Supplier profile
THE UNIVERSITY OF ALABAMA IN HUNTSVILLE
Every public-sector award we hold for this supplier, across the United States, from 13 Dec 2002 to 22 May 2026.
Awards won
458
all time
Attributed value
$252.8m
as published
Buyers
7
public bodies
Active
2002–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Department of the Army | 439 | $238.2m |
| National Aeronautics and Space Administration | 9 | $1.8m |
| Missile Defense Agency | 6 | $7.9m |
| Defense Contract Management Agency | 1 | $4.6m |
| Department of Energy | 1 | $27k |
| Department of the Navy | 1 | $156k |
| U.S. Fish and Wildlife Service | 1 | $28k |
What they win
Awards
Showing 76–100 of 458 awards we hold
- Igf::ot::igf Soe Entitled, "prototype Integration Facility (Pif) Windchill Support Research Development And Analysis For Amrdec Windchill Product Data Management System" ↗Department of the Army$257kawarded 29 Sept 2015
- Igf::ot::igf Iod Infrastructure Enhancement ↗Department of the Army$110kawarded 28 Sept 2015
- Igf::ot::igf Sow Entitled, "missile Disposition System Hellfire Stockpile Reliability Program (Srp)after Action Board Database" ↗Department of the Army$23kawarded 28 Sept 2015
- Igf::ot::igf Sow"hellfire Stockpile Reliability Program (Srp) Firing Information Reports Through Electronic Internet Tracking (Fireit) Database" ↗Department of the Army$24kawarded 28 Sept 2015
- Igf::ot::igf New Task Order For "visualization Based Design Lab (Vizlab), Animated Marketing Video, Defense Threat Reduction Agency (Dtra) Project #2 (Engineering Design, Training And Instructions Using Data Visualization)" ↗Department of the Army$35kawarded 27 Sept 2015
- Igf::ot::igf Task Order 0498- Visualization Based Design Lab Ah-64d/E Kit Components 3d Laser Scans ↗Department of the Army$79kawarded 25 Sept 2015
- Igf::ot::igf Visualization Based Design Lab Msd Ds Interface ↗Department of the Army$80kawarded 25 Sept 2015
- Igf::ot::igf Task Order 0486- Supply Chain Management And Market Research For Industrial Operations Division (Awcf) ↗Department of the Army$120kawarded 25 Sept 2015
- Igf::ot::igf Sow Entitled, "interactive Multimedia Instruction (Imi) Development And Training Support Package (Tsp) Development For The H-60 External Hoist". ↗Department of the Army$170kawarded 23 Sept 2015
- Igf::ot::igf Task Order 0487 Visualization Design Lab Multimedia Material Development For The Improved Medevac Ac Paramedic And Critical Care Transport (Impacct) ↗Department of the Army$120kawarded 22 Sept 2015
- Igf::ot::igf Task Order 0475- Visualization Based Design Lab Interactive Multimedia Instruction (Imi) Development And Training Support Package (Tsp) Development For The High Performance Rescue Hoist Assembly ↗Department of the Army$75kawarded 17 Sept 2015
- Igf::ot::igf Visualization Based Design Lab (Vizlab) Cruise Missile Defense System (Cmds) Engineering Design, Training, And Instructions Using Data Visualization. ↗Department of the Army$50kawarded 17 Sept 2015
- Igf::ot::igf Mission Support Of The Aviation Engineering Directorate (Aed) ↗Department of the Army$846kawarded 16 Sept 2015
- Igf::ot::igf System Simulation And Development Directorate (Ssdd) Mission Support ↗Department of the Army$400kawarded 16 Sept 2015
- Igf::ot::igf New Task Order For "supply Chain Database Improvements For The Amrdec Engineering Directorate" ↗Department of the Army$100kawarded 11 Sept 2015
- Igf::ot::igf To 0493 - Ram Software Tools ↗Department of the Army$35kawarded 11 Sept 2015
- Igf::ot::igf Task Order 0491- Research, Analysis, Evaluation And Enhancement Of U.s, Army Test, Measurement, And Diagnostic Equipment Activity (Usata) ↗Department of the Army$600kawarded 10 Sept 2015
- Igf::ot::igf To Csi Data Base Mgmt ↗Department of the Army$41kawarded 1 Sept 2015
- Igf::ot::igf Sow Entitled, "statement Of Work Entitled, "research And Analysis Of Computer Networking Capabilitied For The Weapons Development And Integration Directorate" ↗Department of the Army$761kawarded 31 Aug 2015
- Igf::ot::igf Sow Entitled, "technical Data Management Support Research Development And Analysis For Amrdec Windchill Product Data Management System" ↗Department of the Army$193kawarded 31 Aug 2015
- Igf::ot::igf Task Order 0478- Visualization Based Design Lab Multi-Mission Launcher (Mml) Time Lapse Video ↗Department of the Army$30kawarded 29 Aug 2015
- Igf::ot::igf Sow Entitled, "research, Analysis And Support Of The Aviation Engineering Directorate (Aed) Systems Engineering Process" ↗Department of the Army$243kawarded 24 Aug 2015
- Igf::ot::igf Task Order Supply Chain Management And Market Research For Iod ↗Department of the Army$115kawarded 24 Jul 2015
- Igf::ot::igf To 0467 Res, Anal, Eval, And Enhancement Of Smdc Technology Development ↗Department of the Army$149kawarded 24 Jul 2015
- Igf::ot::igf To 0466 Research, Analysis, And Support Of The Ch-47 Systems Engineering Process ↗Department of the Army$92kawarded 7 Jul 2015
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative. Profiles may take up to an hour to reflect newly collected records.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.