Skip to content

Retention — 3-4 Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22

open

South Dublin County Council (planning authority)

Read the notice at Planning (Ireland) ↗

Value
unstated
Published
18 Nov 2026
Deadline
21 Jan 2027, 00:00 GMT · 57d left · as published, verify on the notice
Type
planning
45000000 · Construction workIreland

Description

Retention and permission for the completion of alterations to the permitted Energy Centre under Reg. Ref.:SD23A/0158, which arose during detailed design/ construction stage of the project: • Amendments to the permitted Air-Cooled Condensers (ACC) steel structure including changes to the shape of the condensers from a forced draft configuration (A-Frame) to an induced draft configuration (W-frame) resulting in an increase in overall height from c.25.4m to c. 26.8m; • Amendments to the permitted Air-Cooled Condensers (ACC) compound including the provision of an E-House room to the east of the compound and an additional Instrument Air (IA) apparatus to the south of the compound; • Amendments to the permitted Heat Recovery Steam Generators to include the relocation of the associated stacks and reduction in stack height from c. 33m to c. 29.6m; • Amendments to the permitted water treatment plant from a closed to an open structure and revisions to the overall layout comprising water treatment equipment within an open steel structure c. 20.8m in height; • The addition of a firewall between each individual gas/ steam transformer with a height of c. 4.4m located to the west of the site; • Amendments to the permitted MV/LV building to the south of the site to include an external plant area at second floor level; • The provision of a single storey switch gear room located to the south of the site with an overall height of c. 3.6m; • The provision of an additional fuel tank resulting in a total of 4 no. fuel tanks with an increased height of c. 18.1m; • Amendments to the permitted sprinkler tanks to include 1 no. singular sprinkler tank with an overall height of c. 13.4m and reconfiguration of the permitted fire pump room; • Amendments to the access arrangements on the northern and southern boundary, security fencing, reconfiguration of existing car parking to the south of the Power Trunk Building, the addition of a new swale in the west of the site, site lighting and all associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.

Key facts

Procedure
Retention
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
Planning (Ireland)
Notice id
South Dublin County Council/SD26A/0276W
First seen
25 Nov 2026
Last updated
25 Nov 2026

Licence CC BY 4.0 ↗

Source: Department of Housing, Local Government and Heritage — National Planning Applications (data.gov.ie), licensed under CC BY 4.0.

View at source ↗GET /api/v1/tenders/e1be37f8-672a-4c46-8d36-37edafe5fdb0

The source notice is authoritative — verify deadlines and documents there before bidding.