Norway – Secondary school construction work – 22500 Hunndalen - new secondary school - Prequalification phase.
closedGjøvik kommune · 940155223
Description
Gjøvik municipality would like to construct a new secondary school and a multi-purpose hall as an integrated overall system in Hunndalen. The aim is to build community and belonging through practical learning situations and attractive meeting places. The construction of a new school, hall and outdoor areas is the driving force behind the area commitment in Hunndalen. Goals and initiatives can also be formulated as follows: Practical school with active learning situationsVaried teaching/learningFlerbrukshall for «alle» - active meeting place School area with active and passive meeting places. Traffic safety, heart zone and car-free area Improve childhood environment Diversity and inclusionThe project includes design proposals, negotiation, engineering design, planning and construction of the following extent: Demolition of the existing school with the accompanying facility New secondary school for 540 pupils and approx. 100 employees, likely to demolish 1-3 detached housesNy multi-purpose hall that shall be integrated with the schoolUterom, location development and area commitment Infrastructure, roads, junctions, parking etc.The project will be carried out in phases with the accompanying milestones and further project decomposition (PNS) Implementation model - Phase divided Phase 2: Concept development (ongoing) Phase 3: Concept preparation (initiated) Sub phase 3.1 - Price and design competition, with negotiations, for the Draft Project (MMI 125) Sub-phase 3.2 - Optimisation of draft project (to MMI 200) and Preliminary project (to MMI 300)BP 1 - Decision sport - political decision - Development - contract Phase 4: Implementation phase (phases 4 and 5 in Gjøvik municipality's rules)Partial phase 4.1 - Detailed engineering design (for MMI 400) Sub-phase 4.2 - Production Part phase 4.3 - Systematic completionDelphase 4.4 - Ready site inspections, Documentation and hand-over (to MMI 500) Phase 5: Trial operation and guarantee period (phases 6 and 7 in Gjøvik municipality ́s rules), for the MMI 600 Project shall be carried out as a collaboration contract for phase 3.2 based on NS8402. In the next phases (phases 4 and 5), the project shall be carried out as a turnkey contract in accordance with NS8407.
Key facts
- Procedure
- neg-w-call
- Contact
- snonos@hrpas.no
- Category
- works
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- ted-eu
- Notice id
- 249865-2025
- First seen
- 22 Aug 2026
- Last updated
- 28 Aug 2026
Licence EU reuse — Commission Decision 2011/833/EU ↗
Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.
GET /api/v1/tenders/5f1a99c1-b7a3-499a-b436-8e4d4eabdddcThe source notice is authoritative — verify deadlines and documents there before bidding.