HDD Horizontal Directional Drilling Framework
openNORTHERN GAS NETWORKS LIMITED · GB-COH-05167070
Read the notice at Find a Tender ↗
Description
NGN invites tenders from suitably qualified and experienced suppliers for the provision of Horizontal Directional Drilling (HDD) services to support the delivery of NGN's operational programmes across its gas distribution network. NGN's estimated annual expenditure under the Framework Agreement is approximately £1.2 million. This value is provided for indicative planning purposes only and does not constitute any guarantee, commitment or representation regarding the volume, nature, frequency or value of work that may be awarded during the term of the Framework Agreement. 1.Purpose of the Framework The purpose of the framework is to ensure NGN has access to competent, capable and responsive suppliers able to deliver directional drilling services safely, compliantly and efficiently in support of core operational activities, including: Gas Mains Replacement Reinforcement works Gas Mains Connections Diversions The framework will provide operational resilience, flexibility of capacity and value for money across all NGN operational areas. 2. Core Service Deliverables The Supplier shall provide horizontal directional drilling services as instructed by NGN from time to time, including: Safe, compliant execution of horizontal directional drilling works to facilitate the installation of polyethylene (PE) gas mains Installation of PE pipework with nominal outside diameters of: Up to 125mm O.D. 180mm O.D. 250mm O.D. 315mm O.D. 355mm O.D. Provision, operation and maintenance of all drilling plant, equipment, tooling and resources required to deliver the works Supply of competent, trained and accredited personnel appropriate to the works undertaken Delivery of works in accordance with NGN specifications, industry standards and all applicable statutory and regulatory requirements 3. Call‑Off and Work Instruction Deliverables For each call‑off or works instruction, the Supplier shall: Accept and resource works in accordance with the instructed programme and priorities Attend site as instructed and coordinate activities with NGN operational representatives and other contractors where required Deliver the works within the agreed timescales and constraints set out at call‑off stage Comply with any site‑specific requirements confirmed by NGN at call‑off stage 4. Health, Safety and Environmental Deliverables The Supplier shall: Comply at all times with NGN Health & Safety policies and procedures Ensure all personnel are competent, trained and appropriately accredited for the works undertaken Provide method statements and risk assessments as required by NGN Manage environmental impacts associated with drilling activities in accordance with legal and NGN requirements Immediately report accidents, incidents, near misses and unsafe conditions in line with NGN procedures 5. Management and Supervision Deliverables The Supplier shall provide: Effective site supervision for all drilling activities A competent point of contact for operational coordination and issue resolution Adequate management oversight to ensure quality, safety and compliance Cooperation with NGN audits, inspections and assurance activities 6. Reporting and Records Deliverables The Supplier shall maintain and provide, as required: Accurate records of works completed under each call‑off Evidence of compliance with safety, quality and technical requirements Progress updates and completion confirmations as instructed by NGN Any documentation reasonably required to support performance monitoring and assurance 7. Performance and Service Level Deliverables The Supplier shall meet the performance standards set out in the Framework Agreement, including: Compliance with agreed KPIs and SLAs Timely delivery of works Quality of workmanship Responsiveness to NGN instructions and operational priorities Performance will be monitored through NGN's contract management processes, including regular review meetings where required. 8. Interfaces and Exclusions Unless expressly stated in the relevant call‑off: The Supplier's obligations are limited to the delivery of directional drilling services Activities such as traffic management, reinstatement, permits or third‑party services are excluded and will be instructed separately by NGN where required Surveys are excluded from the standard directional drilling rates. Where expressly instructed and authorised within the relevant Call-Off and Purchase Order, surveys shall be paid using the applicable Schedule 2 rate 9. Continuous Improvement The Supplier shall support continuous improvement by: Engaging in performance reviews with NGN Identifying opportunities to improve safety, efficiency or service delivery Implementing agreed improvement actions within reasonable timescales 10. Performance Management, KPIs and Service Level Agreements 10.1 General The Supplier shall deliver the Services in accordance with the performance requirements set out in this Section. Performance will be monitored by NGN throughout the Framework Term to ensure services are delivered safely, compliantly, and in line with operational requirements. Failure to meet the KPIs or SLAs may result in escalation, the implementation of a Performance Improvement Plan, or other remedies available to NGN under the Framework Agreement. 