Supplier profile
MERRICK & COMPANY
Every public-sector award we hold for this supplier, across the UK and the United States, from 4 Mar 2013 to 7 Aug 2026.
Awards won
150
all time
Attributed value
£27.0m + $235.7m
1 shared, unvalued
Buyers
14
public bodies
Active
2013–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| DEFRA | 2 | £25.3m |
| Defra Network eTendering Portal | 4 | £1.7m |
| Department of the Air Force | 41 | $14.4m |
| Animal and Plant Health Inspection Service | 35 | $37.2m |
| Department of the Army | 30 | $66.9m |
| Agricultural Research Service | 17 | $78.2m |
| National Aeronautics and Space Administration | 8 | $7.8m |
| Defense Threat Reduction Agency | 3 | $3.3m |
| Office of the Chief Financial Officer | 3 | $40k |
| Office of Procurement Operations | 2 | $27.7m |
What they win
Awards
Showing 26–50 of 150 awards we hold
- Renovate Dormitory B205 Crwu 21-1019 ↗Department of the Air Forceawarded 26 Feb 2025
- Minimum Guarantee For The Indefinite Delivery Contract (Idc) For Architect Engineering Services For Use Within Southwestern Division (Swd), Projects Assigned To Swd, And Primarily In Support Of Tulsa District (Swt). ↗Department of the Army£3kawarded 31 Jan 2025
- Designer Of Record Services, Puerto Rico Dept Of Agriculture, Renovation Of Lab Bldg 3 ↗Animal and Plant Health Inspection Service£1.3mawarded 17 Jan 2025
- Architect Engineering Design For The 91st Cyber Ops Center- Joint Base San Antonio ↗Department of the Army£2.2mawarded 20 Dec 2024
- Base - 35% Design Ft. Johnson Ruba ↗Department of the Army£4.9mawarded 25 Nov 2024
- The Contractor Shall Perform All Services Required To Prepare And Furnish A Complete Investigative Report And 35% Design As Stated In The Statement Of Work Dated 26 August 2024. ↗Department of the Air Force£596kawarded 4 Oct 2024
- Southeast Regional Architect-Engineer (Serae) Task Order To Provide Design For Vehicle Assembly Building High Bay 4 Modifications , Project Control Number 99500.3 ↗National Aeronautics and Space Administration£1.6mawarded 26 Sept 2024
- Provide Program, Project, Construction And Commissioning Development And Management Expertise In Order To Identify, Compile, Organize And Schedule Project Activities Associated With Known Upgrade Projects And Required Recommissioning, Current Commiss ↗Agricultural Research Service£2.2mawarded 13 Sept 2024
- B301 Renovation Design, 1st And 2nd Floors ↗Department of the Air Force£62kawarded 11 Sept 2024
- Nbaf Master Plan (Mp) Reach Back Support, Project Management ↗Agricultural Research Service£116kawarded 30 Aug 2024
- Biorepository Transfer Support Task Order 1 ↗Animal and Plant Health Inspection Service£4.3mawarded 30 Aug 2024
- Tdka 19-1023 Pmel B506 HVAC Repairs And Upgrades ↗Department of the Air Force£415kawarded 27 Aug 2024
- A-E Services For Bamc Energy Upgrades ↗Department of the Army£996kawarded 13 Aug 2024
- Fsap So Support - Federal Select Agent Program Storage Only Support ↗Agricultural Research Service£238kawarded 9 Aug 2024
- Southeast Regional Architect-Engineer (Serae) Task Order To Provide A Study For Phase 3 Modify Vehicle Assembly Building For Space Launch System Block 1b. Project Control Number (Pcn) 99500.1. ↗National Aeronautics and Space Administration£209kawarded 6 Aug 2024
- Fy25 (Pop Beginning 10_1 Using Fy24 Funds)nrcs Mars Software Explorer Qc Sw Maintenance (Ngce) - Usda Reference Crq 4581157 Section 889 Has Been Included: Far.204.24 Certification And Incorporate 52.204.25 ↗Office of the Chief Financial Officer£13kawarded 2 Aug 2024
- Building 1142 HVAC Repairs And Upgrades Iaw The Sow Dated 16 April 2024. ↗Department of the Air Force£347kawarded 1 Jul 2024
- A&e Design Planning Charrette Report Dorm B28 ↗Department of the Air Force£298kawarded 25 Jun 2024
- Title I Design Services To Develop An A/E Analysis Of The Natural Gas Distribution Grid Followed By Owner Review And Design Document Package With Cost Estimate. In Accordance With (Iaw) The Statement Of Objectives. See Attch 1. ↗Department of the Air Force£69kawarded 21 Jun 2024
- A-E For Chapel For Airmen, Jbsa-Lak Period Of Performance 1095 Days ↗Department of the Army£6.3mawarded 24 May 2024
- Architect Engineering Design For Renovation Of Five Buildings, Fort Smith ↗Department of the Army£1.4mawarded 3 May 2024
- Contract Award For The Plum Island Animal Disease Center (Piadc) Plum Island Closure And Support (Pics) Program Scientific, Technical And Engineering Support (Stens) Project. ↗Office of Procurement Operations£14.9mawarded 8 Jan 2024
- Ft Riley Euph Barracks Design A, B, C ↗Department of the Army£5.0mawarded 26 Oct 2023
- Space Utilization Study B1005 ↗Department of the Air Force£106kawarded 23 Oct 2023
- Architechtural And Engineering Services For Dsn Utility Study North Of Randall On F.e. Warren Afb. ↗Department of the Air Force£632kawarded 17 Oct 2023
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.