Supplier profile
THE AEROSPACE CORPORATION
Every public-sector award we hold for this supplier, across Australia and the United States, from 10 Jun 2011 to 17 Aug 2026.
Awards won
539
all time
Attributed value
$1.2bn + AUD 7.9m
as published
Buyers
12
public bodies
Active
2011–2026
first to latest award
Awards by year
Who they win from
| Buyer | Awards | Value |
|---|---|---|
| National Aeronautics and Space Administration | 471 | $823.4m |
| National Oceanic and Atmospheric Administration | 32 | $104.2m |
| Federal Aviation Administration | 14 | $3.3m |
| Department of Energy | 5 | $198.8m |
| U.S. Geological Survey | 5 | $20.3m |
| Department of State | 3 | $1.8m |
| Geoscience Australia | 3 | AUD 7.5m |
| Department of the Air Force | 2 | not attributable |
| Department of Industry, Science and Resources | 1 | AUD 343k |
| Executive Office of the President | 1 | $79k |
What they win
Awards
Showing 451–475 of 539 awards we hold
- Igf::ot::igf Ffrdc Support. Task Order Award. ↗National Oceanic and Atmospheric Administration£403kawarded 26 Jan 2017
- Igf::ot::igf Office Of Chief Financial Officer (Ocfo) Strategic Investments Division (Sid) Programmatic Analysis Support. The Contractor Shall Provide Support To Sid In The Following Initiatives: Agency Programmatic Analysis Capability (Apac),nasa Strategic Investment And Value Evaluation (Strive), And NASA Agency Mission Planning Model (Ampm). ↗National Aeronautics and Space Administration£50kawarded 23 Jan 2017
- Igf::ot::igf Programmatic Assessment&technical Expert Support Of Nuclear Thermal Propulsion (Ntp). ↗National Aeronautics and Space Administration£28kawarded 12 Jan 2017
- Igf::ot::igf Esto Program Integration Support. ↗National Aeronautics and Space Administration£190kawarded 11 Jan 2017
- Igf::ot::igf " International Space Station (Iss) Express Logistics Carrier (Elc) Reverse Capacitor Follow-On Testing " - The Scope Of This Effort Is For The Contractor To Conduct Vacuum Testing Of Reverse-Polarity Capacitors For The Elc. The Data Collected Will Augment Results From A Previous Assessment Where Similar Tests Were Conducted In Air And Will Aid In Establishing Temperature-Dependent Time-To-Failure Predictions. ↗National Aeronautics and Space Administration£111kawarded 11 Jan 2017
- Igf::ot::igf "nesc (National Aeronautics And Space Administration Engineering&safety Center) Molded Avcoat Block Bond Verification " - The Scope Of This Effort Is For The Contractor To Provide Assistance In The Development Of A Bond Verification Plan For The New Orion Heatshield Architecture Which Uses Individual Molded Blocks Of Ablator Material (Avcoat) Adhesively Bonded To The Carrier Structure. Major Elements Of The Bond Verification Plan Will Include 1) Process Controls; 2) Effects Of Defects; 3) Proof Testing; And 4) Non-Destructive Evaluation (Nde). ↗National Aeronautics and Space Administration£868kawarded 6 Jan 2017
- Igf::ot::igf The Vendor Will Conduct Space Technology Mission Directorate (Stmd) Non-Traditional Partnerships, Entitled Space Technology Mission Directorate (Stmd) Non-Traditional Partnership Study. The Contractor Will Expand The Current External Capabilities Assessment Process (Ecap) Effort And Will Conduct An External Benchmarking Of Other Sectors That Are Developing Technologies Of Value To National Aeronautics Space Administration (NASA) Mission. Nasas Space Technology Mission Directorate (Stmd) Has Deep Knowledge Of The Aerospace Industry, Its Technologies And The Applicability Of These ↗National Aeronautics and Space Administration£303kawarded 16 Dec 2016
- Igf::ot::igf Igf::ot::igf Exploration And Space Communications (Esc) Projects Division Is Responsible For The Procurement Of Esc Systems And Activities In All Engineering Lifecycle Phases. This Includes Procurement Of Operations, Maintenance And Sustainment Support As Well As Procurement Of New System Elements And The Modification Of Existing Systems Needed To Operate Satellites And Space And Ground Networks. These Systems Include Computers, Communications, Radio Frequency (Rf) Equipment And The Associated Hardware And Software, As Well As Build, Maintain And Upgrade The Physical Infrastructur ↗National Aeronautics and Space Administration£285kawarded 1 Dec 2016
