Sweden – Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry – P3 Boiler Lot 2024
closedNorrenergi Aktiebolag · 5564299500
Description
Norrenergi AB is preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. Part of the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its liftime. Originally, the boiler P3 was designed for 76 MW but in recent years the practical maximum output has been somewhat above 50 MW. The new boiler P3 should be a wood powder fired boiler with bio-oil as alternative fuel and gas oil as reserve fuel.
Key facts
- Procedure
- neg-w-call
- Regime
- utilities
- Category
- works
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- ted-eu
- Notice id
- 684375-2024
- First seen
- 24 Aug 2026
- Last updated
- 28 Aug 2026
Licence EU reuse — Commission Decision 2011/833/EU ↗
Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.
GET /api/v1/tenders/5cf7d782-23df-4592-a74c-e37fa14e3e5eThe source notice is authoritative — verify deadlines and documents there before bidding.