Thameside West - Royal Docks
awardedGreater London Authority (GLA) · GB-PPON-PHGV-7784-TDZZ
Read the notice at Find a Tender ↗
Description
Background GLA Land and Property Limited ("GLAP") wishes to facilitate the development of the Thameside West site (the "Site") in London's docklands as a residential-led, mixed-use redevelopment, that supports the regeneration of a complex ex-industrial part of the Royal Docks. The Site comprises the Thames Wharf site, owned by GLAP, the Carlsberg Tetley site, owned two-thirds by Silvertown Homes Ltd ("SHL") and one-third by GLAP, and three smaller land parcels which are owned by SHL. GLAP and SHL (the "Landowners") concluded that their individual interests in the Site would be optimised by a coordinated strategy which brings forward the development of TSW as a whole, rather than developing separate parcels in isolation. To that end, on 22 October 2019 GLAP, SHL and Keystone Silvertown Ltd ("KSL") (as Guarantor) entered into a Cooperation Agreement ("CA") and several related agreements. This was done on the basis that entry into the agreements did not constitute the award of a contract regulated by the then-applicable public procurement regulations and in the interests of transparency, in order to inform the market and allow relevant economic operators to consider whether to bring a legal challenge, GLAP published a voluntary ex ante transparency notice in the Official Journal of the European Union in respect of the arrangements dated 13 September 2019 (reference: Works - 432854-2019 - TED). The CA anticipated the parties working together to obtain outline planning permission for the development and detailed planning permission for jointly owned phases of the development of the Site; to acquire any additional third-party interests in the Site; to bring about necessary infrastructure and enabling works; to establish an estate management strategy; and establish a disposal strategy for the Carlsberg Tetley site and jointly owned phases. That process resulted in the grant of a hybrid planning permission ("HPP") on 5 October 2021 which granted outline planning permission for the comprehensive development of the Site and detailed planning permission for the first phase. Alongside the CA, GLAP, SHL and KSL also entered into an equalisation agreement (the "Equalisation Agreement") setting out an agreed mechanism to balance the affordable housing allocation under the masterplan and to set out the basis on which future infrastructure expenditure is shared between the landowners (namely, 38 % GLAP versus 62 % SHL). The development of the Site pursuant to the HPP (the "Development") was to be divided into different phases. The CA provides that where SHL and its affiliates own a majority of the land area within a phase ("SHL Majority Phase"), and provided that SHL or its named affiliate meets certain criteria (relating to covenant strength, funding and relevant experience), SHL or the named affiliate will be the approved developer for that Phase and will enter into a disposal agreement and/or development agreement with the Landowners for the relevant development. However, this does not apply to a plot of land within a phase where the land is wholly owned by GLAP. On the same date as signing the CA, the Landowners and Keystone Land Developers Ltd entered into three agreements, all of which have now terminated following grant of the HPP - a land acquisition agreement, a development agency agreement and an estate management services agreement. Current position The HPP was commenced for planning purposes in July 2024. The construction of the Silvertown Tunnel and other market-related disruption delayed further development on Site. However, the Silvertown Tunnel is now complete and open and in principle the Development can proceed. GLAP's objective remains to facilitate the development of the Site as a residential-led mixed-use redevelopment. The configuration and ownership of the land is such that this objective can realistically only be achieved with the agreement of SHL which continues to own and control the majority of the Site. As part of the ongoing work to bring forward the Development, professional consultants instructed by SHL and KSL have undertaken a market testing exercise for the Site development opportunity, the results of which have been shared with GLAP. Having reviewed those results and made its own enquiries, GLAP has concluded that proceeding with the proposed award described below is the only realistic way it can achieve its objective. SHL has secured a commitment from Arada International Investments LLC to invest in SHL to improve the deliverability of the Development. Proposed award GLAP has agreed with SHL certain proposed confirmations, adjustments and amendments (together the "Amendments") to the CA and associated documentation entered into in 2019 that will (following the satisfaction of certain conditions precedent which will include SHL and KSL becoming indirectly majority owned and controlled by Arada International Investments LLC), in summary: • result in SHL being appointed as the "Approved Developer" not only in relation to SHL Majority Phases, as anticipated by the CA, but also the remainder of the Site, other than Plot V which the parties have separately agreed (as the CA