Skip to content
TenderGraph

Industry Day - Selma AL Flood Management Risk and Bank

open

US ARMY CORPS OF ENGINEERS · DEPT OF DEFENSE

Read the notice at sam-gov ↗

Value
unstated
Published
22 Oct 2026
Deadline
28 Oct 2026, 14:00 GMT · 4d left · as published, verify on the notice
Type
update
US-AL

Description

The U.S. Army Corps of Engineers, Mobile District, will conduct an industry day to discuss the design and construction of a flood risk management and bank stabilization project near downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88. *UPDATE - The event is scheduled from 9:00 to 11:00 a.m. CDT on Thursday, October 28, 2026, at the Mobile District Office, 100 Canal St., Mobile, AL 36602.

Key facts

Reference
W9127827RA009
Procedure
Special Notice
Contact
Valerie Murphy
valerie.e.murphy@usace.army.mil
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
sam-gov
Notice id
74dec8ab48524f4aaeef27be416f30ff
First seen
22 Oct 2026
Last updated
24 Oct 2026

Licence US Government work — public domain (17 U.S.C. § 105) ↗

Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.

View at source ↗GET /api/v1/tenders/60b88314-b885-4eea-be2e-63a407a0e1b1

The source notice is authoritative — verify deadlines and documents there before bidding.