Skip to content
TenderGraph

Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGB

open

W7MX USPFO ACTIVITY CAANG 129 · DEPT OF DEFENSE

Read the notice at sam-gov ↗

Value
unstated
Published
29 Sept 2026
Deadline
11 Nov 2026, 20:00 GMT · 17d left · as published, verify on the notice
Type
opportunity
US-CA

Description

The Contractor shall provide non-personal services, to include all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary for the construction of a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) simulator facility at Moffett Air National Guard Base (ANGB), Mountain View, California. This project will provide an approximately 8,202 gross square foot building consisting of a multi-story, high bay area to house the CRH-OFT simulator, with a single-story area containing CRH mission planning, briefing and debriefing rooms, administrative areas for training and support staff, OFT maintenance and parts storage rooms, secure and non-secure telecommunication rooms, latrine facilities and mechanical, electrical and utility support rooms utilizing conventional design and construction. The building will be of permanent construction with electrical, mechanical, HVAC, plumbing, wet sprinkler fire suppression, fire detection, access control, direct digital control, and utility management. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Air space and insulation to be located inside the cavity wall to meet Energy Code requirements. The primary roofing materials will be standing seam metal roofing to match other installation facilities and the perimeter sloped roof design will include a prefinished standing seam metal roof panel system over rigid insulation. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Main entrance doors will be a pair of anodized aluminum storefront entrance doors with insulating glass including a sidelight. The Mechanical, Electrical, Sim Bay and secondary egress doors will be painted, insulated hollow metal door and frames with controlled access. Antiterrorism/Force Protection elements are incorporated. Supporting facilities include landscaping, utilities, pavements, storm drainage, sanitary sewer, site improvements, communications support, cybersecurity control systems, and tempest security.

Key facts

Reference
W50S8X26BA011
Procedure
Solicitation
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
sam-gov
Notice id
31232012d5254c169ea9410e40bef0d0
First seen
9 Oct 2026
Last updated
9 Oct 2026

Licence US Government work — public domain (17 U.S.C. § 105) ↗

Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.

View at source ↗GET /api/v1/tenders/3ddd83f4-25f0-4fc8-916e-f4fe2b95a9c2

The source notice is authoritative — verify deadlines and documents there before bidding.