Skip to content
TenderGraph

Craft Labor and Corrosion Control Services

open

NASA KENNEDY SPACE CENTER · NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Read the notice at sam-gov ↗

Value
unstated
Published
29 Sept 2026
Deadline
—
Type
update
US-FL

Description

The general purpose of the contracts is to obtain craft labor and corrosion control services here at Kennedy Space Center. Craft labor and corrosion control includes, but is not limited to, all tasks and resources necessary to install, field fabricate and modify ground support equipment systems/subsystems to execute repairs and configuration change activities in support of Spaceport customer project. Met-Con has historically provided this service, as a subcontractor, most recently to Amentum under the Consolidated Operations, Management, Engineering and Test (COMET) contract, providing personnel who have specialized experience at KSC for over 20 years. They possess a knowledge that is critical to the execution of the Artemis mission that no other company can provide to a schedule that supports mission success. KSC's craft labor and corrosion control operations are reactive, requiring rapid adaptation as maintenance needs emerge during performance. Onboarding a new contractor would introduce schedule delays due to the learning curve and unfamiliarity with KSC-specific requirements. Met-Con is already established and integrated with the Kennedy Space Center team, making them the optimal choice for continuity. A one year, sole-source, award to Met-Con will maintain operational momentum while freeing Government resources to develop a competitive, long-term solution in support of the Administrator's direction. This requirement is critical to NASA’s Artemis campaign and its overall mission to safely land humans on the lunar surface. The Artemis campaign’s timeline, and its included mission dates, are a vital component of the government’s need. For reasons discussed below, delays to mission execution as a result of developmental challenges are likely to result in mission failure. These contracts are necessary to ensure that development of a lunar landing capability is complete in time to support NASA’s Artemis missions.

Key facts

Reference
80KSC026C0005
Procedure
Justification
Contact
Justin Fanney
Justin.H.Fanney@nasa.gov
321-867-3645
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
sam-gov
Notice id
cc8201da1b114256b24a9068b7852225
First seen
9 Oct 2026
Last updated
9 Oct 2026

Licence US Government work — public domain (17 U.S.C. § 105) ↗

Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.

View at source ↗GET /api/v1/tenders/7206596c-dac4-4f5c-bc86-73d144de8c8c

The source notice is authoritative — verify deadlines and documents there before bidding.