- Igf::ot::igf "nesc (National Aeronautics And Space Administration Engineering&safety Center) Independent Verification Of Space Launch System (Sls) Block 1 Prelaunch, Liftoff, And Ascent Gust Methodology And Loads " - The Scope Of This Effort Is For The Contractor To Provide Independent Verification Of The Sls, Gsdo Mobile Launcher, And Orion Mpcv Vehicles Pre-Launch, Liftoff, And Ascent Gust Loads, Using Tools Developed By Independent Coupled Loads Contractors. Comparisons Will Be Made To The Sls Design Analysis Cycle (Dac) 3r Or Vac 1 Analyses. Structural Assessment Of The Resultant Loads I ↗National Aeronautics and Space Administration£150kawarded 16 Nov 2016
- Igf::ot::igf The Aerospace Corporation Will Provide Technical Analyses And Assessment Services To Assist In Technically Evaluating United Launch Alliance (Ulas Work On The Sls Icps Inca, Icps Emulator, And Icat. Specifically, Aerospace Will Provide Spie With Technical Evaluations Pertaining To The Compliance Of Ulas Icps Flight Software (Fsw), As Well As Provide Spie/Gsdo With Technical Evaluations Pertaining To The Compliance Of Ulas Icps Emulator And Icat Ground Software (Gsw), To NASA Procedural Requirements (Npr) 7150.2b, NASA Software Engineering Requirements. ↗National Aeronautics and Space Administration£492kawarded 15 Nov 2016
- Igf::ot::igf " Loads And Dynamics Technical Discipline Team (Tdt) Participation " - The Scope Of This Effort Is For The Contractor To Participate On The L&d Tdt And On Multiple Nesc Technical Consultations Or Investigations Related To L&d. ↗National Aeronautics and Space Administration£135kawarded 9 Nov 2016
- Igf::ot::igf " NASA Engineering And Safety Center (Nesc) Electrical Power Technical Discipline Team (Tdt) " - The Scope Of This Effort Is For The Contractor To Make And/Or Express Expert Opinion, Advice, And Guidance On Power Systems And Other Related Areas Of Interest; Perform Quick Response And Initial Evaluations Of Independent Technical Assessment Requests; And Support The NASA Technical Fellow By Performing Short Duration Special Discipline Studies, As Needed. The Contractor Shall Perform Technical Research, Technical Reviews, And Analysis On Power Systems Related Materials, Submit Findin ↗National Aeronautics and Space Administration£149kawarded 3 Nov 2016
- Igf::ot::igf NASA Oig Audit Of Nasas Plans For Human Exploration Beyond Low-Earth Orbit. Aerospace Will Review For Accuracy, And Then Update Jpls Feasibility Study In Accordance With The Following: A. Confirm The Accuracy Of The Methodology, Formulas, And Data Used In The Jpl Journey To Mars Feasibility Study, Updated July 2016, And Its Supporting Documents. Identify Any Discrepancies In Writing Indicating The Document's Name, The Page Number, Error Found, And The Recommended Change. ↗National Aeronautics and Space Administration£9kawarded 28 Oct 2016
- Igf::ot::igf " Center Burst Cracks Present On Bearing Balls In NASA Mechanisms " - The Scope Of This Effort Is For The Contractor To Obtain All Available Test Reports On Defective Balls, Including Root Cause And Corrective Actions; Evaluate The Likelihood And Associated Risk To Affected NASA Programs And Project; And Develop A NASA Position Statement. ↗National Aeronautics and Space Administration£44kawarded 26 Oct 2016
- Igf::ot::igf Cislunar Study - The Cislunar Study Project Will Provide An Initial Survey Of Strategic/Operational Opportunities And Threats For The U.s. In The Region From Geo To The Moon's Orbit. This Will Focus On The Art Of The Possible And Understanding The Strategic Implications Of This Region. The Project Will Require Specific Contractor Capabilities Including System-Of-Systems Engineering, Technology Application And Space Systems Development. ↗National Aeronautics and Space Administration£184kawarded 19 Oct 2016
