Skip to content
TenderGraph

Norway – Electrical circuit components – Procurement of SDU and jumper for the LoVe project

open

Havforskningsinstituttet/ Institute of Marine Research · 971349077

Read the notice at ted-eu ↗

Value
unstated
Published
20 Oct 2026
Deadline
19 Nov 2026, 11:00 GMT · 25d left · as published, verify on the notice
Type
opportunity
31220000 · Electrical machinery & apparatus31000000 · Electrical machinery & apparatus31300000 · Electrical machinery & apparatus76000000 · Services related to the oil & gas industry76500000 · Services related to the oil & gas industry76520000 · Services related to the oil & gas industry76521000 · Services related to the oil & gas industry31200000 · Electrical machinery & apparatus31224000 · Electrical machinery & apparatus31320000 · Electrical machinery & apparatus31321000 · Electrical machinery & apparatus31321500 · Electrical machinery & apparatus32000000 · Radio, television, communication & telecom equipmentNO0A2NO071

Description

The contracting authority would like to procure a Subsea Distribution Unit (SDU) and jumper for the LoVe project. (See the attached tender documentation for more detailed information. ) This procurement is for an SDU (Subsea Distribution Unit) and a jumper with a lifetime of 20 years. They shall have a depth rate of 1000 m. SDU SDU shall consist of wet-feed receivers for connecting to plug (3 kVAC) and 8-fibre plug on the entrance side. On the output side, SDU shall have 3 wet-feed electrical receivers (230 VAC) and 3 wet-feed optical receivers, of which 2 fibres for each optical receiver. SDU also has a step-down transformer that converts 3 kVAC to 230 VAC. The transformer shall be placed in an oil filled (pressure balanced) house, with redundancy. The installation of SDU shall not depend on jumpers. The contracting authority would like the existing SDU structure to be inspected and reused to the greatest possible degree (see Figure 3). It shall be modified without a loss of lifetime of 20 years, subsequent to approval by the Contracting Authority. Certification of lifting points is required. Jumper The extent of the jumper shall include offshore work with the necessary parts and materials to join the jumper on the cable end at P1 in Figure 1. The offshore work shall be carried out in accordance with agreement with the Contracting Authority. When the SDU is out on the seabed near position P1, the jumper shall be connected to the SDU. The jumper consists of a 4-pin wet-feed electrical connector (3 kVAC plug) and an 8-fibre wet-feed optical connector (plug) (design shown in Figure 2). The jumper shall be attached to the SDU and the hose shall be oil filled and long enough to be connected to the centraldu's receivers. The contracting authority would like the existing jumper structure to be inspected and reused to the greatest possible degree (see Figure 2). It shall be modified without a loss of lifetime of 20 years, subsequent to approval by the Contracting Authority.

Key facts

Procedure
neg-w-call
Contact
post@hi.no
Regime
publicSector
Category
supplies
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
725889-2026
First seen
20 Oct 2026
Last updated
20 Oct 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/4fcc2b36-66d1-47bb-afd0-b4ff25c01d2d

The source notice is authoritative — verify deadlines and documents there before bidding.