USCG Station Eaton's Neck Boiler Combustion Analysis and calibration
openBASE BOSTON · HOMELAND SECURITY, DEPARTMENT OF
Description
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning.
Key facts
- Reference
- 70Z02427QBOST001
- Procedure
- Combined Synopsis/Solicitation
- Contact
- Steven BellSteven.A.Bell@uscg.mil206-827-1461
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- Calendar export — the deadline as a calendar file
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- sam-gov
- Notice id
- 156ed7b92043463187dd5006a73bf74b
- First seen
- 3 Nov 2026
- Last updated
- 3 Nov 2026
Licence US Government work — public domain (17 U.S.C. § 105) ↗
Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.
GET /api/v1/tenders/82813b71-e8c2-41a6-9adb-a0d25d0c63f2The source notice is authoritative — verify deadlines and documents there before bidding.