Supplier profile
WSP USA INC.
Every public-sector award we hold for this supplier, across the United States, from 10 Apr 2012 to 21 Sept 2026.
Awards won
253
all time
Attributed value
$231.4m
as published
Buyers
10
public bodies
Active
2012–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| Federal Highway Administration | 131 | $73.6m |
| Department of the Navy | 76 | $116.8m |
| Department of the Army | 28 | $32.1m |
| Saint Lawrence Seaway Development Corporation | 6 | $2.1m |
| Smithsonian Institution | 6 | $5.9m |
| U.S. International Development Finance Corporation | 2 | $175k |
| Forest Service | 1 | $11k |
| NAVFAC SYSTEMS AND EXP WARFARE CTR | 1 | $390k |
| National Park Service | 1 | $194k |
| U.S. Fish and Wildlife Service | 1 | $70k |
What they win
Awards
Showing 151–175 of 253 awards we hold
- Revitalize Historic Core. ↗Smithsonian Institution£1.4mawarded 23 Feb 2021
- Engineering Services Necessary For The Preparation Of Plans, Specifications, And Estimate (Ps&e) And Other Supporting Documents For Project: Np Cato 10(5), 11(2)resurfacing And Rehabilitation Of Foxville Deerfield Road (Rte. 0011) And Park Centra ↗Federal Highway Administration£751kawarded 17 Feb 2021
- Or Dot 18(2), Or-58: Fix-IT Corridor Culverts Engineering Support During Advertisement And Construction ↗Federal Highway Administration£273kawarded 16 Feb 2021
- Engineering Services Necessary For The Preparation Of Plans, Specifications, And Estimate (Ps&e) And Other Supporting Documents For Project: Np-Grsm 11(4)gatlinburg Tunnel (Structure 5460-085p)in Accordance With The Attached Statement Of Work. ↗Federal Highway Administration£716kawarded 16 Feb 2021
- Id Fs Erfo 2017(1)-29(1), Stoddard Pack Bridge Replacement Provide Construction Support ↗Federal Highway Administration£804kawarded 27 Jan 2021
- Drydock Progressive Failure Analysis And Recommendations For Targ ↗Department of the Navy£243kawarded 7 Jan 2021
- Wa Clallam 2018(1), Olympic Discovery Trail Provide Information And Recommendations From The Scoping Activities Prepared By The Consultant To Evaluate Project Scope, Schedule, Cost, Risks, And Delivery Methodology. The Project Will Include Project M ↗Federal Highway Administration£34kawarded 24 Nov 2020
- Provide Construction Management Services To Support The Construction Of P834 ↗Department of the Navy£860kawarded 18 Nov 2020
- Marine/Waterfront A-E Services Bid Support And Post Construction Award Services Option ↗Department of the Navy£100kawarded 9 Nov 2020
- Sofa Shape Hq Scf Secure Spaces ↗Department of the Army£3.0mawarded 30 Sept 2020
- Ae Design For Repair Sfab Buildings Phase 2 On Jblm, Wa. ↗Department of the Army£4.8mawarded 30 Sept 2020
- Sofa:oconus Renovate Ward 10d Patient Rooms ↗Department of the Army£381kawarded 29 Sept 2020
- Repair Railroad Culverts (Phase 2 Of 9) Mp31.55 Design ↗Department of the Navy£998kawarded 29 Sept 2020
- Ae: Design To Replace And Extend Outfall Pipe Of Ows-8 ↗Department of the Navy£533kawarded 29 Sept 2020
- Repair Zelacthed Point Pier&float Connections At Nuwc Zp Bangor, Washington ↗Department of the Navy£29kawarded 28 Sept 2020
- This Firm-Fixed-Price Task Order Is Issued For The Project Titled Documenting Effective E-Ticketing Implementation. Work Is To Be Performed In Accordance With The Sow And The Contractor's Technical Proposal. The Total Potential Value Of The T ↗Federal Highway Administration£361kawarded 23 Sept 2020
- Professional Service - Highway Finance Technical Support ↗Federal Highway Administration£707kawarded 23 Sept 2020
- Msr 12421586 Seismic Upgrades At Lagh, B/6300, Swfpac ↗Department of the Navy£122kawarded 22 Sept 2020
- Ae: Design For Construction Of Storm Water Filtration Systems ↗Department of the Navy£403kawarded 16 Sept 2020
- Hi-James Campbell Nwr Conceptual Site Plan ↗U.S. Fish and Wildlife Service£70kawarded 14 Sept 2020
- Ae_18848580_18848627 Replace Steam Lines B100 And Install Boilers ↗Department of the Navy£335kawarded 14 Sept 2020
- Engineering Services Necessary For The Preparation Of The Plans, Specifications, And Estimate (Ps&e) And Other Supporting Documents For Project: Np Rocr 503(1) 24(2) To Rehabilitate Waterside Drive And Piney Branch Parkway, Located In Rock Creek ↗Federal Highway Administration£1.3mawarded 9 Sept 2020
- Or Dot Crgnsa 100(4), Historic Columbia River Highway State Trail, Mitchell Point Crossing Engineering Support During Advertisement And Construction ↗Federal Highway Administration£416kawarded 27 Aug 2020
- Wfl Research 2020(13), Integrating Public Health In Public Land Transportation Planning Research Study On Integrating Public Health In Public Land Transportation Planning Two Separate Studies ↗Federal Highway Administration£498kawarded 27 Aug 2020
- Wfl Research 2020(11), Targeted Maintenance On Low Volume Roads Research Study On Building Resiliency Through Maintenance Activities Low Volume Roads And Public Lands Roadways And Applying Fhwas Vulnerability Assessment And Adaptation Framework To ↗Federal Highway Administration£615kawarded 7 Aug 2020
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.