Skip to content

J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT

open

245-NETWORK CONTRACT OFFICE 5 (36C245) · VETERANS AFFAIRS, DEPARTMENT OF

Read the notice at sam-gov ↗

Value
unstated
Published
12 Nov 2026
Deadline
30 Nov 2026, 13:00 GMT · 18d left · as published, verify on the notice
Type
opportunity

Description

Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.

Key facts

Reference
36C24527Q0061
Procedure
Solicitation
Contact
Keysha Gorman
Keysha.Gorman74@va.gov
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
sam-gov
Notice id
fc29e3904eb3405bab37833cd265b531
First seen
13 Nov 2026
Last updated
13 Nov 2026

Licence US Government work — public domain (17 U.S.C. § 105) ↗

Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.

View at source ↗GET /api/v1/tenders/bf3c125f-3432-4560-b7e0-6e26087ed2ab

The source notice is authoritative — verify deadlines and documents there before bidding.