Skip to content
TenderGraph

3720--Veteran’s agricultural land-clearing equipment 100% SDVOSB SET ASIDE

open

VETERANS BENEFITS ADMIN (36C10D) · VETERANS AFFAIRS, DEPARTMENT OF

Read the notice at sam-gov ↗

Value
unstated
Published
29 Oct 2026
Deadline
3 Nov 2026, 01:00 GMT · 2d left · as published, verify on the notice
Type
opportunity

Description

RFQ QUESTIONS: THERE WILL BE NO NON MANUFACTURE WAIVER. Host machine: Does the veteran currently own or plan to purchase a skid steer or compact track loader? If so, could you provide the make, model, and year? We need this information to ensure the attachments and machine-specific connections are compatible. 2020 JCB 270 Skid Steer Loader Hydraulic connections: The SOW specifies ¾-inch hydraulic quick-connect couplers for the mulching head and ½-inch couplers for the rotary cutter, with both requiring a -inch case drain. Will the veteran's machine support both configurations, or should our quotation include any necessary adapters or additional fittings? Laser grader: Does the VA require a specific blade width (7', 7.5', or 8'), or are all three acceptable? The SOW provides specifications for each size, and we want to quote the correct configuration. No, it does not require a specific witdth. 2D laser system: Does the veteran already have a compatible rotary laser transmitter and tripod? The transmitter provides the elevation reference needed for automatic laser-guided grading, while the tripod provides a stable mounting platform. If the veteran does not have these components or an equivalent setup, they would need to be included for the system to perform its intended laser-guided functions. As written, the SOW does not explicitly request these items, so could you clarify whether they should be included? NO, the veteran does not have a Laser, or Tripod. Mulching head: Page 8 specifies 36 double-carbide-tipped teeth, while the specifications table on page 9 lists 30 cutting tools with the smooth rotor. Could you clarify which configuration is required so we can ensure our quotation meets the VA's specifications? Page 9, refers to the Rotary Cutter. Performance period: What is the required timeframe for delivery, installation, testing, and training following contract award? Some of the requested equipment has lead times of up to six weeks, and the SOW does not specify a completion deadline. We want to ensure our proposed delivery schedule aligns with the VA's expectations. FLEXIBLE WITH DELIVERY. If available, could you also provide the hydraulic flow, electrical connection, and coupler specifications to ensure all proposed attachments are fully compatible? ALL SPECIFICATIONS ARE LOCATED ON THE RFQ, IN THE STATEMENT OF WORK (PAGES 8-16). The equal we plan to offer matches the 72-inch cutting width, 24 to 45 gpm high flow, 3/4-inch couplers and adjustable push bar, carries 36 carbide tools, and is rated to 4,600 psi. Its overall width is 96 inches against 85 in the table, and it weighs about 2,360 lb against 3,155. Are overall width and weight salient characteristics, or will an equal that meets the cutting and hydraulic specifications be accepted? AN EQUAL THAT MEETS ALL SALIENTS WILL BE ACCEPTED.

Key facts

Reference
36C10D27Q0009
Procedure
Solicitation
Contact
Michael J Gamby
Michael.Gamby@va.gov
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
sam-gov
Notice id
6e074bc9cc104b7099f5d764071ed1ef
First seen
30 Oct 2026
Last updated
30 Oct 2026

Licence US Government work — public domain (17 U.S.C. § 105) ↗

Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.

View at source ↗GET /api/v1/tenders/48e231a1-3de0-4f1c-b6e5-239c2a16a027

The source notice is authoritative — verify deadlines and documents there before bidding.