Supplier profile
KBR SERVICES, LLC
Every public-sector award we hold for this supplier, across the United States, from 5 Nov 2002 to 25 Sept 2026.
Awards won
590
all time
Attributed value
$22.0bn
as published
Buyers
9
public bodies
Active
2002–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Department of the Navy | 377 | $1.6bn |
| Defense Logistics Agency | 90 | $105.1m |
| Department of the Army | 79 | $18.9bn |
| Department of the Air Force | 35 | $1.0bn |
| U.S. Customs and Border Protection | 3 | $45.4m |
| Defense Contract Management Agency | 2 | $227.8m |
| National Science Foundation | 2 | $5.0m |
| Department of State | 1 | $42.6m |
| W6QK ACC-RI | 1 | $20.2m |
What they win
Awards
Showing 26–50 of 590 awards we hold
- Engineering Support Services (Ess) At Prince Sultan Air Base (Psab), Kingdom Of Saudi Arabia ↗Department of the Air Force£2.7mawarded 12 Jan 2026
- Provide Porta John Services Using Nsa Bosc Bridge Non-Recurring: J717ac Porta Johns = $66.95/Day X 3 Qtyj717a Hand Wash = $29.73/Day Notice To Proceed Was Issued 17 December 2025 While Waiting For Funding. ↗Department of the Navy£84kawarded 6 Jan 2026
- Provide Porta John Services Using Nsa Bosc Bridge Non-Recurring: J717ac Porta Johns = $66.95/Day X 2 Qtyj717a Hand Wash = $29.73/Day J714aa Dumpster = $286/Dayj714ab Dumpster Pick-Up = $286/Pick-Up * 4 Qty (Per Month) Total Cost = $14,632.90/Month ↗Department of the Navy£73kawarded 30 Dec 2025
- Automated Fuel Handling Equipment ↗Defense Logistics Agency£17kawarded 22 Dec 2025
- Navy Production Usns Button, Usns Dahl And Reset Ii ↗Department of the Navy£4.6mawarded 12 Dec 2025
- Replace Chillers At Bldg. 262 ↗Department of the Navy£945kawarded 10 Dec 2025
- Nsa Bahrain - Blanket Task Order (Bto) ↗Department of the Navy£600kawarded 10 Dec 2025
- Bosc Tractor Trailer Support For Nsa Bahrain And Isa Ab Environmental Requirements. The Elins Described On This Task Order Are Referenced In The Pre-Priced Elin Schedule Under The Nsa Bosc Oy8 Bridge Contract. ↗Department of the Navy£30kawarded 10 Dec 2025
- Nsa Bosc Funding Task Order For Option 8 ↗Department of the Navy£23.0mawarded 29 Nov 2025
- 8511716999!afhe Charleston Mr 22.18.121 ↗Defense Logistics Agency£20kawarded 24 Oct 2025
- Ro Plant Scada Systems Per Ufc 4-010-06. Phase 1: Nsa I Bldg 217, Windows 11, New Workstations, Rockwell Software. Phase 2: Nsa-2, Scada For Pumps/Plcs, Fiber Connection. Ensure Compliance, Sustainment, And Connectivity, Under Acqr# 6129523. ↗Department of the Navy£236kawarded 28 Sept 2025
- The Purpose Of This Project Is To Enhance The Security Posture Of The Facilities While Addressing Drainage Issues And Improving The Structural Integrity Of The Perimeter Barrier System. ↗Department of the Navy£365kawarded 26 Sept 2025
- Replace Feeder Cable 11 Pp2. The Objective Is To Upgrade And Restore The Electrical Distribution Infrastructure To Ensure A Reliable, Safe, And Efficient Power Supply To Critical Facilities, Minimizing Downtime And Operational Risks. ↗Department of the Navy£1.5mawarded 26 Sept 2025
- Cldj-602 Relocate Clu Backup Generator Pp2. The Project Intent Is To Relocate And Reinstall The Backup Diesel Generator And Associated Auxiliary Equipment That Services The Clus (A-D Block) To Create Space For The P332/P334 Construction Project. ↗Department of the Navy£440kawarded 26 Sept 2025
- The Project Includes Replacing Faulty Cables Connecting Pp2a And Pp3 Connection And Faulty Cables Connecting Pp2 And Pp2a. ↗Department of the Navy£2.1mawarded 26 Sept 2025
- To Establish A Reliable, Code Compliant Shore Power Connection From The Existing Electrical Panel Pnl Cdp Uso 380 220 3p 4w, Located Approximately 100 Feet From The Connex Container, A 24,000 Btu Air Conditioning Unit, Lighting Fixtures. ↗Department of the Navy£17kawarded 25 Sept 2025
- Change Of Occupancy Service At The Admiral Villa In Accordance To The Sow. The Usg Approves The Contractors Approach In Their Narrative And Proposal Dated 25 Sep. 2025. ↗Department of the Navy£37kawarded 25 Sept 2025
- The Intent Of This Project Is To Remove And Install New Exterior Electrical Safety Device/Breaker Panels That Are Rain Resistant And Rated For Outdoor Use That Can Withstand Extreme Sun Conditions For Ground Level HVAC Units. ↗Department of the Navy£289kawarded 25 Sept 2025
- Conduct A Comprehensive Assessment And Diagnostic Evaluation Of Switchgears Located In Prime Power Ii (Pp2) And Prime Power Iii (Pp3) By The Original Equipment Manufacturer (Oem) Or Authorized Representative ↗Department of the Navy£2.7mawarded 24 Sept 2025
- Conduct Comprehensive Site Assessment And Diagnostic Evaluation Of Sel Relays Located In Pp2a And Pp3 By The Original Equipment Manufacturer (Oem) Or Authorized Representative. ↗Department of the Navy£1.6mawarded 24 Sept 2025
- The Project Involves The Replacement Of Granular Activated Carbon (Gac) And Multi-Media Filter (Mmf) Media For Four Filtration Trains (Train 1, 2, 3, And 4). ↗Department of the Navy£220kawarded 24 Sept 2025
- To Upgrade The Electrical Infrastructure In Building 130, Room 105 At Camp Lemonnier, Djibouti, In Order To Meet The Specific Power And Safety Requirements For A New Fixed X-Ray Unit. ↗Department of the Navy£28kawarded 22 Sept 2025
- The Intent Of This Project Is To Modify Existing Fire Sprinkler System And Fire Alarm System To Protect The Area Under The Storage Mezzanine As Required By Ufc 3-600-01. ↗Department of the Navy£527kawarded 18 Sept 2025
- Replace Faulty Ups Batteries; B760; Nsa Ii; Eod ↗Department of the Navy£10kawarded 17 Sept 2025
- Automated Fuel Handling Equipment Site Support - Pearl Harbor Ugph ↗Defense Logistics Agency£868kawarded 16 Sept 2025
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.