Denmark – Architectural, construction, engineering and inspection services – Framework agreement regarding Third-Party Verification and Certification of the Danish Hydrogen Backbone
closedEnerginet Brint A/S · 45435326
Description
The scope of services for the framework agreement includes all phases of the DHB-1 project from detailed design to testing and commissioning for the purpose of taking the hydrogen transmission asset into operation. Major project phases include, for example, detailed design; fabrication and manufacture of system components; installation, construction and testing of the installed components; including sufficient documentation and due diligence to meet all necessary internal guidelines, and external governance such as directives, executive orders, standards, codes and established industry guidelines. These directives and the like form the basis of the ‘Project Compliance Plan. The Contracting Authority wants to purchase verification and certification services from an independent, third-party agency in order to satisfy those verification and certification requirements laid down under the compliance plan. The full scope of services of the design & installation contractors, including a full description of all known project constraints against which the Project shall be Verified or Certified, is included in this document package. For further details regarding the purchase, reference is made to the tender documents. The tendered framework agreement has a duration of five (5) years. The framework agreement can be extended with two (2) years + one (1) years. Subsequent contracts under the framework agreement will be awarded directly to the supplier who submitted the most economically advantageous tender, see section 4.1. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3.
Key facts
- Procedure
- neg-w-call
- Framework agreement
- Yes — a framework or dynamic purchasing system, not a single contract
- Contact
- procurement@energinet.dk
- Category
- services
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- ted-eu
- Notice id
- 588276-2025
- First seen
- 22 Aug 2026
- Last updated
- 28 Aug 2026
Licence EU reuse — Commission Decision 2011/833/EU ↗
Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.
GET /api/v1/tenders/40cfb55d-d0d2-413e-a7cb-d8a0a761f06fThe source notice is authoritative — verify deadlines and documents there before bidding.