- Igf::ot::igf The Center Director At The NASA Goddard Space Flight Center (Gsfc) Is Responsible For Managing The Centers Diverse And Complex Research And Development Portfolio; Formulating The Centers Future Science And Technology Goals And Leading An Integrated Program Of Investments And Initiatives Aligned To Meet Those Goals. Accordingly, Aerospace Shall Provide Qualified Technical Expertise To The Goddard Center Director To Conduct Assessments Of NASA Programs And Projects, Project Management, Science, Engineering And Technology In Accordance With The Priorities As Established By The Center ↗National Aeronautics and Space Administration£3.1mawarded 4 Oct 2016
- Igf::ot::igf The Commercial Partnerships Portfolio Within NASA's Space Technology Mission Directorate (Stmd) Encompasses Six Key Programs: (1) Flight Opportunities, (2) Small Business Innovation Research (Sbir) / Small Business Technology Transfer (Sttr), (3) Centennial Challenges, (4) Prizes&challenges, (5) Regional Economic Development, And (6) Emerging Space Grants. These Programs Represent A Key Aspect Of NASA's Strategy To Stimulate The Commercial Space Industry And Spark Economic Growth, While Leveraging The Industry's Commercial Capabilities Through Public-Private Partnerships, To Deliv ↗National Aeronautics and Space Administration£299kawarded 30 Sept 2016
- Igf::ot::igf " An Industrial Base Study On The World Wide Foundry Capability For Space Systems To Include Both Trusted And Rad Hard Capability " - The Scope Of This Effort Is For The Contractor To Study Will Identify Suppliers And Capabilities Worldwide For Semiconductor Technology. Once Identified, The Capability Will Be Broken Down Into Categories Including Such Areas As: Technology Nodes, Capacity, Wafer Size, Amount Of Product Delivered, Rad Hard Capability And If This Capability Could Be Utilized For NASA And Department Of Defense (DOD) Programs. ↗National Aeronautics and Space Administration£294kawarded 29 Sept 2016
- Igf::ot::igf Third Tabletop Exercise (Ttx#3)for Neo Warning And Impact Event In Support Of The Planetary Science Division. Provide The Following Services: Work With The National Aeronautics And Space Administration (NASA) And The Federal Emergency Management Agency (Fema ) To Develop The Logistics For The Tabletop Exercise. This Includes Establishing The General Flow Of The Exercise, The List Of Individuals To Be Invited To Participate, The Materials To Be Provided To Each Participant Before, During, And After The Exercise, The Location And Time Of The Exercise, And The Integration Of The ↗National Aeronautics and Space Administration£60kawarded 28 Sept 2016
- Igf::ot::igf " Nesc (NASA (National Aeronautics And Space Administration) Engineering And Safety Center). Sensors And Instrumentation Technical Discipline Team (Tdt) Support " - The Scope Of This Effort Is For The Contractor To Participate As A Member Of The Nesc Sensors And Instrumentation Technical Discipline Team. As Members Of This Team, Technical Experts From The Contractor Shall Participate In Team Meetings, Provide Expert Analysis, Advice, Consultation, And Guidance Support To The Team Leader And Prepare Appropriate Sections Of Team Reports And Findings. ↗National Aeronautics and Space Administration£134kawarded 27 Sept 2016
- Igf::ot::igf " Participation On The Nesc Passive Thermal Technical Discipline Team (Tdt) " - The Scope Of This Effort Is For The Contractor To Provide Technical Consultations, Investigations And Analyses As Requested By The NASA Technical Fellow (NASA Tf). ↗National Aeronautics and Space Administration£92kawarded 15 Sept 2016