anticipates could be the case) GLAP will bring forward for development outside the ambit of the CA: • enable SHL, therefore, to bring forward the Development across the Site pursuant to a Disposal Agreement to be entered into in due course; • by virtue of the Disposal Agreement entitle SHL to take phased transfers of GLAP's land interests at the Site (other than Plot V) as plots are brought forward for development, GLAP receiving pre-agreed consideration comprising minimum land value, planning overage and value overage; • result in the termination of the 2019 Equalisation Agreement, there being no ongoing requirement for that agreement due to SHL becoming the single developer across the Site (the Equalisation Agreement having been entered into in order to balance infrastructure and other costs across different land-holdings); and • record associated adjustments to the CA to reflect the revised proposed delivery structure for the Development. The contractual documentation, reflecting the Amendments, will therefore comprise the following (together with ancillary documents the "Contract"): (a) The CA, as amended and supplemented; (b) A Supplemental Agreement to the CA dated 16 November 2026 (the "First SA") which permits GLAP to bring forward the development of Plot V outside the ambit of the CA, as referred to above; (c) A second Supplement Agreement to the CA (the "Second SA"), to be entered into in due course; and (d) Once the conditions precedent under the Second SA are satisfied, a Disposal Agreement. The information provided in the template section of this notice is, necessarily, only a summary and interested parties should consider the Amendments in full. The Contract can be viewed (in redacted form to account for sensitive commercial information in accordance with s.94(1)(b) of the Procurement Act) at the following link: https://www.london.gov.uk/who-we-are/governance-and-spending/sharing-our-information/foi-disclosure-log/ttsw-royal-docks-transparency-notice-documents . The CA has been made available in its original 2019 form because most of the adjustments to it (as detailed in the Second SA and the Disposal Agreement) are not variations as such, being instead confirmations that certain provisions do not apply or are redundant in light of the proposed award or are suspended for so long as the Disposal Agreement remains in place. The nature of the Amendments is such that GLAP considers that they may give rise to the award of a new public contract. If this is so, GLAP considers that the direct award of the contract is justifiable. As such, it is publishing this Transparency Notice, which sets out the justification for the direct award below. There is an associated Mayoral Decision which can be found at https://www.london.gov.uk/md3542-thameside-west-land-disposal-arrangement .
Key facts
- Procedure
- Direct award
- Lots
- 1
- Contact
- Paul.Creed@London.gov.ukBSFAribaAdministration@tfl.gov.uk
- Contract period
- 17 Dec 2026 → 31 Dec 2056
- Value incl. VAT
- £2716m
- Category
- works
Awarded suppliers
- SILVERTOWN HOMES LIMITED · GB-COH-03954388 · UKI32, GB
Ground given for limiting competition
The buyer’s own stated reason for awarding without open competition, as published. Their assertion, not a finding.
Direct award justification • Single supplier - exclusive rights As a result of the Amendments, GLAP considers that the Contract (including the CA (as amended and supplemented), the First SA, the Second SA and the Disposal Agreement, once entered into) may comprise the award of a new public contract and should be treated as a direct award under section 41 and Schedule 5 of Procurement Act 2023 (PA23). Under paragraph 5 of Schedule 5 a direct award is permissible where a particular supplier is in possession of exclusive rights and there are no reasonable alternatives, which means only the supplier with those rights can deliver the goods, services or works sought to be procured by the contracting authority. GLAP considers that a direct award in relation to the Contract is justified on the basis that only SHL can supply the services required due to the following conditions being met: Schedule 5, Paragraph 5 (a) due to a particular supplier having...exclusive rights, only that supplier can supply the goods, services or works required; and (b) there are no reasonable alternatives to those goods, services or works. A. EXCLUSIVE RIGHTS The nature of the landholdings for the Development is such that, in order to bring forward the Development in accordance with the HPP and in a way that realises GLAP's objectives for the Site, GLAP cannot unilaterally appoint a developer for those works. It must instead use the mechanisms in the 2019 CA, including the requirement (alongside SHL's existing rights as Landowner for certain landholdings within the Site) to appoint SHL as Approved Developer where the relevant criteria are satisfied in relation to SHL Majority Phases. The CA requires co-ordination and agreement between the Landowners more generally in relation to how the Development is brought forward and by whom. The combination of SHL's rights (1) as Landowner of much of the Site and (2) in relation to the existing Approved Developer mechanism means that GLAP cannot realistically appoint a developer for the Site and bring the Site forward for