Supplier profile
KOVILIC CONSTRUCTION CO INC
Every public-sector award we hold for this supplier, across the United States, from 3 May 2019 to 30 Sept 2026.
Awards won
37
all time
Attributed value
$106.4m
as published
Buyers
7
public bodies
Active
2019–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Federal Highway Administration | 18 | $51.5m |
| Department of the Army | 9 | $12.7m |
| U.S. Fish and Wildlife Service | 5 | $6.6m |
| 693C73 EASTERN FED LANDS DIVISION | 2 | $21.3m |
| Forest Service | 1 | $2.8m |
| National Park Service | 1 | $11.1m |
| W7NN USPFO ACTIVITY NHANG 157 | 1 | $487k |
What they win
Awards
Showing 26–37 of 37 awards we hold
- Multi-Bridge Repair At Seney Nwr ↗U.S. Fish and Wildlife Service£3.4mawarded 28 Sept 2021
- Jpp Greenway Multi-Use Paved Trail ↗Department of the Army£1.6mawarded 17 Sept 2021
- Mo-Neosho Nfh-Drain Ditch Rehab ↗U.S. Fish and Wildlife Service£861kawarded 13 Sept 2021
- Project VA St Tfhrc 50(6): The Project Consists Of The Construction Of Approximately 830 Feet New Concrete Sidewalk (4-Foot Wide) With Concrete Curb (16-Inch Depth), High-Quality Detectable Warning Tiles Or Panels That Comply With The Standards Of T ↗Federal Highway Administration£235kawarded 9 Sept 2021
- Project Np-Guis 15(3) The Project Consists Of The Reconstruction Of Park Road And The Construction Of Paved Shoulders. The Work Includes Reconstruction Of The One Lane Entrance Portion Of Park Road, Construction Of Paved Shoulders, Guardrail Replace ↗Federal Highway Administration£4.7mawarded 9 Aug 2021
- Project VA Erfo Coe 2018-1(1) The Project Consists Of Parking Lot Repairs. The Work Includes Riprap Installation, Embankment Construction, Aggregate Base, Separation-Stabilization Geotextile, Asphalt Concrete Pavement, Wheelstop Resetting, Pavement ↗Federal Highway Administration£233kawarded 10 May 2021
- Loyall Construction//Loyall Phase 1 ↗Department of the Army£1.4mawarded 11 Mar 2021
- Base Fy20 Vermillion East Pier Repair ↗Department of the Army£2.2mawarded 30 Sept 2020
- Water Main In Trench, Ductile Iron 12" ↗Department of the Army£1.9mawarded 30 Sept 2020
- Ne Ftfw Ftni Trail(1) Fort Falls Trail ↗Federal Highway Administration£240kawarded 9 Sept 2020
- Project: Felsenthal Wildlife National Refuge Project Fw Fels-11(1) The Project Consists Of The Resurfacing Pine Island Road And Sandy Prairie Road Within The Felsenthal National Wildlife Refuge. The Work Includes Resurfacing With Aggregate Surfac ↗Federal Highway Administration£1.7mawarded 6 Sept 2019
- Mammoth Cave National Park - Np-Maca 13(1), 14(2) - The Project Consists Of The Reconstruction Of The Green River Ferry Road Ramps Near Mp 1.31 And Shoulder Hardening On Mammoth Cave Parkway. The Work Includes The Removal And Reconstruction Of A Portion Of The Existing Roadway Approaches To The Ferry Crossing, Extending The Ramps Further Into The River, Protecting Historic Stone Walls Adjacent To The Ramps, Drainage Improvements, Scour Protection, Shoulder Hardening, And Other Miscellaneous Work. ↗Federal Highway Administration£2.3mawarded 3 May 2019
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.