Skip to content

Rosebud Lift Station Construction

open

DIV OF ENGINEERING SVCS - SEATTLE · HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Read the notice at sam-gov ↗

Value
unstated
Published
25 Nov 2026
Deadline
1 Dec 2026, 22:00 GMT · 6d left · as published, verify on the notice
Type
opportunity
US-SD

Description

Amendment A01: 1. The purpose of this solicitation amendment A01 is to update the Contract Specialist. 2. The Contract Specialist and point of contact for this action is changed from Daniel Cotto to Robert Miller. 3. Robert Miller's contact information is Robert.Miller2@ihs.gov, 325-518-0521. 4. All other terms and conditions remain unchanged. The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.

Key facts

Reference
75H70127R00007
Procedure
Solicitation
Contact
Robert S. Miller
robert.miller2@ihs.gov
2147678589
  • The documents — every attachment, with its text extracted and searchable
  • Qualification — the notice scored against your company profile
  • Tracking and alerts — a pipeline for your bids, and the matching notices by email
  • Calendar export — the deadline as a calendar file
  • The API and MCP — the same record in your own tools and your AI assistant

Provenance

Source
sam-gov
Notice id
2550bb46570d425a8ef929647ca0577a
First seen
26 Nov 2026
Last updated
26 Nov 2026

Licence US Government work — public domain (17 U.S.C. § 105) ↗

Source: SAM.gov, U.S. General Services Administration — a U.S. Government work, not subject to copyright in the United States.

View at source ↗GET /api/v1/tenders/f71cb018-e948-40e5-87eb-5fccc0903c57

The source notice is authoritative — verify deadlines and documents there before bidding.