10.2 Service Level Agreements (SLAs) SLA 10.2.1 - Mobilisation and Attendance The Supplier shall attend site in accordance with the priority of the works instruction: Emergency / urgent works: attendance within [4] hours of instruction Planned works: attendance in line with the agreed programme Target: 95% compliance per reporting period. SLA 10.2.2 - Programme Adherence Directional drilling works shall be completed in accordance with the agreed call‑off programme and timescales. Target: 95% of works completed within agreed timescales. SLA 10.2.3 - Health & Safety Compliance The Supplier shall comply fully with NGN Health & Safety requirements, approved RAMS, and statutory obligations. Targets: Zero fatalities Zero prohibition notices 100% compliance with approved RAMS and NGN safety procedures SLA 10.2.4 - Quality of Works Works shall be completed right‑first‑time with no defects or rework attributable to the Supplier. Target: 98% of works completed without defect or rework. SLA 10.2.5 - Incident Reporting All accidents, incidents and near misses shall be reported in accordance with NGN procedures. Target: Immediate verbal notification Written report submitted within 24 hours SLA 10.2.6 - Site Behaviour and Coordination The Supplier shall cooperate fully with NGN operational teams and other contractors and conduct all site activities professionally. Target: No substantiated complaints attributable to the Supplier. 10.3 Key Performance Indicators (KPIs) KPI 10.3.1 - Responsiveness Timely response to NGN instructions, communications and operational queries. Target: 95% of communications responded to within one working day. KPI 10.3.2 - Resource Availability Ability to provide adequate labour, plant and equipment to meet NGN call‑off requirements. Target: 95% of call‑offs accepted and resourced as instructed. KPI 10.3.3 - Reporting and Records Accuracy and timeliness of required records, reports and evidencing of completed works. Target: 100% of required reports submitted on time and complete. KPI 10.3.4 - Customer and Stakeholder Impact Minimisation of adverse impact on customers, highways and third parties. Target: No avoidable customer complaints attributable to the Supplier. KPI 10.3.5 - Environmental Compliance Compliance with environmental controls and requirements associated with drilling activities. Targets: Zero environmental enforcement notices Demonstrable compliance with NGN environmental procedures 10.4 Management Information The Supplier shall provide management information to support performance monitoring, including: Summary of works delivered Performance against each KPI and SLA Incidents, near misses and corrective actions Resource availability and capacity issues Management information shall be provided monthly, or more frequently where reasonably required by NGN. 10.5 Performance Review and Escalation Performance against KPIs and SLAs will be reviewed as part of NGN's contract management arrangements. Where performance falls below required standards, NGN may: Require a Performance Improvement Plan Escalate performance concerns through governance routes Restrict future call‑offs Apply other contractual remedies, including suspension or removal from the framework, where persistent underperformance occurs
Key facts
- Procedure
- Competitive flexible procedure
- Framework agreement
- Yes — a framework or dynamic purchasing system, not a single contract
- Lots
- 1
- How to submit
- The procurement process will be managed electronically via NGN's Procurement Portal Market Dojo. Any interested parties should contact the named parties on the Scope of Requirements All communication will be managed through Market Dojo. All tender response must be uploaded electronically. Tender questions should be answered in the requested format, i.e. text or attachment, and word counts adhered to where applicable. If a question requires an attachment upload as your response and you have multiple attachments, please upload these as a Zip file. If you experience any technical difficulties, please contact the person named in this document. Responses should not be submitted via the messaging portal. Suppliers should note that if they persistently fail to follow this instruction, and answers are not readily available in the correct format then this may result in failing to achieve a score in the relevant section. Suppliers should avoid uploading responses on the last day of any stage of the tender in case of technical difficulties as NGN will not reopen an event after it has closed. Suppliers may save documents in Market Dojo throughout the process but must ensure that it is submitted in full before the closing date. NGN cannot access or determine whether Suppliers have submitted a bid until after the event has closed as our process is a totally sealed bid process. It is your responsibility to ensure that you submit your bid on time. Responses must be submitted within the timeframe stated in Market Dojo.
- Contact
- dturner@nnortherngas.co.ukprocurement@northerngas.co.uk
- Value incl. VAT
- £1.4m
- Category
- services
What a subscription adds to this notice
- The documents — every attachment, with its text extracted and searchable
- Qualification — the notice scored against your company profile
- Tracking and alerts — a pipeline for your bids, and the matching notices by email
- Calendar export — the deadline as a calendar file
- The API and MCP — the same record in your own tools and your AI assistant
Provenance
- Source
- Find a Tender
- Notice id
- 109881-2026
- OCID
- ocds-h6vhtk-07bfcd
- First seen
- 19 Nov 2026
- Last updated
- 19 Nov 2026
Licence Open Government Licence v3.0 ↗
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender.
GET /api/v1/tenders/d224fd08-1add-497c-bf6c-8c263b439214The source notice is authoritative — verify deadlines and documents there before bidding.