Supplier profile
ROBERT PECCIA & ASSOCIATES, INC.
Every public-sector award we hold for this supplier, across the United States, from 3 Dec 2015 to 16 Jul 2026.
Awards won
125
all time
Attributed value
$19.9m
as published
Buyers
3
public bodies
Active
2015–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Federal Highway Administration | 71 | $12.4m |
| Forest Service | 27 | $3.7m |
| National Park Service | 27 | $3.8m |
What they win
Awards
Showing 26–50 of 125 awards we hold
- Or Fs Frewn602 28(1), Road 28 Reconstruction Geotechnical Investigation And 30% Design ↗Federal Highway Administration£268kawarded 19 Nov 2024
- Regions 1 And 2 Have Non Redundant Steel Tension Member (Nstm) Bridges And Difficult To Inspect Bridges That Have Inspection Needs. This Task Order Will Assist The Forest Service By Providing Nstm And Difficult Routine Inspections. ↗Forest Service£205kawarded 28 Sept 2024
- Mt Dar Malm 2026(1), Defense Access Roads Fy 2026 Advance For Tasks Up To 30% Design ↗Federal Highway Administration£301kawarded 10 Sept 2024
- Mt Prairie 2016(3), Milwaukee Bridge Resurfacing And Rehabilitation Planning Tasks ↗Federal Highway Administration£40kawarded 14 Aug 2024
- Wa Np Olym 103(4), Rehabilitate Sol Duc Valley Road Environmental Tasks ↗Federal Highway Administration£147kawarded 14 Aug 2024
- Id Flap Ada 2019(1), Western Heritage Byway, Swan Falls Road Survey Tasks ↗Federal Highway Administration£75kawarded 8 Aug 2024
- Mt Lincoln 2016(2), Sophie Lake Road Corridor Study Existing Conditions Review, Systemic And Hot Spot Safety Assessment, Public Involvement, Developing And Accessing Corridor Improvements, And An Implementation Strategy To Rehabilitate The Roadway T ↗Federal Highway Administration£146kawarded 17 Jul 2024
- Ak Pfh 58(1), Neck Lake Road Reconstruction: Npowi Hwy. To Marine Access Facility Jct. Repackaging Project ↗Federal Highway Administration£98kawarded 24 Jun 2024
- Gaoa Holland Lake A/E Design Wastewater Lagoon In Accordance With The Soi And Sow Below ↗Forest Service£386kawarded 28 May 2024
- Title I Condition Assessment & Scoping Services - Eppleton Hall Drydock - San Francisco Maritime National Historic Park, Ca - Pmis #335162 ↗National Park Service£206kawarded 25 Apr 2024
- Contract 140p8519d0005 Task Order 140p2024f0184, Design Services For Design Construction Documents (Cd) To Extend Public Launch Ramp At Echo Bay, Lake Mead National Recreation Area (Lake 324894) ↗National Park Service£95kawarded 25 Apr 2024
- Id Flap Bonner 841(1), Trestle Creek Road, Mp 100 To 103.7 Provides Preconstruction Record Of Survey, Row Plans, Exhibits, And Legal Descriptions For The Required Acquisitions ↗Federal Highway Administration£95kawarded 23 Apr 2024
- Title Ii Design And Final Construction Documents Services, Rehabilitate Earthquake Trail, Point Reyes National Seashore, California ↗National Park Service£189kawarded 23 Apr 2024
- Title Ii Design And Final Construction Documents Services, Repair Bolinas Ridge Trail, Point Reyes National Seashore, California. ↗National Park Service£238kawarded 17 Apr 2024
- Title I Develop Report For State Of California Water Board, Yosemite National Park ↗National Park Service£17kawarded 1 Apr 2024
- A&e Task Order Award For Nf Deep Creek, Wf Rock Creek Aop, And Spar Creek, Kootenai National Forest, Montana ↗Forest Service£181kawarded 26 Mar 2024
- Lake 332529 - Extend Public Launch Ramp ↗National Park Service£122kawarded 22 Mar 2024
- Mt Np Libi 10(2), Little Bighorn Battlefield National Monument - Phase 1 Nepa And Design Tasks ↗Federal Highway Administration£69kawarded 12 Mar 2024
- Mt Dar Malm 2024(1), Defense Access Roads Fy 2024 Earned Value Assessment ↗Federal Highway Administration£35kawarded 6 Mar 2024
- Mt Dar Malm 2025(1), Defense Access Roads Fy 2025 Intermediate Through Final Design Phases ↗Federal Highway Administration£278kawarded 29 Feb 2024
- Mt Bighorn 46(1), Warman Loop Road Engineering Support During Advertisement And Construction ↗Federal Highway Administration£5kawarded 14 Feb 2024
- Gaoa Holland Lake A/E Site Visit Only ↗Forest Service£9kawarded 27 Dec 2023
- The Project Scope Includes The Following Subtasks. Subtask 1 Includes Surveying The Full Campground Complex As Well As The Proposed Expansion Area. Subtasks 2 And 4 Are Separate Project Locations In The Campground Complex. Sub Task 1and2 Are Base ↗Forest Service£217kawarded 2 Oct 2023
- Title I Ae Services Hercules Dry Dock ↗National Park Service£258kawarded 21 Sept 2023
- Replace Irrigation And Turf In Victorian Park ↗National Park Service£142kawarded 19 Sept 2023
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.