Sweden – Electricity distribution – Tender of Head-End System for Gotlands Elnät
closedGotlands Elnät AB · 556537-4724
Description
The Customers’ smart meters, supplied by Ningbo Sanxing Smart Electric Co.,Ltd. and EMH metering GmbH & Co. KG, cover categories 1–5 and include advanced features beyond the new functionality requirements introduced 2025 January 1st (accordingly to Swedish legislation (SFS 1999:716)), such as extensive power quality measurements (up to 80 series per device). Collection is primarily done by push technology via mobile networks. The number of meters total around 46,000 with the main bulk being Sanxing models and the total number of measurement series collected is around 2,3 million. Due to the expiration of the current Head-End System (HES) supplier agreement, a new procurement of HES is required. The new HES must have existing functionality that support the Customer’s meter models (Sanxing S34U18 (3PH DC and CT), Sanxing S12U18 (1PH DC) and EMH-LZQJ-XC (CT)). The Tenderer must also be able to implement functionality for the new EMH-LZQJ-SGM (CT) if not already supported by the new HES.
Key facts
- Procedure
- neg-w-call
- Contact
- info@geab.se
- Category
- services
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- ted-eu
- Notice id
- 10427-2026
- First seen
- 22 Aug 2026
- Last updated
- 28 Aug 2026
Licence EU reuse — Commission Decision 2011/833/EU ↗
Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.
GET /api/v1/tenders/4891c2b9-1250-40d5-a929-e53dee5e3e51The source notice is authoritative — verify deadlines and documents there before bidding.