Skip to content
TenderGraph

Finland – Ancillary works for pipelines and cables – Pre-qualification of Supply Cable for Nuijala Heat Station

closed

Fortum Power and Heat Oy · 0109160-2

Read the notice at ted-eu ↗

Value
unstated
Published
28 Aug 2024
Deadline
—
Type
opportunity
45232000 · Construction workFI1B1

Description

Fortum Power and Heat Oy is building a heat plant in Nuijala, Espoo and the connecting district heatinglines to distribute the heat to Espoo district heating network. Heat will be produced by electric boiler which is connected also to a heat accumulator (20 000m3), The heating capacity of the plant is approximately 50 MW (Megawatt).The new heat plant shall be ready for commercial operation in the end of 2025. The scope of supply comprises of the following ITEM(s) •ITEM 01: Installation of cable protection pipes for MV and HV-supply cables (cabling route length approx. 700m in urban area)oPermission administration, excavating works, traffic control, residual, reconstruction roadworks, excavating area restoration worksoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works at construction site • ITEM 02: Installation of 20kV MV-supply cables between existing substation and existing medium voltage switchgear (20kV).oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works of supply cable at construction site •ITEM 03: Installation of earthing continuity conductors and optical fibre pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works at construction siteOPTION •ITEM 04: Installation of 110kV HV-supply cable between existing substation and existing main transformer 110/20kV.oCable pulling in cable protection pipes (cabling route length approx. 700m in urban area)oCable termination and connection works in both endsoProcurement of material/equipment/devices/workoinstallation, testing and commissioning works of supply cable at construction site All ITEM(s) include equipment and system design, permission administration, excavating works, traffic control, residual and reconstruction roadworks, procurement of material/equipment/devices/work, deliv-ery, installation, testing and commissioning works at construction site excavating area restoration works

Key facts

Procedure
comp-dial
Regime
utilities
Category
works
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
ted-eu
Notice id
516803-2024
First seen
24 Aug 2026
Last updated
29 Aug 2026

Licence EU reuse — Commission Decision 2011/833/EU ↗

Source: TED — Tenders Electronic Daily (ted.europa.eu), © European Union, reused under Commission Decision 2011/833/EU.

View at source ↗GET /api/v1/tenders/f3a6e889-13fc-444d-b39c-7e60dd334610

The source notice is authoritative — verify deadlines and documents there before bidding.