Skip to content
TenderGraph

PERMISSION — Townlands of Claragh and Errigal , Cootehill , Co. Cavan

open

Cavan County Council (planning authority)

Read the notice at Planning (Ireland) ↗

Value
unstated
Published
30 Oct 2026
Deadline
2 Jan 2027, 00:00 GMT · 59d left · as published, verify on the notice
Type
planning
45000000 · Construction workIreland

Description

for the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 3,416 sq.m. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: • Construction of 2 no. primary digesters (with an overall height of c. 11.5m), a pump house (with a gross floor area (GFA) of c. 360.5 sq.m), and 2 no. post digester tanks (with an overall height of c. 11.5m), located centrally on site. • Construction of a digestate storage tank (c. 16.4m in height) and a fuel tank (c. 2m in height) located in the northern section of the site, to the north of the primary and post digester tanks. • Construction of roofed silage clamps (with a GFA of c. 928.3 sq.m and a height of c. 8.7m) and 2 no. prepits (c. 4.3m in height), located in the western section of the site, to the west of the primary and post digester tanks. • Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12.1m and a GFA of c. 1,703.7 sq.m) with odour abatement system (with a height of c. 13m to odour abatement stack), located in the southwestern section of the site, to the south of the roofed silage clamps. • Construction of a pasteurisation buffer tank (c. 4.3m in height), a pasteurisation unit (with a maximum height of c. 4.2m), a combined heat and power (CHP) unit (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 38.5 sq.m), a biomethane boiler (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 12.74 sq.m), a gas treatment system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the primary digesters, within the central section of the site. • Construction of a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels) and a grid injection unit (with a height of c. 2.8m and a GFA of c. 21.7 sq.m), located to the south of the gas treatment system, in the south-central section of the site. • Construction of a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 23.5 sq.m and a height of c. 3.4m), located in the southeastern section of the site. • Constr

Key facts

Procedure
PERMISSION
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
Planning (Ireland)
Notice id
Cavan County Council/2660635
First seen
3 Nov 2026
Last updated
3 Nov 2026

Licence CC BY 4.0 ↗

Source: Department of Housing, Local Government and Heritage — National Planning Applications (data.gov.ie), licensed under CC BY 4.0.

View at source ↗GET /api/v1/tenders/3fee0d08-5c8f-4ecc-ae09-603ab6ff1cbc

The source notice is authoritative — verify deadlines and documents there before bidding.