development in accordance with existing planning requirements and the HPP without SHL's consent. GLAP considers that these rights comprise exclusive rights which justify the direct award. B. NO REASONABLE ALTERNATIVES GLAP does not consider there to be reasonable alternatives to its proposed course of action that would achieve GLAP's objective. GLAP's reasons for this conclusion include the following: - As indicated above, GLAP's position (and therefore its ability to pursue alternative solutions to achieve its objective) is constrained by SHL's exclusive rights, embodied in the existing contractual framework in the CA and arising from SHL's extensive land ownership at the Site. - GLAP's land at the Site is held for housing and regeneration purposes. In line with those purposes and the Greater London Authority's wider policy objectives, since the CA was originally entered into, GLAP's vision and objective has consistently been for the development of the Landowners' separate land-holdings to be optimised by delivering a co-ordinated holistic scheme that maximises the potential of the Site for regeneration and in particular the quantum of residential development that can be delivered. In keeping with this objective, the Development has been deliberately designed (in accordance with the principles set out in the CA) in such a way as to disregard the existing title boundaries between the Landowners' current land-holdings. - Almost all plots within the HPP involve the development of both GLAP owned land and SHL owned land. The HPP is not deliverable, and in GLAP's view no scheme with an equivalent number of new homes would be deliverable, if the Landowners were to bring forward their respective land-holdings for development independently, whether or not as part of a co-ordinated Masterplan. The desired approach therefore requires SHL's involvement and co-operation, as provided for in the CA. - Moreover, the complexity of the Site means that an approach to bringing forward development of the Site other than through a coordinated, Masterplan-based approach would not be a reasonable course of action. This is because of the complexities associated with (1) interfaces with the Silvertown Tunnel, Docklands Light Railway and London Underground assets, and (2) the need to significantly upgrade / improve existing Site infrastructure and flood protections. Without coordination among the Landowners, managing these interface and infrastructure complexities would pose challenges to development of the Site and, in effect, restrict the potential for any such development to a piecemeal and low density development. - As indicated above, GLAP is only intending to award the proposed Contract as a response to the introduction of a third-party developer, Arada, into the project, which has been arranged and facilitated by SHL. - SHL has sought such a development partner for some time and has tested the market extensively. Having done so, SHL has confirmed to GLAP that so far as it is concerned there is no other available partner in the market willing and able to progress the Development on terms that are commercially acceptable to SHL/KSL. Had Arada not been brought onboard by SHL, the development would continue to have stalled. Arada's involvement therefore unlocks the scheme for the Site and avoids further prolonged inactivity. - In light of this feedback and the effect of SHL's exclusive rights on how development on the Site can be brought forward, GLAP does not consider there to be an available and capable market of suppliers, particularly given the scale and complexity of the Development and the specific challenges of the Site. - Whilst there are separation provisions in the CA that are operable in circumstances where a co-ordinated development of the Site has failed to progress and which could therefore potentially be invoked, this would not enable GLAP to achieve its objectives as described above. Such a separation would involve unwinding the co-operation aspects of the CA, collapsing the structure, relinquishing the HPP and starting again. This would result in considerable delay, cost and uncertainty for GLAP, as well as (in the long term) a much less satisfactory outcome for GLAP's land and the wider Site. This would prevent GLAP from realising its objectives for the Site, in particular by delivering materially less housing than is provided for under the HPP. In addition, even in this scenario, GLAP would remain in joint venture with SHL in relation to a significant portion of the Site (the Carlsberg-Tetley site referred to above), with the associated constraints this entails for GLAP as a minority interest holder (i.e. GLAP would not be at liberty to promote a replacement housing scheme without SHL's co-operation and agreement). This scenario is not considered to present GLAP with a reasonable alternative to making the Amendments.
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- Find a Tender
- Notice id
- 108708-2026
- OCID
- ocds-h6vhtk-07bd39
- First seen
- 16 Nov 2026
- Last updated
- 16 Nov 2026
Licence Open Government Licence v3.0 ↗
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender.
GET /api/v1/tenders/15fb28e4-2018-467d-ac8f-ae00979b2787The source notice is authoritative — verify deadlines and documents there before bidding.