Skip to content

Norway – Ventilation installation work – 77.25.XX Bodin Sixth form college ventilation such as building wing K

open

Sweco Norge AS (Hovedenhet) · 967032271

Read the notice at ted-eu ↗

Value
NOK 10m
Published
19 Nov 2026
Deadline
11 Dec 2026, 11:00 GMT · 19d left · as published, verify on the notice
Type
opportunity
45331210 · Construction work42520000 · Industrial machinery45000000 · Construction workNO071

Description

Nordland County would like to carry out ventilation reconstruction for wing K at Bodinvideregående school Mørkved. Improvement of the ventilation installations at the school is the main assignment in the project. K302 Air treatment plant.Other contracts: K301 Plumbing, K401 Electro technical installations, K203 Construction Work. The school was built in 1984 and is divided in wings, from A to and including G.Fløy K was rebuilt in 2003. Planned start in wing K is at the end of the school year, summer 2027 approx. middle of June 27.The reconstruction area amounts to approx. 2,850 m2. Information on planned work that shall be carried out in summer 2027, weeks 24-32. 1st floor. wing K:• Construction work, disassembly of existing ceilings, reassembly of ceilings as well as some new ceilings.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/heating/lighting. Cabling towards central processing system. 2nd floor wing K • Ventilation, insertion on the existing ventilation channels for mounting of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work in the floor.• Electrical work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.3 floor. wing K• Ventilation, insertion on the existing ventilation channels for assembly of fire dampers VAV-damper for control of ventilation.• Construction work, disassembly of existing ceilings as well as reassembly of ceilings after technical alteration work.• Electro engineering work, new lights with LED and Dali control are to be established, necessary cabling forKNX - control of fire damper/ventilation/heating/light. Cabling towards the central processing plant.•Technical room 1 floor. Wing K, 2 aggregates are to be renovated and delivered with a new automation for control from the control system. Something is altered on the intake channel system001. On all 3 aggregates, parts of the chassi internal cover shall be covered with new bottom plates. The joint intake for all aggregates is to be altered.

Key facts

Procedure
open
Contract period
4 Jan 2027 → 4 Aug 2027
Bids opened
11 Dec 2026, 11:00 GMT
Regime
publicSector
Category
works
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
806569-2026
First seen
22 Nov 2026
Last updated
22 Nov 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/5c18248e-aee8-479e-aee0-46643f585382

The source notice is authoritative — verify deadlines and documents there before bidding.