Skip to content

France – Batteries – Energy storage – Call for applications for the supply of Lithium Iron Phosphate (LFP) batteries and, if applicable, the inverter, transformer, and operation and maintenance (O&M) for the DC or DC+AC part of an energy storage project in France (Variscourt).

closed

EDF power solutions · 37967763600217

Read the notice at ted-eu ↗

Value
unstated
Published
23 Dec 2025
Deadline
—
Type
opportunity
31440000 · Electrical machinery & apparatus31155000 · Electrical machinery & apparatus31213200 · Electrical machinery & apparatus65320000 · Public utilities

Description

EDF Power Solutions, a leader in renewable energy production and a subsidiary of the EDF group, carries the group's ambitions in renewable energies. The market concerns the installation of batteries and the potential operation and maintenance of a storage project in Variscourt (Hauts-de-France region). The storage facility has the following characteristics: - Battery capacity: 95 MWh - Battery power: 47.5 MW - Technology: LFP (lithium iron phosphate) - Project duration: 25 years - COD: Q1/2028 Execution part: The contractor must provide and install the lithium iron phosphate batteries and, if applicable, the inverter and transformer that meet the technical specifications and safety standards of EDF Power Solutions. Operation – Maintenance part: The operation and maintenance of the site will be based on a contract with a maximum duration of 25 years. The contractor must take into account all the technical characteristics of the project related to the execution phase. During the duration of this contract, the contractor will receive an annual fixed remuneration based on its pricing offer which will include: - Site supervision and security - Preventive maintenance of DC or AC equipment - Corrective maintenance of DC or AC equipment - Management of warranties and regulatory checks - Relationship with EDF Power Solutions - Maintenance of battery performance: availability, SOH, RTE, and auxiliary consumptions. EDF Power Solutions reserves the option to withdraw the services related to DC and AC equipment at the time of the finalization of the contract. EDF Power Solutions does not take responsibility for any direct or indirect costs incurred in preparing the response to this request, nor for losses and costs related to potential site visits and/or meetings, nor for the cancellation of this request. EDF Power Solutions reserves the right to cancel this market notice if the building permit is not obtained.

Key facts

Procedure
neg-w-call
Category
supplies
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
856209-2025
First seen
22 Aug 2026
Last updated
28 Aug 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/47a65e98-fc16-4f56-81ac-7e11b6a2bd14

The source notice is authoritative — verify deadlines and documents there before bidding.