Supplier profile
OMEXOM GA Energo s.r.o.
Every public-sector award we hold for this supplier, across Czechia, from 18 Dec 2015 to 11 Aug 2026.
Awards won
398
all time
Attributed value
€219k + CZK 1.1bn
378 shared, unvalued
Buyers
17
public bodies
Active
2015–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| ČEZ Distribuce, a. s. | 170 | CZK 496.6m |
| EG.D, a.s. | 83 | CZK 162.5m |
| EG.D, s.r.o. | 67 | not attributable |
| E.ON Distribuce, a.s. | 22 | not attributable |
| ČEZ Distribuce, a.s. | 19 | CZK 21.9m |
| ČEPS, a.s. | 12 | CZK 398.3m |
| E.ON Česká republika, s. r. o. | 7 | CZK 1.5m |
| ČEZ, a. s. | 7 | CZK 5.3m |
| CPI eMobility, a.s. | 2 | not attributable |
| Čeps, a.s. | 2 | not attributable |
What they win
Awards
Showing 1–25 of 398 awards we hold
- Czechia – Engineering works and construction works – V416 – modernizace na vyšší parametry; SO 01 (P.0498), stavebně-montážní práce ↗ČEPS, a.s.shared awardawarded 11 Aug 2026
- Czechia – Construction work – Dynamický nákupní systém pro stavební přípravu dobíjecích stanic pro PRO EMV, s.r.o. ↗PRO EMV, s.r.o.shared awardawarded 6 Aug 2026
- Czechia – Engineering works and construction works – V445/446 - modernizace na vyšší parametry (P.0552), stavebně-montážní práce ↗ČEPS, a.s.shared awardawarded 18 Jun 2026
- Czechia – Installation services of electricity distribution equipment – Náhradní přenosová trasa vn, vvn ↗ČEZ Distribuce, a. s.awarded 12 Jun 2026
- Czechia – Electrical power systems design services – MO_V141/142-posílení vedení 110kV VÝŠKOV_PD ↗ČEZ Distribuce, a. s.shared awardawarded 12 Jun 2026
- Czechia – Overhead line construction – V1526,1527,1529,1530-obnova vedení ↗ČEZ Distribuce, a. s.£179.9mawarded 27 May 2026
- Czechia – Construction work – Výstavba dobíjecích stanic ↗ČEZ, a. s.shared awardawarded 7 May 2026
- Czechia – Construction work – Dynamický nákupní systém pro stavební přípravu dobíjecích stanic ↗Pražská energetika, a.s.shared awardawarded 5 May 2026
- Czechia – Overhead line construction – MO_V145/146/168 – POSÍL. VED. 110KV CHEZA ↗ČEZ Distribuce, a. s.£303.9mawarded 8 Apr 2026
- Czechia – Engineering design services for the construction of civil engineering works – Projektové práce a analýza lokalit - dobíjecí stanice ↗ČEZ, a. s.shared awardawarded 2 Feb 2026
- Czechia – Architectural, construction, engineering and inspection services – Projektová dokumentace – TR 400/110 kV Leskovice, část EG.D ↗EG.D, s.r.o.shared awardawarded 29 Jan 2026
- Czechia – Electrical power systems design services – Projektové dokumentace pro energetiku I - liniové stavby nn, vn ↗ČEZ Distribuce, a. s.shared awardawarded 27 Jan 2026
- Czechia – Electrical power systems design services – Projektové dokumentace pro energetiku I - liniové stavby nn, vn ↗ČEZ Distribuce, a. s.shared awardawarded 27 Jan 2026
- Czechia – Engineering works and construction works – V432/429 - zdvojení vedení, Úsek 1 (P.0407) a KOC - rozšíření pro V429 (P.0598), stavebně-montážní práce ↗ČEPS, a.s.shared awardawarded 10 Dec 2025
- Czechia – Engineering works and construction works – V411/811- zdvojení vedení (P.0524), stavebně-montážní práce ↗ČEPS, a.s.shared awardawarded 1 Dec 2025
- Czechia – Electrical installation work – Stavební příprava pro dobíjecí stanice AC a DC ↗CPI eMobility, a.s.shared awardawarded 2 Oct 2025
- Czechia – Electrical installation work – Stavební příprava pro dobíjecí stanice AC a DC ↗CPI eMobility, a.s.shared awardawarded 2 Oct 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby malého rozsahu a běžné opravy na zařízení NN do 1000 V ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby malého rozsahu a běžné opravy na zařízení NN do 1000 V ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby malého rozsahu a běžné opravy na zařízení NN do 1000 V_02 ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby, běžné opravy a odstraňování poruch na zařízení VN, NN a DTS_09 ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby, běžné opravy a odstraňování poruch na zařízení VN, NN a DTS ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby malého rozsahu a běžné opravy na zařízení NN do 1000 V ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby, běžné opravy a odstraňování poruch na zařízení VN, NN a DTS ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
- Czechia – Construction work for electricity power lines – ELEKTROMONTÁŽNÍ PRÁCE II – Stavby malého rozsahu a běžné opravy na zařízení NN do 1000 V_09 ↗EG.D, s.r.o.shared awardawarded 24 Sept 2025
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.