Supplier profile
SLS - Ingenieurbüro für Sicherheitstechnik
Every public-sector award we hold for this supplier, across Germany, from 12 Oct 2020 to 22 Jul 2025.
Awards won
11
all time
Attributed value
€163k
as published
Buyers
6
public bodies
Active
2020–2025
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Mühlenkreiskliniken AöR | 4 | €2 |
| Baugesellschaft UMG mbH | 2 | €115k |
| Kreis Steinburg | 2 | €0 |
| Entsorgungs- und Baubetrieb Anstalt des öffentlichen Rechts der Stadt Worms ("ebwo AöR") | 1 | €19k |
| Stadt Duisburg – Umweltamt | 1 | €29k |
| Stadt Neukirchen-Vluyn, Hauptamt | 1 | €0 |
What they win
Awards
All 11 awards we hold
- Germany – Health and safety services – Sicherheitskoordination KHN ↗Kreis Steinburg€0awarded 22 Jul 2025
- Sicherheitskoordination KHN ↗Kreis Steinburgawarded 21 Jul 2025
- Los 1: SiGeKo-Leistungen zum „Klinikneubau im Lübbecker Land (KLL)“ für die Mühlenkreiskliniken AöR (MKK) ↗Mühlenkreiskliniken AöRawarded 28 Feb 2025
- Los 2: SiGeKo-Leistungen zum „Anbau des Krankenhauses Bad Oeynhausen (BOE) an die Auguste-Viktoria-Klinik (AVK)“ für die Mühlenkreiskliniken AöR (MKK) ↗Mühlenkreiskliniken AöRawarded 28 Feb 2025
- Germany – Architectural, construction, engineering and inspection services – Los 1: SiGeKo-Leistungen zum „Klinikneubau im Lübbecker Land (KLL)“ für die Mühlenkreiskliniken AöR (MKK) ↗Mühlenkreiskliniken AöR€1awarded 17 Feb 2025
- Germany – Architectural, construction, engineering and inspection services – Los 2: SiGeKo-Leistungen zum „Anbau des Krankenhauses Bad Oeynhausen (BOE) an die Auguste-Viktoria-Klinik (AVK)“ für die Mühlenkreiskliniken AöR (MKK) ↗Mühlenkreiskliniken AöR€1awarded 17 Feb 2025
- Leistungen der Sicherheits- und Gesundheitsschutzkoordination (im Folgenden auch "SiGeKo") für das Projekt Salamandergelände ↗Entsorgungs- und Baubetrieb Anstalt des öffentlichen Rechts der Stadt Worms ("ebwo AöR")€19kawarded 2 Jan 2025
- Koordination nach Baustellenverordnung (SiGeKo) für den Neubau der Baustufe 2 der Universitätsmedizin Göttingen ↗Baugesellschaft UMG mbH€58kawarded 10 Oct 2024
- Germany – Health and safety services – Koordination nach Baustellenverordnung (SiGeKo) für den Neubau der Baustufe 2 der Universitätsmedizin Göttingen ↗Baugesellschaft UMG mbH€58kawarded 21 Sept 2024
- Germany-Neukirchen-Vluyn: Architectural, construction, engineering and inspection services ↗Stadt Neukirchen-Vluyn, Hauptamt€0awarded 12 Sept 2023
- Germany-Duisburg: Health and safety services ↗Stadt Duisburg – Umweltamt€29kawarded 12 Oct 2020
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.