 Jul 2025
- Mag Doors And Security ↗Department of Veterans Affairs£408kawarded 15 Apr 2025
- The Purpose Of This Task Order Is To: 1. Demo Existing Concrete Pad2. Prep And Pour New Concrete Pad 3. Construct New Picnic Shelter4. Install New Picnic Grill 5. Replace Turfall Work Should Be Accomplished At Moody Afb Iaw Sows Dated 07 March 25. ↗Department of the Air Force£97kawarded 31 Mar 2025
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.