- Igf::ot::igf Specialized Engineering, Evaluation And Test Services (Seets Ii) Contract. Task Order Number Seventy-Five (75). Task Order Title: Aerospace Support To Goes-R Ground For Navy Radio Frequency (Rf) Support. The Aerospace Corporation Will Perform A Comprehensive Assessment Of The Radio Frequency (Rf) Environment Of Selected United States (U.s) Naval Sites Identified In The Department Of Defense (DOD) Transition Plan From Both A Potential For Radio Frequency Interference (Rfi) Perspective And From An Operational Perspective To Examine Possibilities For Reducing Or Mitigating Radio ↗National Aeronautics and Space Administration£685kawarded 15 Sept 2016
- Igf::ot::igf Science Mission Directorate (Smd) Programmatic Assessment And Monitoring. The Contractor Shall Provide Independent Programmatic And Technical Assessment Functions That Can:(1) Identify And Assess Project Risks Whether Technical, Cost And Schedule Related And Predict The Probabilities And Consequences Of Their Realization; (2) Predict The Growth Of Project Costs And Schedules Over Time Due To Risks And Uncertainty; And (3) Communicate Results And Findings In A Clear, Concise Manner To Smd Program Executives (Pes), Program Analysts (Pas), Theme Directors, The Science Mission Dire ↗National Aeronautics and Space Administration£13.8mawarded 7 Sept 2016
- Igf::ot::igf Task Order Title Is The Mars Organic Molecule Analyzer Moma Wrp Support Purpose, Objective, And Background Of Work To Be Performed: The Mars Organic Molecule Analyzer Moma Instrument Is A Combined Gas Chromatograph Mass Spectrometer Gc Ms Payload On A Landed Mars Rover Being Developed By The European Space Agency Esa And Is Part Of The Exomars Program. Moma Is A Joint Collaboration Between The US And The Max Planck Institute For Solar System Research Mps In Germany, With Mps As The Lead Institution Responsible For Delivering Moma To Esa. The US Moma Flight Hardware Is Currently S ↗National Aeronautics and Space Administration£9kawarded 30 Aug 2016
- Igf::ot::igf Icesat 2 Star Catalog Revision Specialized Engineering, Evaluation And Test Services (Seets Ii) To Select An Improved Spectral Model For The Laser Reference System (Lrs) Sensitivity To Stars In The Source Catalog. The Selected Model Should Be Documented In A Short Technical Note. The Icesat-2 Project Has Decided To Revise The Laser Reference System (Lrs) Specific Star Catalog, Implementing Some Of The Reviewers Recommendations To Mitigate Associated Risks To Ground Processing Of Flight Data. To Provide Support To Investigate Potential Improvements In The Star Magnitudes To Suppo ↗National Aeronautics and Space Administration£80kawarded 26 Aug 2016
Bidding against them?
Get new tenders in their space in a daily digest, scored against your own capability — plus the full notice behind each of these awards, with the documents and contacts it published.
Start 7-day free trialHow this profile is built
Awards are collected from official public procurement notices and deduplicated so one procurement counts once. Supplier names are grouped across their published spellings: case and punctuation are ignored, and “Ltd” is treated as optional because buyers routinely leave it off. Everything else that marks a different organisation is kept — an LLP, a plc, a CIC and a Teoranta are separate businesses from a Ltd of the same name, as are a parent and a named subsidiary, and none of them are merged here. Where another entry differs from this one only by legal form or a bracketed qualifier it is listed above as possibly the same organisation — a hint for the reader, never a merge: figures are per legal entity and never combined. Value is attributed only where the notice is explicit: the supplier's own itemised amount, or the whole value where they were the sole named supplier. Awards naming several suppliers without a published split are counted and marked shared, never valued, and a framework ceiling is never treated as money any one appointed supplier won. Sterling and euro are never added together. The linked source notice is authoritative.
Company pages are for organisations. If this page profiles you as an individual — a sole trader or an individual contractor — you can ask for it to be withheld: see how.