Poland – Building construction work – CWS Circulating Water Pumps (Concrete Volute)

closed

BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

Read the notice at ted-eu ↗

Value
unstated
Published
20 Jul 2026
Deadline
—
Type
opportunity
45210000 · Construction work45000000 · Construction workPL634

Description

The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project.

Key facts

Procedure
cn-standard
Category
works
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
498669-2026
First seen
22 Aug 2026
Last updated
28 Aug 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/63ce3335-b8e1-49e9-b8da-7cb2766fcaab

The source notice is authoritative — verify deadlines and documents there before bidding.