EU-504 System Maintenance for offshore grid connection systems
openRead the notice at tenderned ↗
Description
With the rapid growth of offshore wind in the North Sea, TenneT is delivering a major expansion of its offshore grid infrastructure. The offshore asset portfolio is moving from the current 700 MW AC offshore platforms and interconnectors towards larger and more complex 2 GW offshore platforms based on DC technology. The end of the current Mechanical & Electrotechnical Integrated Contract with SemSea per March 2028 requires a follow-up maintenance contract to be in place in time. The scope is covering the maintenance of TenneT’s existing 700 MW AC offshore platforms, DC interconnectors and future 2 GW DC platforms including associated onshore DC land stations. TenneT will procure this scope through a negotiated procedure with prior selection. Suitable candidates will be shortlisted in the selection phase and invited to first submit an initial offer in the award phase and after one or more negotiaton rounds submit their Best And Final Offer.
Key facts
- Reference
- 627741
- Procedure
- Mededingingsprocedure met onderhandeling
- Submit via
- https://s2c.mercell.com/today/234819
- Category
- Raamovereenkomst
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- Calendar export — the deadline as a calendar file
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- tenderned
- Notice id
- 451258
- First seen
- 29 Nov 2026
- Last updated
- 29 Nov 2026
Licence CC0 1.0 public domain dedication ↗
Source: TenderNed, via data.overheid.nl (CC0 1.0).
GET /api/v1/tenders/1c89a627-9100-40b1-b2eb-ad814c280c67The source notice is authoritative — verify deadlines and documents there before bidding.