Conversion & Commercial Fit-Out of 90 Hermon Hill E18 to 105-Place Nursery - HW/4699
openHappywoods Nursery · GB-CFS-340157
Read the notice at Contracts Finder ↗
Description
Happywoods Nursery is seeking an experienced commercial main contractor to undertake the full internal conversion, refurbishment, and fit-out of 90 Hermon Hill, South Woodford, London, E18 1QB, converting a vacant former care home into a 105-place children's day nursery with top-floor administrative offices. Scope & Design Specification Summary (per Dovetail Architects Design Brief Rev 0 & Drawings PL-100 to PL-122): - Classrooms (Babies, Toddlers & 3-5 Years): Forbo welded non-slip vinyl with matching cap & cove; 3mm plaster skim with Dulux Matt Emulsion; Rockfon Blanka dB35 suspended ceilings (600x600mm grid); veneered fire doors with vision panels, finger guards, closers/back-checks & kick plates; adult/child-height handleless base units, 28mm square-edge worktops (mason's mitre), 400mm WhiteRoc splashbacks & SS 1.5 bowl sinks. - WCs & Nappy Change: Forbo welded vinyl; 1200mm WhiteRoc wall panelling; 18mm HPL IPS enclosures & 1100mm cubicles; Armitage Shanks Contour 21 Splash WCs (305/355mm); Franke Wave trough sinks with Avon 21 self-closing taps; Concept Arc 55cm basins; full DDA sanitary packs. - First Floor Commercial Kitchen & Laundry: Full-height WhiteRoc wall panelling; handleless units; min. 2 sinks plus hand-rinse basin; 304 food-grade fully welded SS extraction canopy with baffle filters, LED lights & speed-controlled fan; dedicated AC heating/cooling. - Stair Cores, Offices & Staff Room: Forbo carpet tiles with 150x18mm single-groove MDF skirting; contrasting stair nosings; dual-height brushed 304 SS handrails; 10mm toughened clear glass balustrades; perimeter dado trunking at 850mm FFL; staff kitchenette with microwave housing & 400mm WhiteRoc splashback. - MEP & Security: Central boiler serving Low Surface Temperature (LST) radiators throughout, supplemented by air conditioning units in classrooms, offices & kitchen/laundry; L1 fire alarm & secure video intercom. - Acoustic & External Works (per Clear Acoustic Design Report CAD-26116): Continuous 2.0m absorptive acoustic timber boundary fencing (Jackson's Jakoustic or approved equal, min. 15 kg/m2 surface mass with sealed base junctions); acoustic sealing/lining to party wall adjoining 92 Hermon Hill; Falcon Way drop-off & external play surfacing. Contract & Site Terms: - Form of Contract: JCT Intermediate Building Contract with Contractor's Design (ICD) or JCT Minor Works with Contractor's Design. - Site Possession & DBS Exemption: The property is vacant and unoccupied; full site possession transfers to the Principal Contractor under CDM 2015. Because no children are on site during works, Enhanced DBS clearance is NOT required. Additional information: Site Access, Logistics & Key Notes for Tendering Contractors: Accompanied Site Visits: Site inspections at 90 Hermon Hill (E18 1QB) are strictly by prior appointment during the tender period. Contractors are strongly encouraged to inspect existing M&E incoming capacities, structural layouts, party-wall conditions, and external garden levels prior to submitting pricing. Traffic, Deliveries & Neighbour Amenity: The site sits at the junction of Hermon Hill and Falcon Way, directly adjoining residential properties (including 92 Hermon Hill and Osprey Close). Contractors must factor in a practical Traffic & Logistics Management Plan covering material deliveries, skip positioning, and strict adherence to London Borough of Redbridge permitted construction working hours. Design Brief & Acoustic Compliance: Tenderers must price strictly in accordance with the attached HappyWoods Design Brief (June 2026, Rev 0) and Clear Acoustic Design Noise Impact Assessment (CAD-26116)-specifically the continuous 2.0m absorptive acoustic timber fencing (minimum 15 kg/m² surface mass with sealed base junctions) and party-wall soundproofing specifications. Unoccupied Site / DBS Exemption: The building is vacant and unoccupied; full site possession will transfer to the Principal Contractor under CDM Regulations 2015. Enhanced DBS clearance is NOT required for construction operatives. Clarifications (RFIs): All technical or commercial queries during the tender period must be submitted through this portal's messaging function so anonymized responses can be issued simultaneously to all bidders.
Key facts
- Reference
- C4N123459404
- Contact
- Juan Machadocarolina@happywoods.co.uk07715403399
- Contract period
- 25 Jan 2027 → 7 Jun 2027
- Category
- works
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- Calendar export — the deadline as a calendar file
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- Contracts Finder
- Notice id
- 445c3b2b-388a-430e-8cab-7af5c405e3ad-921900
- OCID
- ocds-b5fd17-4bdc69b9-a8ad-4745-9a37-d89e01856ea0
- First seen
- 18 Nov 2026
- Last updated
- 18 Nov 2026
Licence Open Government Licence v3.0 ↗
Contains public sector information licensed under the Open Government Licence v3.0. Source: Contracts Finder.
GET /api/v1/tenders/b73d708a-768b-4af0-b2ae-86e28ebf65bdThe source notice is authoritative — verify deadlines and documents there before bidding.