Skip to content

Spain – Refrigerating equipment – Helium Refrigeration System (HRS) for Isotope Separation System (ISS) of ITER Fuel Cycle

open

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') · n01110115D

Read the notice at ted-eu ↗

Value
€9.3m
Published
1 Sept 2026
Deadline
—
Type
opportunity
42513200 · Industrial machinery

Description

The scope of this procurement procedure is the design, manufacturing, assembly, factory acceptance testing, transport and delivery of the Helium Refrigeration System (HRS) for the Isotope Separation System (ISS) within the Tritium Plant at ITER, based on Reversed Turbo-Brayton technology. The HRS will supply a cooling net power of approximately 1500 W at 18.5 K for the ISS of the ITER Tritium Plant. Optional scope: Option 1: factory performance testing; Option 2: technical assistance for on-site installation and final connection activities; Option 3: technical assistance for commissioning and site acceptance testing. Before the final call for tender, F4E may decide to remove certain options from the scope.

Key facts

Procedure
neg-w-call
Category
supplies
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
601126-2026
First seen
9 Oct 2026
Last updated
9 Oct 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/18e9bd83-2c91-4fc3-8dca-58a0e9d8afe5

The source notice is authoritative — verify deadlines and documents there before bidding.