Supplier profile
JACOBS GOVERNMENT SERVICES COMPANY
Every public-sector award we hold for this supplier, across the United States, from 31 Mar 2015 to 24 Sept 2026.
Awards won
564
all time
Attributed value
$898.2m
as published
Buyers
10
public bodies
Active
2015–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Department of the Army | 242 | $463.0m |
| Department of the Navy | 164 | $189.2m |
| National Park Service | 55 | $76.5m |
| Department of the Air Force | 44 | $55.6m |
| Department of State | 29 | $53.2m |
| Federal Bureau of Investigation | 22 | $49.3m |
| Centers for Disease Control and Prevention | 5 | $7.5m |
| DSC CONTRACTING SERVICES DIVISION | 1 | $3.8m |
| Defense Threat Reduction Agency | 1 | $24k |
| U.S. Coast Guard | 1 | $5k |
What they win
Awards
Showing 1–25 of 564 awards we hold
- C--Nationwide General Architect/Engineering (A/E) Pro ↗DSC CONTRACTING SERVICES DIVISION$3.8mawarded 24 Sept 2026
- Qt On-Site Architectural Project Integrator ↗Federal Bureau of Investigation$467kawarded 3 Aug 2026
- Multiple-Award Indefinite Delivery/Indefinite Quantity (Idiq) Task Order Contract (Matoc) For Professional Architect-Engineering (A/E) Services That Will Cover The Entire United States And Its Territories ↗U.S. Coast Guard$5kawarded 6 Jul 2026
- Title Iii Services - Grant Wastewater Treatment Plant And Collections And Canyon Collections ↗National Park Service$2.0mawarded 25 Jun 2026
- To Provide A United Kingdom Riba 3-Complaint US Air Force-Defined 35% Design And Association For The Advancement Of Cost Engineering (Aace) International Rp 56r-08-Defined Class 3 Cost Estimate In Support Of Sof Hangar/Amu, Raf Mildenhall, Uk. ↗Department of the Air Force$3.4mawarded 21 May 2026
- Cx Task Order 6, Til Comparison With Facility Guidelines Institute Healthcare Design Standards, For The Dva John Cochran Medical Center Health Care System, Usace Contract W912dq21d4000. ↗Department of the Army$555kawarded 20 May 2026
- Yell 326108 - Mammoth Wwtp Headworks Tit ↗National Park Service$275kawarded 15 May 2026
- Yell 326133 - Canyon Wwtp Title Iii ↗National Park Service$2.1mawarded 14 May 2026
- Professional Services For The Design Of Phase 1 - Decentralization Heating Infrastructure Update On The Agency Central Campus On Fort Meade, Md. ↗Department of the Army$6.7mawarded 16 Apr 2026
- Fy 26 Hunters Point Naval Shipyard Parcel B Building Demolition - Base Realignment And Closure (Brac) ↗Department of the Navy$1.1mawarded 14 Apr 2026
- Investigate Shore Power Boom (Spb) Failure At Refit Wharf At Nsb Kings Bay, Ga ↗Department of the Navy$167kawarded 10 Apr 2026
- Preparation Of Design Documents For Cy27 Rokfc In-Kind Project, A25r700, Pol Pipeline, Camp Humphreys, Korea ↗Department of the Army$3.4mawarded 9 Apr 2026
- Ve Study Workshop For Storage And Power ↗Department of the Army$291kawarded 6 Apr 2026
- T7 Flight Simulator Renovation B268, Columbus Afb, Ms ↗Department of the Army$834kawarded 3 Apr 2026
- Seawall Assessment And Restoration At The United States Merchant Marine Academy (Usmma) ↗Department of the Army$1.4mawarded 17 Mar 2026
- A-E Code And Criteria Review - Main Gate ↗Department of the Army$18kawarded 11 Mar 2026
- Unaccompanied Housing (Uh) Repair, B26 At Naval Base San Diego, Balboa Hospital, San Diego, California ↗Department of the Navy$582kawarded 5 Mar 2026
- A-E Idiq For Facilities Planning & Real Estate Advisory Services ↗Centers for Disease Control and Prevention$255kawarded 4 Mar 2026
- Minimum Guarantee For N69450-26-D-0013 ↗Department of the Navy$1kawarded 24 Feb 2026
- The Purpose Of The Project Is To Modernize The Power Plant Within The Facility. The Existing Generator-Set Engines And Other Critical Equipment In The Plant Have Exceeded Lifecycle Expectations And Require Replacement. ↗Department of the Army$5.6mawarded 20 Feb 2026
- Preliminary Design Authority (Pda) Including Cost And Schedule Risk Analysis (Csra) For P1306 And P1307 Bachelor Enlisted Quarters (Beqs) At Marine Corps Air Ground Combat Center (Mcagcc) Twenty-Nine Palms, Ca ↗Department of the Navy$2.2mawarded 17 Feb 2026
- The U.s. Army Corp Of Engineers, Kansas City District Requires Commissioning Services To Support The Pre-Award Phase In Relation To The Idac Of The Expanded John Cochran (Jc) Facility Located In Saint Louis ↗Department of the Army$87kawarded 30 Jan 2026
- Conduct On Site Planning Charette And Design Associated With Construction Of A Wastewater Treatment Plant For Processing Non-Potable Water Storage And Distribution System. ↗Department of the Army$2.6mawarded 30 Jan 2026
- Design-Bid-Build Effort For The Sentinel Operations Group Facility, With Admin, Supply, And Equipment Areas. Utilizes Icd 705 And Cybersecurity. Supporting Work: Utilities, Site Improvements, Pavement, Communications Infrastructure, Backup Generator. ↗Department of the Army$10.8mawarded 28 Jan 2026
- This Task Order Requires Engineering Services To Perform Field Investigations, Document And Assess The General Condition Of The Structural , Electrical, And Mechanical Components Comprising The Waterfront Facilities At Cuba And Djibouti. ↗Department of the Navy$372kawarded 27 Jan 2026
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative. Profiles may take up to an hour to reflect newly collected records.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.