Skip to content
TenderGraph

Slovakia – Batteries – Implementation of Battery Energy Storage System at Čierny Váh

open

Slovenské elektrárne, a.s. · 35829052

Read the notice at ted-eu ↗

Value
unstated
Published
27 Oct 2026
Deadline
26 Nov 2026, 09:00 GMT · 30d left · as published, verify on the notice
Type
opportunity
31440000 · Electrical machinery & apparatus71300000 · Architectural, construction, engineering & inspection services31321300 · Electrical machinery & apparatus03111200 · Agricultural, farming, fishing & forestry products31321210 · Electrical machinery & apparatus45000000 · Construction work31321000 · Electrical machinery & apparatus45255400 · Construction work71632000 · Architectural, construction, engineering & inspection services80531200 · Education & training services31214000 · Electrical machinery & apparatusSK031

Description

The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and services: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market services, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and services necessary to ensure safe, reliable and long-term operation of the BESS installation.

Key facts

Procedure
neg-w-call
Regime
utilities
Category
supplies
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
742901-2026
First seen
27 Oct 2026
Last updated
27 Oct 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/e1aefa37-7550-4653-a947-eed8572ee928

The source notice is authoritative — verify deadlines and documents there before bidding.