J061--Eaton Powerware System Replacement
open241-NETWORK CONTRACT OFFICE 01 (36C241) · VETERANS AFFAIRS, DEPARTMENT OF
Description
36C24127Q0030 UPS Eaton Powerware System Replacement - RFIs Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton? Due to the complex nature of the product and criticality - Yes Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance? See answer to RFI 1 Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures? Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician. Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton? Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician. Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications? The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model. Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)? Yes, See photos. Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5? The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance. What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA. Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design. What are the existing input voltage and output voltage? Current system: Eaton Powerware 9390-80 Model 80 AC IN: 208VAC 3W 60Hz 3Phase 240A AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA DC: 384-480Vdc 204A Please provide a photo of the existing unit's data plate. See attached photos Please provide photos of the full system (standing back) and of the battery cabinet and batteries. See attached photos Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP. Confirmed What is the current battery run time, and what run time is required for the replacement? 60 minutes would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System attached Will the VA be paying invoices on a Net-30/45/60 schedule? The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.
Key facts
- Reference
- 36C24127Q0030
- Procedure
- Combined Synopsis/Solicitation
- Contact
- Shawn LawrenceShawn.Lawrence@va.gov914-737-4400 ext. 202121
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- Calendar export — the deadline as a calendar file
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- sam-gov
- Notice id
- 0972ed7abad54341b2b9e2b9fde3a568
- First seen
- 25 Nov 2026
- Last updated
- 25 Nov 2026
Licence US Government work — public domain (17 U.S.C. § 105) ↗
Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.
GET /api/v1/tenders/bec48f13-e248-4959-b227-42447455ec1bThe source notice is authoritative — verify deadlines and documents there before bidding.