Supplier profile
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE
Every public-sector award we hold for this supplier, across the United States, from 30 Sept 1978 to 13 May 2026.
Awards won
87
all time
Attributed value
$843.9m
as published
Buyers
21
public bodies
Active
1978–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Department of the Navy | 31 | $2.4m |
| National Aeronautics and Space Administration | 15 | $779.3m |
| Department of the Army | 8 | $7.2m |
| National Institutes of Health | 7 | $1.7m |
| Department of Veterans Affairs | 3 | $61k |
| Department of the Air Force | 3 | $15.9m |
| Agricultural Research Service | 2 | $13k |
| Centers for Disease Control and Prevention | 2 | $1.7m |
| Defense Advanced Research Projects Agency | 2 | $22.8m |
| Federal Highway Administration | 2 | $3.2m |
What they win
Awards
Showing 76–87 of 87 awards we hold
- Full Service Tem/Sem Sample Prep ↗Agricultural Research Service$6kawarded 1 Nov 2019
- Physical Properties Testing And Inspection ↗Department of State$134kawarded 6 Sept 2019
- Escape And Plasma Acceleration And Dynamics Explorers (Escapade) Mission -.phase A Concept Study. ↗National Aeronautics and Space Administration$68.5mawarded 21 Aug 2019
- Design Of High Confidence Learning-Enabled Systems (Hicon-Learn) ↗Department of the Air Force$8.1mawarded 1 May 2018
- Ucb Shall Provide The Necessary Personnel, Materials, Equipment, And Facilities To Produce The Cosi-X Phase A Concept Study Report (Csr) That Encompasses: 1. Principal Investigator Program Office. 2. Instrument System Engineering, Including Instrument Mission Assurance. 3. Design Of A Flight Qualified Cosi-X Instrument Meeting Mission And Science Requirements. 4. Develop Plans In Support Of Integration And Test Of The Cosi-X Instrument Flight System. 5. Develop Plans In Support Of Essential Field Operations 6. Develop Plans In Support Of Launch Operations, Flight Operations. 7. Develop Plans F ↗National Aeronautics and Space Administration$418kawarded 20 Feb 2018
- Igf::ot::igf Phylochip Microbial Source Tracking To 0007 Ord 20 Chips ↗Environmental Protection Agency$38kawarded 8 May 2017
- Igf::ot::igf Foodborne Uti Study ↗Centers for Disease Control and Prevention$561kawarded 22 Sept 2016
- Igf::ot::igf The Objective Of The Circuit Realization At Faster Timescales (Craft) Program Is To Develop Tools To Revolutionize The Design And Fabrication Of Custom Integrated Circuits More Efficiently To Enable High-Performance Electronic Solutions Faster And With More Flexibility. ↗Defense Advanced Research Projects Agency$19.7mawarded 22 Mar 2016
- Phase A Through F - Icon. This Contract Is For The University Of California (Ucb) At Berkeley Space Sciences Laboratory, The Prime Contractual Interface For NASA For The Ionospheric Connection Explorer (Lcon) Mission Investigation Team, That Covers Phase A Of The Mission. The NASA Ao Is Nnhiizda0020. Under The Direction Of The Principal Investigator (Pi) Dr. Thomas Immel, Ucb Will Be The Principal Contractor To NASA For Icon. Ucb Shall Conduct The Phase A Concept Study In Accordance With The Concept Study Guidelines. In Performance Of This Study, The Icon Team Shall: A. Conduct Trade And Risk ↗National Aeronautics and Space Administration$182.1mawarded 11 Jan 2012
- Time History Of Events¯oscale Interactions During Substorms (Themis) Mission Phase A Effort The Contractor Shall Provide A Concept Study For The Themis Mission In Order To Provide NASA With More Definitive Information Regarding The Cost, Risk, And Feasibility Of The Investigation. The Contractor Shall Prepare And Deliver A Concept Study Report Detailing The Results Of The Study In Accordance With Attachment B Of The Contract Entitled "medium-Class Explorer Program Guidelines And Criteria For The Phase A Concept Study". The Contractor Shall Also Support A NASA Site Visit At Its Facility To ↗National Aeronautics and Space Administration$200.5mawarded 15 Jul 2002
- Phase A Concept Study For Hessi Investigation ↗National Aeronautics and Space Administration$70.0mawarded 19 Nov 1997
- M&o Of Lanl Br Of U Of Ca ↗Department of Energyawarded 30 Sept 1978
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative. Profiles may take up to an hour to reflect newly collected records.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.