Skip to content

Sweden – Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry – P3 Boiler Lot 2024

closed

Norrenergi Aktiebolag · 5564299500

Read the notice at ted-eu ↗

Value
SEK 400m
Published
11 Nov 2024
Deadline
—
Type
opportunity
45250000 · Construction work42515000 · Industrial machinerySE110

Description

Norrenergi AB is preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. Part of the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its liftime. Originally, the boiler P3 was designed for 76 MW but in recent years the practical maximum output has been somewhat above 50 MW. The new boiler P3 should be a wood powder fired boiler with bio-oil as alternative fuel and gas oil as reserve fuel.

Key facts

Procedure
neg-w-call
Regime
utilities
Category
works
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
684375-2024
First seen
24 Aug 2026
Last updated
28 Aug 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/5cf7d782-23df-4592-a74c-e37fa14e3e5e

The source notice is authoritative — verify deadlines and documents there before bidding.