Supplier profile
safeTrail GmbH
Every public-sector award we hold for this supplier, across Germany, from 16 Apr 2024 to 7 Sept 2026.
Awards won
15
all time
Attributed value
not attributable
12 shared, unvalued
Buyers
2
public bodies
Active
2024–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Deutsche Bahn AG Konzernleitung (Bukr 10) | 11 | not attributable |
| DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16) | 4 | not attributable |
What they win
Awards
All 15 awards we hold
- Los 1 Abnahmeprüfleistungen Leit- & Sicherungstechnik (LST) ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 7 Sept 2026
- Germany – Engineering-design services for traffic installations – Rahmenvereinbarung Abnahmeprüfleistungen LST, EEA, OLA und TK ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 25 Aug 2026
- Germany – Architectural, engineering and planning services – Planprüfungsleistungen 2025 - 2029 von Flensburg bis Wrist ↗DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)awarded 16 Aug 2025
- Los 1 Planprüfleistung PT1 PA1 ↗DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)awarded 15 Aug 2025
- Rahmenvereinbarung Planungsleistungen für Bahnübergänge ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 14 Jul 2025
- Germany – Engineering-design services for traffic installations – Rahmenvereinbarung Planungsleistungen für Bahnübergänge ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 3 Jul 2025
- Germany – Engineering services – BVB-Leistungen ESTW-A und Gleis 5 Schönefeld (BFHS) ↗DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)shared awardawarded 14 Nov 2024
- Los 1 BVB-Leistungen nach VV Bau ↗DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)shared awardawarded 14 Nov 2024
- Los 1 Abnahmeprüfleistungen Elektrische Energieerzeugungsanlagen (EEA) ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 14 May 2024
- Germany – Architectural, engineering and planning services – Rahmenvereinbarung Abnahmeprüfungen in 3 Losen ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 14 May 2024
- Los 1 - Neubau ESTW, ETCS, DSTW ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 3 May 2024
- Germany – Architectural, engineering and planning services – RV Rahmenvereinbarung Planungsleistungen LST ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 23 Apr 2024
- Los 1 Planprüfleistungen Leit- und Sicherungstechnik (LST): ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 19 Apr 2024
- Los 2 Planprüfleistungen Elektrische Energieerzeugungsanlagen (EEA) ↗Deutsche Bahn AG Konzernleitung (Bukr 10)awarded 19 Apr 2024
- Germany – Architectural, engineering and planning services – RV Rahmenvereinbarung Planprüfleistungen LST, EEA, OLA, Statik (Bahnstromanlagen) und TK ↗Deutsche Bahn AG Konzernleitung (Bukr 10)shared awardawarded 16 Apr 2024
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.