SZC CWA - Pool Bunker Construction

open

Sizewell C Limited · GB-CFS-262881

Read the notice at Contracts Finder ↗

Value
£10m–£20m
Published
19 Nov 2026
Deadline
25 Nov 2026, 14:30 GMT · 7d left · as published, verify on the notice
Type
opportunity
45210000 · Construction workLondon

Description

The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island. The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. • Passenger and goods hoists, stair cores and roof access. • Installation and commissioning of three free-issued gantry cranes. • Tented workshop, lightning protection and earthing. • Testing, commissioning, quality records and formal handover. The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme. The key scope deliverables are: • Completed design to RIBA stage 4 and coordinated construction information. • Approved contractor programme aligned to project milestones. • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. • Completed health, safety, quality and assurance records. • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. • Formal handover following operational readiness review. The timescales are as follows: The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is: • 40 weeks for the preferred rainscreen and Safe RAD solution. • 46 weeks for the 275 mm precast fallback solution. The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.

Key facts

Reference
C4N123459812
Contact
Oliver Stapley
oliver.stapley@sizewellc.com
07385513532
Contract period
6 May 2027 → 31 Oct 2028
Category
goods
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
Contracts Finder
Notice id
0a92843d-9da8-4c16-b682-33b5d72727db-922031
OCID
ocds-b5fd17-56721387-b61e-4164-a5d2-3509e5e4cbc9
First seen
19 Nov 2026
Last updated
19 Nov 2026

Licence Open Government Licence v3.0 ↗

Contains public sector information licensed under the Open Government Licence v3.0. Source: Contracts Finder.

View at source ↗GET /api/v1/tenders/50867a54-ff80-40b3-b80d-cfc44548b064

The source notice is authoritative — verify deadlines and documents there before bidding.